|
| 1 | Supplying and stacking of good earth at site including royalty and carriage with all lead and lift. (Good earth measured in stacks will be reduced by 20 % for payment) |
| 2 | Supplying and stacking of jamuna sand at site I/C royalty, carriage andloading / un loading for all leads and lifts. |
| 3 | Diggingholes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2: 1 by volume (2 part of stacked volume of earth after reduction by 20 %: 1 part of stacked volume of manure after reduction by 8%) flooding with water dressing including removal of rubbish and surplus earth .if any with all leads and lift (cost of manure. sludge or extra good earth if needed to paid for separately).i) SIZE 0.90m. dia and 0.90m. deep |
| 4 | ii) SIZE 0.60m. dia and 0.60m. deep |
| 5 | iii) SIZE 0.45m. dia and 0.45m. deep |
| 6 | Supply of Neem oil Cake at site in gunny bags/ plastic bags (in 40 kg packing) |
| 7 | Supply of Chlorpyriphos 20% E.C/ Lindane 20% E.C as per specification at site (Packing in one Ltr./ 5 Ltr. |
| 8 | Preparation of beds for hedging and shrubbery by excavating 60 cm. deep and trenching the excavated base to a further depth of 30cm. refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 Part of stacked volume of earth after reduction by 20 %: one part of stacked volume of sludge or manure after reduction by 8%). Flooding with water filling with earth if necessary. Watering and finally fine dressing, levelling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and levelling as directed within a lead of 50 m lift upto1.5 m. complete (cost of sludge. Manure or extra earth to be paid for seprately). |
| 9 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be leveled and neatly dressed. All kinds of soil. (for manure pits) |
| 10 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, as per directions of Engineer-in-charge. All kinds of soil |
| 11 | Supplying of Safeda Balli 125 mm diameter at site (Length of balli as per direction of site incharge) |
| 12 | Supplying of G.I. Barbed wire at site. [barbed wire weighting 9.38 kg. per 100 metres] |
| 13 | Edging with bricks laid dry length wise, including required excavation, refilling, consolidating with hand packing and spreading surplus earth neatly within a lead of 50 m :2.19.1 Common burnt clay F.P.S (non modular) bricks of Classdesignation 7.5 |
| 14 | Providing and fixing of Tuflex Garden fencing hexagonal net/ or equivalent of green colour having contents (Weight grams/sqm. 510 )+/- 8%) in width of 60 cm. with bamboo of 90 cm. length. The bamboo should be painted with green colour paint of approval brand and manufacture (two or more coats) and fixed 30 cm. below ground level and 60 cm. above ground level at a distance of 1.50 mtrs. The net and bomboo should be binded with 2 mm. G.I. wire at three places properly as per direction of Engineer-in-charge. |
| 15 | Providing & laying Selection no. 1 doob grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same maintenance for30 days or more till the grass establish properly,as per direction of officer in charge. |
| 16 | Supply of Mass Grass Stick 3\" Ft. Height with Mass grass at site. |
| 17 | Supply of Mass Grass at Site |
| 18 | Provision of ploythene bags at site. i) Supply of polythene bags size 12.5 cm diaX 17.50 cm ht. (gauge 175) both layer at site. |
| 19 | ii) Supply of polythene bags size 15 cm dia X 20 cm ht. (gauge 220) both layer at site. |