Supplying Of Materials For The Construction Of Nrlm Shed 1512004008/Av/Gis/11000307 Chirasthahalli Gp - Add Watering Charges At 1 Percentage On Material Mg,Add Watering Charges At 1 Percentage On Labour Mg,Add Sundries Charges At 1 Percentage On Material Mg,Add Sundries Charges At 1 Percentage On Labour Mg,Mi.Er Concrete1 Cum Capacity Mg,Mi.Er Concrete Small Used In Culvert Mg,Hom Of Vibrator 0.71 Days Mg,Size Stone 20 . 20 . 25 Cms Mg,Broken Stone Aggregate 40 Mm Size Mg,Broken Stone Aggregate 20 Mm Size Mg,Broken Stone Aggregate 12 Mm To 10 Mm Size Mg,Boulders Mg,Bond Stone 20. 20 . 45 Cm Mg,Plasticizer Per Super Plasticizer Mg,Coarse Sand Zone 3 Mg,Portland Cement Mg,Ms Flat Mg,Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3Percentage On Cost Of Paint Mg,Add Providing And Removing Scaffolding At 3Percentage On Labour Mg,Add Hom Of Welding And Grinding Machine At 4Percentage On Material Mg,Add Handling , Loading And Unloading At 2Percentage On Material Mg,Add Handling , Loading And Unloading At 1Percentage On Material Mg,Add Cutting And Other Wastage 5Percentage,Add Brush At 1Percentage On Cost Of Paint Mg,Mason Class 1 With Tools Mg,Painter Class 1 Mg,Hom Of Machinaries For Planing Mg,Welder Grade 1Mg,Fitter Class 1 Mg,Tmt Bars Fe 500 Mg,Soild Partical Board Flush Doors 30 Mm Thick Mg,Rubber Beading For Shutters Beading Mg,Ready Mi. Primer Paint Ready Mi. Red Lead Paint,Mathi Pernandi Wood Planks For Panels 25 Mm Thick Mg,Enamel Metal Paint Mg,Casurina Poles 100 150 Mm Mg,Alluminium Tower Bolt 20 Cm Mg,Binding Wire Mg,Formwork, Centering And Scaffolding For Chejjas, Canospy And Other Architectural Projections Of Minosr Sections 45Percentage Mg,M.S Rods Mg,Pvc Beading Mg,Vitrified Tiles 600.600 Mm Mg,P.V.C. Flushing Cistern 10 Lts Low Level With Fitting Mg,Orissa Pattern Of Size 580.440Mm With Integral Type Foot Rests Mg,M.S. Holder Bat Clamp 32Mm Mg,G.I. Overflow Pipe 20Mm Dia Mg,G.I. 32Mm Dia Telescopic Flush Pipes With Fittings Specials Mg,C.I. Per M.S. Brackets For Flushing Cistern Mg,Add Hom Of Welding And Grinding Machine At 2Percentage On Material Mg,Add Brush, Putty, Sand Paper, Roller At 5Percentage On Cost Of Paint Mg,Add 15Percentage Wastage For Glass Mg,Unit Cost As Per The Specification Mg,Fabricator Mg,Mathi Pernandi Wood Scantling Mg,High Bond Tile Adhesive For Vitrified Tiles Mg,Cleat Angles Mg,Chrominum Plated Screws Mg,Alluminium Handles 15 Mm Mg,Adhesive For Joints Mg,Formwork, Centering And Scaffolding For Plastering And Painting Of Ceiling - 25Percentage Mg,Formwork, Centering And Scaffolding For Plastering And Painting Of New Walls - 25Percentage Mg,White Cement Based Putty At 2Sqm Per Kg At Rs. 1050 Per Kgs Mg,Plastic Emulsion Paint Mg,Enamel Paint Mg,Pvc Pipe Of 10Kgorcum,90 Mm Mg,Labour Charges For Handing Errection Of Rcc Rings Etc. At 5Percentage Mg,Transportation Charges Of Materials Beyond 5 Km At 10Percentage Mg,Fabrication Charges.Mg,Cost Of 6.5Mm M.S. Coil Mg,White Vitreous China Clay Flat Back Wash Basin Size 550.400Mm Mg,Special For Overflow Pipe Mg,Mosquito Proof Coupling 25Mm Mg,Copper Plated Brass Piller Tap 15Mm Mg,Licenced Plumber With Tools Mg,Aqua Nylon Mesh Mg,Charcoal Mg,Rcc Cap 1000 Mm Dia, 100 Mm Thick Mg,Add Mg,Lead Or Pvc Connection Pipe 32Mm Dia For Wash Basin Mg,Cp Brass Waste 32 Mm Of Standard Pattern Mg,Cp Brass Chain With Plug Mg,Brass Stop Cock Mg,Handling Loading And Unloading 3Percentage On Material Mg,Labour Charges For Lifting And Placing In Position And Making Connection At 7Percentage On Material Mg,Polyenthylene Water Storage Tank Of Specified Capacity L Mg,White Glazed Perviterous China Clay 10Lts Low Lwvwl Flushingcistern, With Fittings And Brackets And 40 Mm White C.P. Flush Pipe Mg,Black Plastic Seat With Lid As Specified Mg,European Type Water Classet Of Specific Make Mg,Bolts And Nuts In Kg,Nrega Add White Lead Paint, Gasket, Cement, Sand For Making Good The Wall And Floor At 2Percentage On Material Mg,Add White Cement For Pointing At 2 Percentage On Material,Mason Class 2 With Tools,White Cement Per Quintal,Solid Concrete Blocks 40X20x20 Cms 4.0 Nper Sqm,Silver Oak Or Equivalent Plank 38Mm Thick,Jungle Wood Runners And Planks 9487,Ceramic Tiles Of Size 30X30 Cum,Casurina Poles 75 To 150Mm,Nrega Add Sundries Charges At 2 Percentage On Material,Plasticizeror Suoer Platicizer,Glazed Tiles 300X450 Per Sqm,Border Tiles 30X10 Cms Per Nos,Mg 100Mm S Or P Trap Mg,Mg Add Sundries Charges At 2 Percentage On Material,Mg C.I. Per M.S. Brackets For Flushing Cistern Mg,Mg Nylon Rollers,Mg 5.50 Mm Thick Plain Glass Mg,Display Board Mg,Eletrification Mg