}

Supply Of Comuterised Numeracally Controlled (Cnc) Gantry Beam Drilling & Milling Machine On Turnkey Basis With Camc.Comuterised Numeracally Controlled (Cnc) Gantry Beam Drilling & Milling Machine On Turnkey Basis With Camc.,Design, Manufacturing And, manmad-Maharashtra

Government Departments has published Supply Of Comuterised Numeracally Controlled (Cnc) Gantry Beam Drilling & Milling Machine On Turnkey Basis With Camc.Comuterised Numeracally Controlled (Cnc) Gantry Beam Drilling & Milling Machine On Turnkey Basis With Camc.,Design, Manufacturing And. Submission Date for this Tender is 09-09-2024. Raw Materials Processing Machinery Tenders in manmad Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

44606236
Supply Of Comuterised Numeracally Controlled (Cnc) Gantry Beam Drilling & Milling Machine On Turnkey Basis With Camc.Comuterised Numeracally Controlled (Cnc) Gantry Beam Drilling & Milling Machine On Turnkey Basis With Camc.,Design, Manufacturing And
Open Tender
Indian
Maharashtra
Manmad
09-09-2024

Tender Details

Supply Of Comuterised Numeracally Controlled (Cnc) Gantry Beam Drilling & Milling Machine On Turnkey Basis With Camc.Comuterised Numeracally Controlled (Cnc) Gantry Beam Drilling & Milling Machine On Turnkey Basis With Camc.,Design, Manufacturing And Supply Of Computerised Numerically Controlled (Cnc) Gantry Beam D Rilling & Milling Machine 3 Spindle For 2.6 M Web X 1.0 M Flange X 15.0 M Length Along-With All Concomitant Acces Sories Duly Conforming To Technical Specification No. Cr/Ir/Cnc-Gbdmm /With Works/2024, Important Feat Ures Of Tender And Formats Drawings I.E. Section Iv,V & Vi Enclosed. [ Warranty Period: 24 Months After The D Ate Of Delivery ] ] , Camc For 5 Years After Expiry Of Comprehensive Warranty Period Of 02 Years For The Cnc Gantry Beam Drilling & Milling Machine I.E. Item # 01 [ Warranty Period: 2 Years, Amc Period: 5 Years, Rate Of Disco Unting: 10 % ] ] Sr.S.E.[Mill Wright] Manmad, Maharashtra 1.00 Numbers At (Location) Cr 3 6528N02 Essential Non Stock --- Yes Consignee Inr Services (Y) Construction Of Foundation, Installation, Testing, Commissioning And Proving- Out On Turnkey Basi S For The Cnc Gantry Beam Drilling & Milling Machine I.E. Item # 01. ] Sr.S.E.[Mill Wright] Manmad, Maharashtra 1.00 Numbers At (Location) Cr 3. T And C F.O.R Description Destination Delivery Period Description Delivery /Completion Rate Of Supply For All Items Completion : Within 17 Months Delivery Including Construction Of Foundation, Installation, Commissioning And Proving Out To Be Completed Within 17 Months As Per Section -Iv, Clause 7.0 Payment Terms S.No Description Payment Terms 1 As Per Section-Iv, Clause Nos. 8.1 & 8.2 Statutory Variation Clause S.No Description 1 Statutory Variation Clause (Svc) Is Applicable As Per Clause 9.1 Of Section Ii Of Central Railway Bid Document (Updated) August 2022. Option Clause S.No Description 1 Not Applicable Railway Standard Fall Clause S.No Description 1 Not Applicable Page 2 Of 9 Run Date/Time: 06/08/2024 14:40:22Stores/Central Rly , Construction Of Foundation, Installation, Testing, Commissioning And Proving- Out On Turnkey Basi S For The Cnc Gantry Beam Drilling & Milling Machine I.E. Item # 01. ] Sr.S.E.[Mill Wright] Manmad, Maharashtra 1.00 Numbers At (Location) Cr

Key Value

Document Fees
Refer document
EMD
INR 2000000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail