Road Permanent Restoration Of Road From Hasplote To Pangai Pkg.Jk-12-330 , Clearance Of Drain Including Disposal Of Excavated Malba Lead As Directed By Er.Incharge Without Demaging Public And Private Properts y , Excavation For Structures:-Earthwork In Excavation For Structures As Per Drawings And Technical Specifications Clause 305.1 Including Setting Out, Construction Of Shoring And Bracing, Removal Of Stumps And Other Deleteriousmaterial And Disposing Ofsurplus, Un-Serviceable Excavated Earthas Directed At Site For Safe Disposal Of Same Without Damaging Private/Public Property, Dressing Of Sides And Bottom And Backfilling In Trenches With Excavated Suitable Material Including De Watering If Required. , Providing And Lying Of Plain Cement Concrete Of Grade M-10In Open Foundations Complete As Per Drawings And Technical Specifications. Clause 802, 803, 1202 & 1203.Including All Leads, Lifts And Carriages Of Materials By Mt Complete. , Providing And Laying Of Plain Cement Concrete Of Grade M-15In Substructure Complete As Per Drawings & Technical Specification Clauses 802, 804, 805, 806, 807, 1202 & 1204. Including Cost Of Curing, Form Work, All Leads And Lifts And Carriages Of Materials By Mt Complete.With 20% Plum , Providing And Laying Of Plain Cement Concrete M-20 Grade Mix With 20Mm-10Mm Size Crushed Stone Aggregate As Per Drawings And Techinical Specification Clause 802, 803, 805, 806, 807, 808, 811, 815, 817,1202, 1204 Including Curing And Form Work With Steel Shuttring Including All Leads Lift And Carriages By Mechanical Transport Complete.(In Coping & Flooring). , Providing And Laying Ofboulder Apron Laid In Wire Crate Excavation 4Mm Dia G.I Wire Conforming To I.S 280 And I,S 4826 In 100Mm X 100Mm Mesh Woven Diagonally Including 10% For Laps And Joints Laid With Strong Boulders Weighting Not Less Then 25Kgs.Each As Per Drawing And Techinical Specification Claus 1301 Including All Lead And Lift Handling And Re Handling Carriage Complete. , Polygonal/Random Rubble Masonry Laiddry Un Coursed Brought To Course In Sub Structure Including Cost Of Bond/Through Stones, Also Including All Leads, Lifts, Carriages,Of Materials By Mt Handling And Re-Handling Complete. , Polygonal/Random Rubble Masonry Laidun Coursed Brought To Course In 1:6 Mix Sand Mortar With Quary Stonein Sub Structure Including Cost Of Bond/Through Stones And Leveling With M-5 Grade Cement Concrete Mix , Also Including All Leads, Lifts, Carriages,Of Materials By Mt Handling And Re-Handling Complete. , Backfilling Behind Abutment, Wing Wall And Return Wall With Available Stone From Earth Work Complete As Per Drawings & Technical Specification Clause 1204.3.8 , Reinforcement For Rcc Work Including Straightining,Cutting,Bending,Binding,And Placing In Position Using Tmt Bars Fe-500D Or More Of Approved Brand Ad Directed By Er.Incharge All Complete.