Construction Of Rural Hot At Hagaranur Village-1505002015/Av/Gis/1098475 Exclusive Of Taxes - Hrh98475rubble Stones,Hrh98475red Oxide,Hrh98475add Handling , Loading And Unloading At 1Percenton Material,Hrh98475add Brush, Putty, Glue At 5Percenton Cost Of Paint,Hrh98475whitening,Hrh98475dry Distemper,Hrh98475add 3Percentfor Form Work On The Above,Hrh98475air Compressor,Hrh98475water Tanker,Hrh98475concrete Joint Cutting Machine,Hrh98475plate Vibrator Having 3 Ton Compaction Force,Hrh98475hom Of Screed Vibrator,Hrh98475vibrator With Needle,Hrh98475laboratory Asst. (Sslc Passed)/Mate/Supervisor,Hrh98475add Cost Of Water For Curing At 1.50 %,Hrh98475super Plasticizer Admixture Is Marked As Per 9-103-1999,Hrh98475jute Rope,Hrh98475joint Sealant,Hrh98475sealant Primer,Hrh98475pre-Moulded Joint Filler, 25Mm Thick For Expansion Joint,Hrh98475separation Membrane Of Impermeable Plastic Sheeting 125 Micron Thick,Hrh98475coarse Aggregates 25 Mm,Hrh98475unit Cost As Per The Specification,Hrh98475tools And Plants And Electrical Charges At2%,Hrh98475add Brush At 1Percenton Cost Of Paint,Hrh98475enamel Metal Paint,Hrh98475add Providing And Removing Scaffolding At 3Percenton Labour,Hrh98475painter Class I,Hrh98475add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3Percenton Cost Of Paint,Hrh98475ready Mix Primer Paint (Ready Mix Red Lead Paint),Hrh98475hom Of Cutting And Grinding Machine,Hrh98475hom Of Welding And Grinding Machine,Hrh98475welder Grade I,Hrh98475corbon Electrodes,Hrh98475anchor Bolts 750Mm,Hrh98475base Plate / Base Plate,Hrh98475gusset Plates 6 Mm Thick,Hrh98475 Ms Angle Iron 40Mm X 40Mm X 6Mm, 23 Mtr In Length At 3.5 Kg Per Mtr,Hrh98475ms Angle Iron 50Mm X 50Mm X 6Mm, 33.8 Mtr In Length At 4.5 Kg Per Mtr,Hrh98475broken Granite Metal 10 Mm,Hrh98475broken Granite Metal 12.5 Mm,Hrh98475binding Wire,Hrh98475tmt Bars Fe 500,Hrh98475add Watering Charges At 1 Percenton Labour,Hrh98475add Sundries Charges At 1 Percenton Labour,Hrh98475stone Chistler Class Ii,Hrh98475mason Class Ii (With Tools),Hrh98475mason Class I (With Tools),Hrh98475mixer (Concrete Small Used In Culvert),Hrh98475boulders,Hrh98475bond Stone 20 X 20 X 45 Cm,Hrh98475size Stone 20 X 20 X 25 Cms,Hrh98475hom Of Vibrator 0.71 Days,Hrh98475plasticizer / Super Plasticizer,Hrh98475add Sundries Charges At 2 Percenton Material,Hrh98475casurina Poles 100 - 150 Mm,Hrh98475add Handling , Loading And Unloading At 2Percenton Material,Hrh98475casurina Poles 75 - 100 Mm Dia,Hrh98475jungle Wood Runners And Planks,Hrh98475silver Oak Or Equivalent Planks 38 Mm Thick,Hrh98475add Watering Charges At 1 Percenton Material,Hrh98475mixer (Concrete) - 1 Cum Capacity,Hrh98475portland Cement,Hrh98475coarse Sand (Zone Iii),Hrh98475broken Stone Aggregate 12 Mm To 10 Mm Size,Hrh98475broken Stone Aggregate 20 Mm Size,Hrh98475broken Stone Aggregate 40 Mm Size,Hrh98475add Sundries Charges At 1 Percenton Material