Tender For 2000143668:M6hatchopen&Close-Furnaceemptyout&Shutdown 2000143668 20 10 20 HATCH OPEN&CLOSE WITH HOT TIGHTENING 8,512 IND 10 HATCHES OPENING AND CLOSING 2,040 IND Email : Yash.Vala@amns.in Contact : Name : Yash Vala Item Details : M6hatchOpen&Close-FurnaceEmptyOut-FY2024FY2024 Scope of work for Mod-6 hatch opening & closing during furnace empty out in FY2024. List of hatches with size. Furnace area hatch opening & closing with hot tightening : 1.,,USG, 16 Inch – 2 No (32 IND), 4 Inch – 2 No (8 IND), 20 Inch – 1 No (20 IND) 2.,,Proportionating hopper, 20 Inch – 2 No (40 IND), 24 Inch – 1 No ( 24 IND) 3.,,Octopus outer legs pocking flange, 4 Inch – 16 No (64 IND) 4.,,61m hatch, 48 Inch – 2 No (96 IND) 5.,,Top gas duct hatch, 32 Inch – 1 No (32 IND) 6.,,Bustle entry hatch, 40 Inch – 1 No (40 IND) 7.,,Bustle gas duct vertical hatch, 40 Inch – 3 No ( 120 IND) 8.,,MBF hatch, 28 Inch – 1 No (28 IND) 9.,,UBF hatch, 28 Inch – 1 No (28 IND) 10.,,Top gas scrubber lower cone, 28 Inch – 2 No (56 IND) 11.,,Cooling gas scrubber lower cone, 28 Inch – 2 No (56 IND) 12.,,All dust collection line hatches, 20 Inch – 10 No (200 IND), 8 Inch – 3 No (24 IND) 13.,,Lower slide gate, 16 Inch – 4 No (64 IND) 14.,,Cooling gas entry, 24 Inch – 1 No (24 IND), 16 Inch – 2 No (32 IND) 15.,,1115,1116,6155,1101 venturi strainer, 20 Inch – 4 No (80 IND), 6 Inch – 4 No (24 IND) 16.,,LBF hatch, 20 Inch – 1 No (20 IND), 16 Inch – 1 No (16 IND) 17.,,LSL pipe pocking flange, 16 Inch – 1 No (16 IND), 12 Inch – 1 No (12 IND), 6 Inch – 6 No (36 IND) 18.,,CG venturi top hatch, 24 Inch – 1 No (24 IND) 19.,,Top gas scrubber all manholes, 24 Inc – 10 No (240 IND) 20.,,Cooling gas scrubber all manholes, 24 Inch – 6 No (144 IND) Ground floor area: 1.,,Reformer main door, 60 Inch – 2 No (120 IND) 2.,,Feed gas header, 40 Inch – 6 No (240 IND) 3.,,Feed gas common header, 40 Inch – 2 No (80 IND) 4.,,Mixing ring Y Piece, 40 Inch – 1 No (40 IND) 5.,,RG header individual hatch, 40 Inch – 3 No (120 IND) 6.,,Hot air common header, 44 Inch – 3 No (132 IND) 7.,,Bustle gas duct at PG roof, 40 Inch – 2 No (80 IND) 8.,,Recuperator hatches, 16 Inch – 28 No (448 IND) 9.,,TGF chiller mist eliminator hatch, 24 Inch – 1 No (24 IND) 10.,,PG mist eliminator hatch, 24 Inch – 3 No (72 IND) 11.,,All PGC silencer hatch, 24 Inch – 16 No ( 384 IND) 12.,,Hot air all 07 headers, 48 Inch – 7 No (336 IND) 13.,,VPSA both cooler hatch, 32 Inch – 6 No (192 IND) 14.,,TGF chiller hatch (1500 x 500 x 02) 40 Inch – 2 No (80 IND) 15.,,Seal gas cooler , 24 Inch – 1 No (24 IND), 36 Inch – 1 No (36 IND) 16.,,Top gas fuel common header hatch, 24 Inch – 2 No (48 IND) 17.,,Feed gas 1st stage common header hatch, 24 Inch – 2 No (48 IND) 18.,,VPSA both cooler mist eliminator hatch, 24 Inch – 2 No (48 IND) 19.,,SGC and BSG knock out drum hatches, 32 Inch – 2 No (64 IND), 16 Page 2 of 5 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000117541 Date 26.07.2024 Submission Date 03.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Sarjan Mahida Contact Email SARJAN.MAHIDA@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details Inch – 1 No (16 IND) 20.,,Cold PG mist eliminator hatch, 24 Inch – 1 No (24 IND) Utility, Junction house 23 & VPSA area 1.,,VPSA both cooler mist eliminator hatch, 24 Inch – 2 No (48 IND) 2.,,SGC and BSG knock out drum hatches,32 Inch – 2 No (64 IND), 16 Inch – 1 No (16 IND) 3.,,Cold PG mist eliminator hatch, 24 Inch – 1 No (24 IND) 4.,,All LR/KR/MR sump manhole hatch, 40 Inch – 12 No ( 480 IND) 5.,,VPSA main dampener, 44 Inch – 3 No (132 IND) 6.,,152 pump suction pit manhole, 40 Inch – 1 No (40 IND) 7.,,Dc venturi scrubber square hatch (900mm X 900mm), 36 Inch – 2 No (72 IND) 8.,,HRT 33 sump manhole hatch, 24 Inch – 1 No (24 IND) 9.,,Dry cyclone square hatch (1000mm X 900mm), 30 Inch – 4 No (120 IND) For 1 time hatch opening & closing : 1020 IND For 1 time hatch opening & closing with hot tightening : 4256 IND Total hatch opening & closing : 1020 X 2 = 2040 IND Total hatch opening & closing with hot tightening : 4256 X 2 = 8512 IND Contractor scope : 1. Get the work permit from area site in charge/the control room, get the sign of field controller. Hot work permit and work at height permit to be taken as per job requirement. 2. Job to be started after proper toolbox talk given to all contractor associates. additional work at height permit to be taken where required. Safety talk / HIRAC to be carried out for the jobs to all manpower. 