Consultancy services for Authority’s Engineer for Supervision of Widening Reconstruction and Up gradation to 2 lanes with paved shoulder/Four lane configuration for the work of Sautada to Shirapur section of NH-561 from Design km.86+300 to km.125+589in the State of Mahrashtra on EPC mode (Project Length=39.289 km); 1 Key Personnel 2 Team Leader Cum Senior Highway Engineer 3 Resident cum Highway Engineer 4 Bridge/Structural Engineer 5 Senior Pavement Specialist 6 Senior Quality cum Material Expert 7 Road Safety Expert 8 Senior Contract Specialist 9 Sub Professional Staff 10 Survey Engineer 11 Highway Design Engineer 12 Assistant Highway Engineer 13 CAD Expert 14 Environmental Engineer 15 Bridge Design Engineer 16 Assistant Bridge Engineer 17 Assistant Quality cum Material Engineer 18 Electrical Engineer 19 HTMS/Toll Expert 20 Quantity Surveyor 21 Horticulture cum Landscaping Expert 22 Support Staff 23 Office Manager 24 Accountant cum cashier 25 Steno cum Computer Operator 26 Office Boy 27 Transportation (Fixed Costs) The vehicles hired by the Consultant shall include the cost For rental, drivers, operation, maintenance, repairs, insurance, etc. 28 Toyota Innova Crysta or equivalent (1 Nos.) (notmore than 6 months old) 29 Scorpio or equivalent (1Nos.) (notmore than 6 months old) 30 Duty Travel to Site (Fixed Costs) 31 Site to MORTH HQ 32 Site to Regional Office for Key professionals 20 round trips (By air economy class/train first AC/ Delux AC Bus) 33 Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairs, etc. 34 Office Rent 35 Office Supplies, Utilities and Communication (Fixed Costs) 36 Office Supplies 37 Drafting Supplies 38 Computer Running Costs 39 Domestic and International Communication 40 Office Furniture and Equipment (Rental) (Brand new Furniture and Equipment shall be mandatory at the time of commencement of services as per the list given below. The rental rate per month shall be quoted for the total list of Office Furniture and Equipment) 41 The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc. 42 Reports and Document Printing 43 Monthly Reports (Design and Construction) 44 Half yearly Reports 45 Various other reports as provided in the EPC Agreement such as Completion Report 46 Survey and Investigation A. Topographical Survey (Fixed Rate) 47 Surface defects detection and roughness measurement using Network Survey Vehicle 48 Pavement strength measurement using FWD 49 Bridge inspection using Mobile Bridge Inspection Unit 50 Road signs inspection using Retro Reflectometer 51 Contingency (AfixedamountofIndianRupeesONEMILLIONshallbeincludedinthe FinancialProposal.The provisions of Contingency shall be operated with the specific approval form the Competent Authority in RO Mumbai / MORTH.)