Design And Engineering, Supply, Supervision Of Erection, Testing, Commissioning And Performance Guarantee Test And Training Of Automation System For Secondary Emission Control System Required For Sms-Ii Of Sail-Bsp, Bhilai, Chhattisgarh , Supply Of Equipment [Part-A] , Redundant Plc Based Automation System For Secondary Emission Control System For Sms-Ii As Per Ts & Automation Configuration Drawing Including Plc Panel, Processors, Power Supply Cards, Ri/O Panels, One Number Pc Based Hmi Operator Station Cum Engineering Station (27”), Laptop Based Engineering Station, One Number A4 B/W Laser Printer (With Consumables Viz. Spare Cartridge, Papers, Etc.), Network Switches, Redundant Gateway (Protocol Converter) If Required, Along With Required Operating, Programming & Hmi Software, Licenses, Opc Compliant Licenses If Required, And Related Accessories I.E.Patch Cables, Media Converters, Racks, Control Desk, Etc., For Making The Automation System Complete & Interfaced With Converter Automation System. , Multimode Unarmoured 6 Core Fiber Optic Cable , Pc (Hmi-2) As Per Ts (27”) , Client License For Hmi-2 (Of Make Of Server Of Converter Automation) , 10 Kva Parallel Redundant Ups Having 30 Minutes Backup And Common Battery Bank, Specification As Per Tswith Acdb , 7.5 Kva Parallel Redundant Ups Having 30 Minutes Backup And Common Battery Bank, Specification As Per Tswith Acdb , Special Tools And Tackles , List Of Minimum Commissioning Spares* , Di Card , Do Card , Ai Card , Rtd Card , Smps , Interposing Relay Board , Fused Tb With Led , *Supply Of All Commissioning Spares, As Required During Testing And Commissioning Till Handover To Client Is In Scope Of Bidder , Man-Power Requirement For Supervision - [Part B] , Supervision Services During Erection & Testing, Deputation Of Expert For Initial Checking Includingsimulated Checks, Trial Run, Commissioning And Performance Guarantee Till Handing Over Of Secs To Employer (Bsp) On Man-Day Basis. Number Of Visit Shall Be Minimum 5 Numbers (As Per Letter From Mecon For Deputation) Note: Man-Day Rate To Be Quoted By The Bidder. , Training - [Part C] , Training At Oems Location For 2 Engineers For 2 Days , Training At Site For 5 Engineers For 3 Days