3. SMP and HIRAC no must be mentioned in permit. 4. Before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. Fire blankets in contractor scope. 5. All safety precautions must be followed by the contractor and its technicians. must wear safety belt while performing job. Use safety belt and lifeline. Work area to be barricaded. As per job, technician must have rigger pass, work at height pass, crane operator pass, welder pass. 6. 12mm SS wire rope to be used in lifeline, rope to be clamping through clamp. 7. Safety belt to be hooked up with permanent structure, if required hook to be fabricated and welded. 8. EOT Crane operation for material shifting must be done by the contract supervisor. (No technicians are allowed to operate the crane) 9. All safety rules and precaution of AM/NS should be followed by the contractor and his team. All safety items like safety shoes, safety helmets, safety belts, hand gloves etc. Are to be arranged by the contractor. 17. If ready-to-use gaskets are not available, the contractor has to cut the same as per required size from suitable sheets. 18. The all flange joints to be leak proof. Any hot tightening required then same to be carried out as per the instruction of AMNS engineer. 20. Shifting of all materials required for the job to be shift from Work shop or Main store to work area. 21. Necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set & welding machines, welding rods for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) Any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. 22. All consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. Will be in contractors scope. 23. Any cutting / welding required will be in contractors scope. Contractor should ensure the quality of welding. All welding to be done by qualified welders approved by AM/NS. All welding joints is to be DP tested. DP test consumables are in contractor scope. 24. Housekeeping should be carried out after completion job. All used / Page 3 of 5 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000117541 Date 26.07.2024 Submission Date 03.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Sarjan Mahida Contact Email SARJAN.MAHIDA@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in-charge. 25. After shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 26. All scrap to be cut into 1m length and scrap material to be loaded & shifted at specified location as per AM/NS engineer. 4.5 27. Contractor must deploy continue round the clock skilled manpower for the Job. Safety supervisor must be available on site, round o’clock. Contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 28. As per Management Directive, transport/movement of associates To & From for Plant should by mandatorily in 4 Wheelers and Buses. Bicycles and Two wheelers are strictly not allowed. AM/NS Scope : 1. All permanent material & Special electrodes to be provide if required. 3. Drinking water, Power supply, lighting facilities, Working Platform, etc. for workmen at plant site 4. Job certification for executed jobs. 5. Electrical Certification will be done by AM/NS Electrical Engineer. 6. Free supply of air, water and electricity will be provided at single point. Adequate lighting will also be provided. 7. Co-ordination for work permit. Specific penalty for non-performance by contractor and must be cardinally measured. 1. Non-conformity of Work. 2. Penalty will be imposed in case of noncompliance to HSE norms. 3. Time is essence of the contract and total job shall have to be finished within time allotted. Penalty shall be imposed in case of any delay in completing the job. M/s ArcelorMittal Nippon Steel India Ltd. Item Note : 2 2000143668 40 20 10 HATCH OPEN&CLOSE WITH HOT TIGHTENING 3,108 IND Email : Yash.Vala@amns.in Contact : Name : Yash Vala Item Details : M6hatchOpen&Close-ShortShutDown-FY2024 2024 Scope of work for Mod#6 various area hatch opening & closing during monthly short shut down FY2024. List of hatches with size. 1.,,JH23 area dust collection line square hatch 500X700mm, 6 No – 168 IND 2.,,Dust collection line square hatch 500X700mm, 10 No – 280 IND 3.,,JH23 dust collection line, 10 Inch – 10 Nos (100 IND) 4.,,152 pump suction pit manholes hatch, 36 Inch – 1 No (36 IND) 5.,,USG & LSG square hatch 500X700mm, 8 No – 224 IND 6.,,Seal gas cooler, 24 Inch – 1 No (24 IND), spare hatch 1500X500mm, 1 No – 60 IND 7.,,Top gas flue chiller square hatches, 1500X500mm, 2 No – 120 IND 8.,,TGF chiller mist eliminator, 24 Inch – 1 No (24 IND) For 1 time hatch opening & closing = 1036 IND Total IND = 1036 X 3 = 3108 Contractor scope : 1. Get the work permit from area site in charge/the control room, get the sign of field controller. Hot work permit and work at height permit to be taken as per job requirement. 2. Job to be started after proper toolbox talk given to all contractor associates. additional work at height permit to be taken where required. Page 4 of 5 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000117541 Date 26.07.2024 Submission Date 03.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Sarjan Mahida Contact Email SARJAN.MAHIDA@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details Safety talk / HIRAC to be carried out for the jobs to all manpower. 3. SMP and HIRAC no must be mentioned in permit. 4. Before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. Fire blankets in contractor scope. 5. All safety precautions must be followed by the contractor and its technicians. must wear safety belt while performing job. Use safety belt and lifeline. Work area to be barricaded. As per job, technician must have rigger pass, work at height pass, crane operator pass, welder pass. 6. 12mm SS wire rope to be used in lifeline, rope to be clamping through clamp. 7. Safety belt to be hooked up with permanent structure, if required hook to be fabricated and welded. 8. Crane operation for material shifting must be done by the contract supervisor. (No technicians are allowed to operate the crane) 9. All safety rules and precaution of AM/NS should be followed by the contractor and his team. All safety items like safety shoes, safety helmets, safety belts, hand gloves etc. Are to be arranged by the contractor. 17. If ready-to-use gaskets are not available, the contractor has to cut the same as per required size from suitable sheets. 18. The all flange joints to be leak proof. Any hot tightening required then same to be carried out as per the instruction of AMNS engineer. 20. Shifting of all materials required for the job to be shift from Work shop or Main store to work area. 21. Necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set & welding machines, welding rods for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) Any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. 22. All consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. Will be in contractors scope. 23. Any cutting / welding required will be in contractors scope. Contractor should ensure the quality of welding. All welding to be done by qualified welders approved by AM/NS. All welding joints is to be DP tested. DP test consumables are in contractor scope. 24. Housekeeping should be carried out after completion job. All used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in-charge. 25. After shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 26. All scrap to be cut into 1m length and scrap material to be loaded & shifted at specified location as per AM/NS engineer. 4.5 27. Contractor must deploy continue round the clock skilled manpower for the Job. Safety supervisor must be available on site, round o’clock. Contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 28. As per Management Directive, transport/movement of associates To & From for Plant should by mandatorily in 4 Wheelers and Buses. Bicycles and Two wheelers are strictly not allowed. AM/NS Scope : 1. All permanent material & Special electrodes to be provide if required. 3. Drinking water, Power supply, lighting facilities, Working Platform, etc. for workmen at plant site 4. Job certification for executed jobs. 5. Electrical Certification will be done by AM/NS Electrical Engineer. 6. Free supply of air, water and electricity will be provided at single point. Adequate lighting will also be provided. 7. Co-ordination for work permit. Specific penalty for non-performance by contractor and must be cardinally measured. Page 5 of 5 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000117541 Date 26.07.2024 Submission Date 03.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Sarjan Mahida Contact Email SARJAN.MAHIDA@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details 1. Non-conformity of Work. 2. Penalty will be imposed in case of noncompliance to HSE norms. 3. Time is essence of the contract and total job shall have to be finished within time allotted. Penalty shall be imposed in case of any delay in completing the job. M/s ArcelorMittal Nippon Steel India Ltd.