|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bush, shrubs, saplings and trees of girth upto 300mm, removal of stumps, disposal of unserviceable material and stacking of serviceable material upto 1000 m from road boundry as per MoRTH Specification : 201, By Mechanical Means, In area of light jungle |
| 2 | Baroni (NH-12 Ch. 84/200) Shiwad Adalwara Sawai Madhopur Kudera Bhoori Pahari Hadoti Sapotra Kudgoan (NH-11b Ch. 60/0) Km. 0/0 to 158/0 (15.00 Km. Kurgaon) |
| 3 | A/R to Kheda |
| 4 | Approach road Rundi to Rampur Palan |
| 5 | M/L Dabra to khirkhira |
| 6 | Tontpura to Golabpura |
| 7 | A/R to Narauli |
| 8 | A/RKudgoan Sapotra road to Hanjapur |
| 9 | A/R to Gokalpur |
| 10 | A/R to Taroli |
| 11 | M/L Taroli to Kota |
| 12 | Kota to Nadir Kua |
| 13 | Khori from Karauli Kailadevi road |
| 14 | A/R to Manch |
| 15 | A/R to Mali Basti |
| 16 | A/R to Rajor Bag |
| 17 | A/R to Nai Basti |
| 18 | A/R to Arab Ka Pura |
| 19 | A/R to Kachipura |
| 20 | Dabra Bus Stand to Bherodham Temple |
| 21 | Restoration of rain cuts with soil, morrum, gravel or a mixtrue of these including all leads and lifts and cost of arrangement of land, cleaning the loose soil, benching for 300mm width, laying fresh material in layers not exceeding 250mm and compacting with plate compactor or power rammer to restore the original alignment levels and slopes complete as per MoRTH specification clause 3002. |
| 22 | Baroni (NH-12 Ch. 84/200) Shiwad Adalwara Sawai Madhopur Kudera Bhoori Pahari Hadoti Sapotra Kudgoan (NH-11b Ch. 60/0) Km. 0/0 to 158/0 (15.00 Km. Kurgaon) |
| 23 | A/R to Kheda |
| 24 | Approach road Rundi to Rampur Palan |
| 25 | M/L Dabra to khirkhira |
| 26 | Tontpura to Golabpura |
| 27 | A/R to Narauli |
| 28 | A/RKudgoan Sapotra road to Hanjapur |
| 29 | A/R to Gokalpur |
| 30 | A/R to Taroli |
| 31 | M/L Tarli to Kota |
| 32 | Kota to Nadir Kua |
| 33 | Khori from Karauli Kailadevi road |
| 34 | A/R to Manch |
| 35 | A/R to Mali Basti |
| 36 | A/R to Rajor Bag |
| 37 | A/R to Nai Basti |
| 38 | A/R to Arab Ka Pura |
| 39 | A/R to Kachipura |
| 40 | Dabra Bus Stand to Bherodham Temple |
| 41 | Maintenane of WBM Road including flling up of poteholes, ruts and rectifying corrugated surface, damaged edges and ravelling as per technical Specifiction Clause:1906 |
| 42 | Baroni (NH-12 Ch. 84/200) Shiwad Adalwara Sawai Madhopur Kudera Bhoori Pahari Hadoti Sapotra Kudgoan (NH-11b Ch. 60/0) Km. 0/0 to 158/0 (15.00 Km. Kurgaon) |
| 43 | A/R to Kheda |
| 44 | Approach road Rundi to Rampur Palan |
| 45 | M/L Dabra to khirkhira |
| 46 | Tontpura to Golabpura |
| 47 | A/R to Narauli |
| 48 | A/RKudgoan Sapotra road to Hanjapur |
| 49 | A/R to Gokalpur |
| 50 | A/R to Taroli |
| 51 | M/L Tarli to Kota |
| 52 | Kota to Nadir Kua |
| 53 | Khori from Karauli Kailadevi road |
| 54 | A/R to Manch |
| 55 | A/R to Mali Basti |
| 56 | A/R to Rajor Bag |
| 57 | A/R to Nai Basti |
| 58 | A/R to Arab Ka Pura |
| 59 | A/R to Kachipura |
| 60 | Dabra Bus Stand to Bherodham Temple |
| 61 | Providing & laying 13mm thick premix patching with 0.18 cum of stone chipping ( 0.12 cum of 11.2 mm size and 0.06 cum of 6.70 mm size ) mixed with 10.1 kg of straight run bitumen VG-10 per 10 sqm of road surface including heating of binder and aggregate,cleaning the area of patch cut to regular shape with vertical sides, removing all loose & disintegrated material, providing & application of tack coat @ 2.25 kg per 10 sqm., laying of patching material and compacting with 8-10 tonne power road roller including costof bitumen, aggregate, fuel, lubrication, binder, hire charges of machinery, T&P etc. |
| 62 | Baroni (NH-12 Ch. 84/200) Shiwad Adalwara Sawai Madhopur Kudera Bhoori Pahari Hadoti Sapotra Kudgoan (NH-11b Ch. 60/0) Km. 0/0 to 158/0 (15.00 Km. Kurgaon) |
| 63 | A/R to Kheda |
| 64 | Approach road Rundi to Rampur Palan |
| 65 | M/L Dabra to khirkhira |
| 66 | Tontpura to Golabpura |
| 67 | A/R to Narauli |
| 68 | A/RKudgoan Sapotra road to Hanjapur |
| 69 | A/R to Gokalpur |
| 70 | A/R to Taroli |
| 71 | M/L Tarli to Kota |
| 72 | Kota to Nadir Kua |
| 73 | Khori from Karauli Kailadevi road |
| 74 | A/R to Manch |
| 75 | A/R to Mali Basti |
| 76 | A/R to Rajor Bag |
| 77 | A/R to Nai Basti |
| 78 | A/R to Arab Ka Pura |
| 79 | A/R to Kachipura |
| 80 | Dabra Bus Stand to Bherodham Temple |
| 81 | Earth work in excavation for foundation of structurecompletewith all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305.In ordinary soil. Depth upto 3 metre |
| 82 | Providing and laying mechanically mixed and vibrated Cement Concrete in foundation upto a depth of 1.5 metres below ground level and 1.50 metres above Ground/Bed level as per MoRTH Specification : Clause 1000 & 1700. P.C.C. 1:3:6 mix with crushed stone aggregate 20 mm nominal size. |
| 83 | Providing and laying stone masonry work in cement mortar with mechanical mixer for foundation (any level) complete including all scaffolding etc. but excluding pointing and plastering as per drawing and technical specification as per MoRTH Specification : Section 1000,1400. Random rubble masonry, in cement mortar 1:4 |
| 84 | Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and MoRTH specification Clauses 1313, 1411 and 2206.6. 75 mm thick |