Supply Of Materials For Construction Of Sanjeevini Nrlm Shed Near V.P.C. No 2831/1 In Hirekodi Village At Chikkodi Taluk - Lumpsum Material,Plate Vibrator Having 3 Ton Compaction Force,,Cobble Stones Of 75Mm Thick,,Add Brush, Putty, Sand Paper At 2% On Cost Of Paint.,.,Water Proofing Cement Paint-01,Plastic Emulsion Paint-02,Add Brush, Putty At 5% On Cost Of Distemper Primer.,.01,Distemper Primer.,,Add Brush, Putty, Sand Paper, Roller At 5% On Cost Of Paint-02,White Cement Based Putty 2Sqm / Kg At Rs. 1050 Per Kgs-02,Vitrified Tiles 600X600 Mm-02,Unit Cost As Per The Specification,,Hom Of Machinaries For Planing,.,Add Cutting And Other Wastage 5%,,Mathi/Nandi Wood Planks For Panels 25 Mm Thick,,Add Hom Of Welding And Grinding Machine At 2% On Material,Mason Class I (With Tools).,.,,Fabricator-01,Add 15% Wastage For Glass-02,A 5.50 Mm Thick Plain Glass,Chrominum Plated Screws-02,Cleat Angles-02,Alluminium Handles - 15 Mm-02,Alluminium Tower Bolt - 20 Cm-02,Pvc Beading 03,Rubber Beading For Shutters Beading.,,Nylon Rollers.,.,Aluminium Window Frame Section 1.20 Mm Thick,,Add Brush At 1% On Cost Of Paint.,.,Enamel Metal Paint.,,Painter Class I.,,Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3% On Cost Of Paint.,Ready Mix Primer Paint (Ready Mix Red Lead Paint).,,Add Hom Of Welding And Grinding Machine At 4% On Materi,Welder Grade I,,Fitter Class I,,Ms Flat,.,M.S Rods,,Add Providing And Removing Scaffolding At 3% On Labour-01,Add Handling Loading And Unloading At 1% On Material.,,Burnt Bricks Class 35 (Non Modular).,,Add For Scaffolding 5 Per Cent Of Cost Of Labour And Material,Laboratory Asst. (Sslc Passed)/Mate/Supervisor,,Mixer (Concrete Small Used In Culvert.),Bond Stone 20 X 20 X 45 Cm.,,Stone At Quarry-1,Add Sundries Charges At, 2 % On Material,Casurina Poles 100 - 150 Mm.,,Add Handling Loading And Unloading At 2% On Material.,,Casurina Poles 75 - 100 Mm Dia.,Jungle Wood Runners And Plank.,,Silver Oak, Or Equivalent Planks 38 Mm Thick.,,Binding Wire,.,Tmt Bars Fe 500,.,Water.,.,Burnt Lime/Shell Lime.,Compensation For Earth Taken, From Private Land -02,Hom Of Vibrator 0.71 Days.,,Plasticizer / Super Plasticizer.,.,Mixer (Concrete) - 1 Cum Capacity.,,Portland Cement,.,Broken Stone Aggregate 12 Mm To 10 Mm Size,,Broken Stone Aggregate 20 Mm Size,,Broken Stone Aggregate 40 Mm Size,,Add Watering Charges At 1 % On Material.,,Add Sundries Charges At, 1 % On Material.,Coarse Sand (Zone Iii),,Granite / Trap Broken Metal 100 Mm And Down Size.,