}

Tender For Competitive E-Bidding For Supply Of Boiler Fabrication And Erection Work Services For Season 2024-25, Competative E-Bidding For Supply Of Boiler Fabrication And Erection Work Services For Season 2024-25 Supply Of Boiler Fabrication And Erection, mahmudabad-Uttar Pradesh

Cooperative has published Tender For Competitive E-Bidding For Supply Of Boiler Fabrication And Erection Work Services For Season 2024-25, Competative E-Bidding For Supply Of Boiler Fabrication And Erection Work Services For Season 2024-25 Supply Of Boiler Fabrication And Erection. Submission Date for this Tender is 02-08-2024. Bolts Tenders in mahmudabad Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

44435595
Tender For Competitive E-Bidding For Supply Of Boiler Fabrication And Erection Work Services For Season 2024-25, Competative E-Bidding For Supply Of Boiler Fabrication And Erection Work Services For Season 2024-25 Supply Of Boiler Fabrication And Erection
Open Tender
Indian
Uttar Pradesh
Mahmudabad
02-08-2024

Tender Details

Tender For Competitive E-Bidding For Supply Of Boiler Fabrication And Erection Work Services For Season 2024-25, Competative E-Bidding For Supply Of Boiler Fabrication And Erection Work Services For Season 2024-25 Supply Of Boiler Fabrication And Erection Work Services For Season 2024-25, 1 For 20 Ton Walchand Nagar make Boilers 2 Drum to Drum tube size 63.5mm O.D. & sucessfuly hydroulic testing at 32 Kg/Cm² Dismentaling of old tubes, Fabrication of new tube as per drg./sample 3 Side Wall tube size 70mm O.D (Row no 18 to 25)Dismentaling of old tubes Fabrication of new tube as per drg./sample & sucessfuly hydroulic testing at 32 Kg/Cm² 4 Relief Tube size 76.2mm O.D.Dismentaling of old tubes Fabrication of new tube as per drg./sample & sucessfuly hydroulic testing at 32 Kg/Cm² 5 Roof tube size 76.2 mm O.D.Dismentaling of old tubes ii) Fabrication of new tube as per drg./sample & sucessfuly hydroulic testing at 32 Kg/Cm² 6 Screen Tube size 70mm O.D. (Row no 16-17) Dismentaling of old tubesFabrication of new tube as per drg./sample & sucessfuly hydroulic testing at 32 Kg/Cm² 7 Super Heater coil tube size 44.45 mm O.D. Dismentaling of old tubes Fabrication of new tube as per drg./sample & sucessfuly hydroulic testing at 32 Kg/Cm² 8 Dismentaling, Fabrication and erection of Nipple 9 Economiser 24 tube of 4 od size Dismantling of old tube and bends. Fabrication of new tubes as per drawing / sample. Frabrication of new tubes successfully hydrolic testing at 32 Kg/cm² (material of coils on tube i.e. 3mm plate to be supplied by party) 10 Economiser 24 tube of 4 od size Dismantling of old tube and bends. Fabrication of new tubes as per drawing / sample. Frabrication of new tubes successfully hydrolic testing at 32 Kg/cm² (material of coils on tube i.e. 3mm plate to be supplied by factory) 11 Drum to front header Rooftube 70mm O.D. 12 Dismentaling of old Air heater tubes of boiler No. 1 & 2 and fitting the old Boiler tubes as per sample of A.H.T. (63.5 mm O.D.) 13 For 30 Ton Taxmaco make Boilers 14 Drum to Drum tube size 63.5mm O.D. (Row No 6-13) Dismentaling of old tubes Fabrication of new tube as per drg./sample Errection & sucessfuly hydroulic testing at 32 15 Side Wall tube size 76.2mm O.D Dismentaling of old tubes Fabrication of new tube as per drg./sample Errection& sucessfuly hydroulic testing at 40 Kg/Cm² 16 Roof tube size 76.2mm O.D. Fabrication of new tube as per drg./sample Errection & sucessfuly hydroulic testing at 40 Kg/Cm² 17 Steam Relief Tube size 76.2mm O.D. Dismentaling of old tubes Fabrication of new tube as per drg./sample Errection & sucessfuly hydroulic testing at 40 Kg/Cm² 18 Steam Circulation tube from Drum to super water header 76.2mm Dismentaling Fabrication of tubes Fitting of tubes & trial 19 Down tube pipes Drum to side header (6 Nos) Dismentaling of old tubes Fabrication of new tube as per sample with flange Fitting & hydroulic testing 20 Super heater coils tube size 44.45mm O.D. Dismentaling of coils Fabrication of new coilas per drg./sample Errection along with luga/clamps & hydroulic testing at 40 Kg/Cm² 21 Super heater coils tube size 76.2 mm O.D. Dismentaling of coils Fabrication of new coilas per drg./sample Errection along with luga/clamps & hydroulic testing at 40 Kg/Cm² 22 Texmaco make 30 Ton Boiler 23 DismentalingFabrication with welding of MS Flats size 50 mm X 4mm thick (Flats would be supplied by the party) then erection of Economizer coils (26 Nos) size 44.45mm od X 4.06 mm thick (supplied by factory) with hydraulic testing at 36 kg/cm² pressure at our 30 Ton capacity Texmaco boiler. Side plates and cover of economizer chamber will also by fitted by the contractor 24 DismentalingFabrication & Erection of Economizer coils (26 Nos) size 44.45mm od X 4.06 mm thick (supplied by factory) with hydraulic testing at 36 kg/cm² pressure at our 30 Ton capacity Texmaco boiler. Side plates and cover of economizer chamber will also by fitted by the contractor 25 Machining of cap seat Eliptical 26 Machining of cap seat Round 27 Machining of header seat at site Eliptical 28 Machining of header seat at site Round 29 Re-threading of cap bolt if required 30 Dismentalling, fabrication & errection of Nipple of any size 31 Dismentalling of old & weak air heater tubes of boiler no 3 and fitting new tubes 32 Drum to Drum, Bank tubes 63.5mm O.D. (tube no 14 to 17) Dismentaling of old tubes Bends replacement of old tubes by new tube.Errection & successfully hydroulic testing at 32 Kg/Cm² 33 Dismentaling of old Air heater tubes of boiler No. 3 and fitting the old Boiler tubes as per sample of A.H.T. (63.5 mm O.D.) Supporting plate to be dismantled at the time of dismantaling the tube and the plates to be fitted by the contractor / fabricator on fitment of new tube. (The new supporting plate of Air Heater to be supplied by Factory) 34 Dismentaling of old Air heater tubes of boiler No. 3 and fitting the old Boiler tubes as per sample of A.H.T. (63.5 mm O.D.) Supporting plate to be dismantled at the time of dismantaling the tube and the plates to be fitted by the contractor / fabricator on fitment of new tube. (The new supporting plate of Air Heater to be supplied by Contractor / Fabricator)

Key Value

Document Fees
INR 590 /-
EMD
INR 10000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail