}

Tender For Annual Maintenance Contract For Repair And Maintenance Of Pumping Machinery And Allied Electro-Mechanical Equipments Installed In Different Stations Of Samba Town And Adj. Areas Falling Under The Jurisdiction Of Jal Shakti Phe Division Sam, samba-Jammu And Kashmir

Government Departments has published Tender For Annual Maintenance Contract For Repair And Maintenance Of Pumping Machinery And Allied Electro-Mechanical Equipments Installed In Different Stations Of Samba Town And Adj. Areas Falling Under The Jurisdiction Of Jal Shakti Phe Division Sam. Submission Date for this Tender is 30-07-2024. Pumping Machiney Tenders in samba Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

44359080
Tender For Annual Maintenance Contract For Repair And Maintenance Of Pumping Machinery And Allied Electro-Mechanical Equipments Installed In Different Stations Of Samba Town And Adj. Areas Falling Under The Jurisdiction Of Jal Shakti Phe Division Sam
Open Tender
Indian
Jammu And Kashmir
Samba
30-07-2024

Tender Details

Annual Maintenance Contract For Repair And Maintenance Of Pumping Machinery And Allied Electro-Mechanical Equipments Installed In Different Stations Of Samba Town And Adj. Areas Falling Under The Jurisdiction Of Jal Shakti Phe Division Samba 2024-25 Please Refer Boq- 1 Rewinding of Submersible Motors along with providing & fitting of submersible cable leads, each of length 1 mtr. and of suitable specification. Complete rewinding of 5 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 2 Complete rewinding of 7.5 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 3 Complete rewinding of 10 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 4 Complete rewinding of 12.5 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 5 Complete rewinding of 15 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 6 Complete rewinding of 17.5 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 7 Complete rewinding of 20 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 8 Complete rewinding of 22.5 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 9 Complete rewinding of 25 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 10 Complete rewinding of 27.5 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 11 Complete rewinding of 30 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 12 Complete rewinding of 35 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 13 Complete rewinding of 40 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 14 Complete rewinding of 45 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 15 Complete rewinding of 50 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. 16 Complete Rewinding of Induction motors 17 Disconnecting the electrical connections, disengaging the coupling pulley set, foot bolts of Horizontal Centrifugal Motor. 18 Carriage of the HC motor by head load nearest roadside and loading of the same into the mechanical transport for carriage to the workshop. 19 for head load 0-1 km 20 for head load 1-3 kms 21 for head load > 3kms 22 Disassembling the Rotor & Stator of HC motor. (at work shop/at site) 23 Reconditioning of Rotor shaft by way of welding, turning and finishing as per required size. 24 Assembling the Rotor & Stator of HC motor. (at work shop/at site) 25 Back Carriage of repaired HC motor by head load from the nearest roadside to the site. 26 for head load 0-1 km 27 for head load 1-3 kms 28 for head load > 3 kms 29 Fitting of Horizontal centrifugal motor on the base frame by way of engaging the coupling pulley set, fitting of foot bolts, making of electrical connections , making alignment with the pump and testing thereof. 30 Horizontal Squirrel cage High Speed Induction Motors 31 Complete rewinding of 7.5 HP induction motor. 32 Complete rewinding of 10 HP induction motor. 33 Complete rewinding of 12.5 HP induction motor. 34 Complete rewinding of 15 HP induction motor. 35 Complete rewinding of 20 HP induction motor. 36 Complete rewinding of 25 HP induction motor. 37 Complete rewinding of 30 HP induction motor. 38 Complete rewinding of 35 HP induction motor. 39 Complete rewinding of 40 HP induction motor. 40 Complete rewinding of 50 HP induction motor. 41 Complete rewinding of 60 HP induction motor. 42 Complete rewinding of 75 HP induction motor. 43 Complete rewinding of 80 HP induction motor. 44 Complete rewinding of 100 HP induction motor. 45 Complete rewinding of 125 HP induction motor. 46 Repair of Horizontal Centrifugal Pump - RKB make 47 Decoupling of pump from motor, checking for damage, minor repairs to be done at site if required and recoupling of repaired pump with motor, checking of realignment of pump and motor. 48 Manual carriage of the pump wherever required to the nearest roadside and loading into mechanical transport for carrage to workshop and back manual carrage of repaired pump from nearest roadside to the pumping station. 49 for head load distance 0 to 1 kms. 50 for head load distance 1-3 kms 51 for head load distance >3 kms 52 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (up to 5 stage) 53 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (6 stage to 10 stage) 54 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (Beyond 10 stage) 55 Fabrication of new S.S. pump shaft as per size and specification. (3 Stage Pump) 56 Fabrication of new S.S. pump shaft as per size and specification. (4 Stage Pump) 57 Fabrication of new S.S. pump shaft as per size and specification. (5 Stage Pump) 58 Fabrication of new S.S. pump shaft as per size and specification. (6 Stage Pump) 59 Fabrication of new S.S. pump shaft as per size and specification. (7 Stage Pump) 60 Fabrication of new S.S. pump shaft as per size and specification. (8 Stage Pump) 61 Fabrication of new S.S. pump shaft as per size and specification. (9 Stage Pump) 62 Fabrication of new S.S. pump shaft as per size and specification. (10 Stage Pump) 63 Fabrication of new S.S. pump shaft as per size and specification. (12 Stage Pump) 64 Fabrication of new S.S. pump shaft as per size and specification. (14 Stage Pump) 65 Providing of Brass Impeller as per sample with ID - 42 mm and OD - 156 mm 66 Providing of C.I Impeller as per sample with ID - 42 mm and OD - 156 mm 67 Repairing of brass Impeller 68 Repairing of C.I Impeller 69 Fabrication of neck ring 70 Fabrication of diffuser bush 71 Fabrication of gland bush 72 Fabrication of chuck nut 73 Providing of pump bowl 74 Repair to bearing housing by sleeve fitting & boring for bearing size 75 Providing bearing housing along with side cover plate 76 Providing of Delivery Body 77 Providing of Suction Body 78 Providing of diffuser 79 Providing of Oil seal 80 Providing Coupling bolts nuts & rubber bushes 81 Dismantling & fitting of Pump (3 stage to 5 stage) 82 Dismantling & fitting of Pump (6 stage to 10 stage) 83 Dismantling & fitting of Pump (Beyond 10 stage) 84 Repair of Horizontal Centrifugal Pump - FNC make 85 Decoupling of pump from motor, checking for damage, minor repairs to be done at site if required and recoupling of repaired pump with motor, checking of realignment of pump and motor. 86 Manual carriage of the pump wherever required to the nearest roadside and loading into mechanical transport for carrage to workshop and back manual carrage of repaired pump from nearest roadside to the pumping station. 87 for head load distance 0 to 1 kms. 88 for head load distance 1-3 kms 89 for head load distance > 3 kms 90 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (up to 5 stage) 91 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (6 stage to 10 stage) 92 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (Beyond 10 stage) 93 Fabrication of new S.S. pump shaft as per size and specification. (3 Stage Pump) 94 Fabrication of new S.S. pump shaft as per size and specification. (4 Stage Pump) 95 Fabrication of new S.S. pump shaft as per size and specification. (5 Stage Pump) 96 Fabrication of new S.S. pump shaft as per size and specification. (6 Stage Pump) 97 Fabrication of new S.S. pump shaft as per size and specification. (7 Stage Pump) 98 Fabrication of new S.S. pump shaft as per size and specification. (8 Stage Pump) 99 Fabrication of new S.S. pump shaft as per size and specification. (9 Stage Pump) 100 Fabrication of new S.S. pump shaft as per size and specification. (10 Stage Pump) 101 Fabrication of new S.S. pump shaft as per size and specification. (12 Stage Pump) 102 Fabrication of new S.S. pump shaft as per size and specification. (14 Stage Pump) 103 Providing of Brass Impeller as per sample with ID - 25 mm and OD - 138 mm 104 Providing of Brass Impeller as per sample with ID - 34 mm and OD - 160 mm 105 Providing of C.I Impeller as per sample with ID - 25 mm and OD - 138 mm 106 Providing of C.I Impeller as per sample with ID - 34 mm and OD - 160 mm 107 Repairing of brass Impeller 108 Repairing of C.I Impeller 109 Fabrication of neck ring 110 Fabrication of diffuser bush 111 Fabrication of gland bush 112 Fabrication of chuck nut 113 Providing of pump bowl 114 Repair to bearing housing by sleeve fitting & boring for bearing size 115 Providing bearing housing along with side cover plate 116 Providing of Delivery Body 117 Providing of Suction Body 118 Providing of diffuser 119 Providing of Oil seal 120 Providing Coupling bolts nuts & rubber bushes. 121 Dismantling & fitting of Pump (3 stage to 5 stage) 122 Dismantling & fitting of Pump (6 stage to 10 stage) 123 Dismantling & fitting of Pump (Beyond 10 stage) 124 Repair of Horizontal Centrifugal Pump - MATHER & PLATT make 125 Decoupling of pump from motor, checking for damage, minor repairs to be done at site if required and recoupling of repaired pump with motor, checking of realignment of pump and motor. 126 Manual carriage of the pump wherever required to the nearest roadside and loading into mechanical transport for carrage to workshop and back manual carrage of repaired pump from nearest roadside to the pumping station. 127 for head load distance 0 to 1 kms. 128 for head load distance 1-3 kms 129 for head load distance >3 kms 130 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (up to 5 stage) 131 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (6 stage to 10 stage) 132 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (Beyond 10 stage) 133 Fabrication of new S.S. pump shaft as per size and specification. (3 Stage Pump) 134 Fabrication of new S.S. pump shaft as per size and specification. (4 Stage Pump) 135 Fabrication of new S.S. pump shaft as per size and specification. (5 Stage Pump) 136 Fabrication of new S.S. pump shaft as per size and specification. (6 Stage Pump) 137 Fabrication of new S.S. pump shaft as per size and specification. (7 Stage Pump) 138 Fabrication of new S.S. pump shaft as per size and specification. (8 Stage Pump) 139 Fabrication of new S.S. pump shaft as per size and specification. (9 Stage Pump) 140 Fabrication of new S.S. pump shaft as per size and specification. (10 Stage Pump) 141 Fabrication of new S.S. pump shaft as per size and specification. (12 Stage Pump) 142 Fabrication of new S.S. pump shaft as per size and specification. (14 Stage Pump) 143 Providing of Brass Impeller as per sample with ID - 38 mm and OD - 160 mm 144 Providing of Brass Impeller as per sample with ID - 42 mm and OD - 205 mm 145 Providing and fitting of C.I Impeller as per sample with ID - 38 mm and OD - 160 mm 146 Providing and fitting of C.I Impeller as per sample with ID - 42 mm and OD - 205 mm 147 Repairing of brass Impeller 148 Repairing of C.I Impeller 149 Fabrication of neck ring 150 Fabrication of diffuser bush 151 Fabrication of gland bush 152 Fabrication of chuck nut 153 Providing of pump bowl 154 Repair to bearing housing by sleeve fitting & boring for bearing size 155 Providing bearing housing along with side cover plate 156 Providing of oil cooled brass bush 157 Providing of Delivery Body 158 Providing of Suction Body 159 Providing of diffuser 160 Providing of Oil seal 161 Providing Coupling bolts nuts & rubber bushes. 162 Dismantling & fitting of Pump (3 stage to 5 stage) 163 Dismantling & fitting of Pump (6 stage to 10 stage) 164 Dismantling & fitting of Pump (Beyond 10 stage) 165 Repair of Horizontal Centrifugal Pump - KSB make 166 Decoupling of pump from motor, checking for damage, minor repairs to be done at site if required and recoupling of repaired pump with motor, checking of realignment of pump and motor. 167 Manual carriage of the pump wherever required to the nearest roadside and loading into mechanical transport for carrage to workshop and back manual carrage of repaired pump from nearest roadside to the pumping station. 168 for head load distance 0 to 1 kms. 169 for head load distance 1-3 kms 170 for head load distance >3 kms 171 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (up to 5 stage) 172 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (6 stage to 10 stage) 173 Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (Beyond 10 stage) 174 Fabrication of new S.S. pump shaft as per size and specification. (3 Stage Pump) 175 Fabrication of new S.S. pump shaft as per size and specification. (4 Stage Pump) 176 Fabrication of new S.S. pump shaft as per size and specification. (5 Stage Pump) 177 Fabrication of new S.S. pump shaft as per size and specification. (6 Stage Pump) 178 Fabrication of new S.S. pump shaft as per size and specification. (7 Stage Pump) 179 Fabrication of new S.S. pump shaft as per size and specification. (8 Stage Pump) 180 Fabrication of new S.S. pump shaft as per size and specification. (9 Stage Pump) 181 Fabrication of new S.S. pump shaft as per size and specification. (10 Stage Pump) 182 Fabrication of new S.S. pump shaft as per size and specification. (12 Stage Pump) 183 Fabrication of new S.S. pump shaft as per size and specification. (14 Stage Pump) 184 Providing and fitting of Brass Impeller 185 Providing and fitting of C.I Impeller 186 Repairing of brass Impeller 187 Repairing of C.I Impeller 188 Fabrication of neck ring 189 Fabrication of diffuser bush 190 Fabrication of gland bush 191 Fabrication of chuck nut 192 Providing of pump bowl 193 Repair to bearing housing by sleeve fitting & boring for bearing size 194 Providing bearing housing along with side cover plate 195 Fabrication of spacer bush 196 Providing of Delivery Body 197 Providing of Suction Body 198 Providing of diffuser 199 Providing of Oil seal 200 Providing Coupling bolts nuts & rubber bushes. 201 Dismantling & fitting of Pump (3 stage to 5 stage) 202 Dismantling & fitting of Pump (6 stage to 10 stage) 203 Dismantling & fitting of Pump (Beyond 10 stage) 204 Repairing of Submersible Pump (V-4 make) 205 Repairing of pump shaft by welding, turning, polishing & making of key ways 206 Fabrication / providing of pump shaft as per exact size & specification 207 Fabrication / providing of impeller 208 Providing of V-4 plastic impeller 209 Repairs to Impeller 210 Fabrication / providing of Neck Ring 211 Fabrication / providing of Body Bush 212 Fabrication / providing of Guide Bush 213 Fabrication / providing of Spacer Bush 214 Fabrication / providing of Cotter 215 Fabrication / providing of Coupling pulley with cotter 216 Fabrication / providing of Pump Body 217 Fabrication / providing of Suction Body 218 Dismantling and fitting charges of V-4 submersible pump 219 Repairing of Submersible Pump (V-6 make) 220 Repairing of pump shaft by welding, turning, polishing & making of key ways 221 Fabrication / providing of pump shaft as per exact size & specification (up to 5 stage) 222 Fabrication / providing of S.S. pump shaft as per exact size & specification (6 stage to 10 stage) 223 Fabrication / providing of pump shaft as per exact size & specification (11 stage to 15 stage) 224 Fabrication / providing of pump shaft as per exact size & specification (16 stage to 20 stage) 225 Fabrication / providing of S.S. pump shaft as per exact size & specification (Beyond 20 stage) 226 Fabrication / providing of impeller 227 Providing of V-6 plastic impeller 228 Repairs to Impeller 229 Fabrication / providing of Neck Ring 230 Fabrication / providing of Body Bush 231 Fabrication / providing of Guide Bush 232 Fabrication / providing of Spacer Bush 233 Fabrication / providing of Cotter 234 Fabrication / providing of Pump Body 235 Fabrication / providing of Suction Body 236 Fabrication / providing of Coupling pulley with cotter for V-6 Submersible motor 237 Fabrication / providing of 50 mm dia. flanged adaptor with threading at other side 238 Fabrication / providing of 65 mm dia. flanged adaptor with threading at other side 239 Fabrication / providing of 80 mm dia. flanged adaptor with threading at other side 240 Dismantling and fitting charges of pump (up to 5 stage) 241 Dismantling and fitting charges of pump (6 stage to 10 stage) 242 Dismantling and fitting charges of pump (11 stage to 15 stage) 243 Dismantling and fitting charges of pump (Beyond 15 stage) 244 Repairing of Submersible Pump (V-8 make) 245 Repairing of pump shaft by welding, turning, polishing & making of key ways 246 Fabrication / providing of pump shaft as per exact size & specification 247 Fabrication / providing of Impeller 248 Repairs to Impeller 249 Fabrication / providing of Neck Ring 250 Fabrication / providing of Body Bush 251 Fabrication / providing of Guide Bush 252 Fabrication / providing of Spacer Bush 253 Fabrication / providing of Cotter 254 Fabrication / providing of Coupling pulley with cotter for V-8 submersible pump 255 Fabrication / providing of Pump Body 256 Fabrication / providing of Suction Body 257 Fabrication / providing of NRV with adaptor for V8 pump 258 Fabrication / providing of flanged adaptor with threading at other end for V8 pump 259 Dismantling and fitting charges of V-8 submersible pump 260 Bearings, valves, accessories & allied items for HC / submersible pumps 261 Replacement by providing & fitting of bearing-7307 (SKF/NBC/FAG/Reputed make) 262 Replacement by providing & fitting of bearing-7308 (SKF/NBC/FAG/Reputed make) 263 Replacement by providing & fitting of bearing-7309 (SKF/NBC/FAG/Reputed make) 264 Replacement by providing & fitting of bearing-6209 (SKF/NBC/FAG/Reputed make) 265 Replacement by providing & fitting of bearing-6212 (SKF/NBC/FAG/Reputed make) 266 Replacement by providing & fitting of bearing-6213 (SKF/NBC/FAG/Reputed make) 267 Replacement by providing & fitting of bearing NU-204 (SKF/NBC/FAG/Reputed make) 268 Replacement by providing & fitting of bearing NU-205 (SKF/NBC/FAG/Reputed make) 269 Replacement by providing & fitting of bearing NU-206 (SKF/NBC/FAG/Reputed make) 270 Replacement by providing & fitting of bearing NU-208 (SKF/NBC/FAG/Reputed make) 271 Replacement by providing & fitting of bearing NU-308 (SKF/NBC/FAG/Reputed make) 272 Replacement by providing & fitting of bearing NU-309 (SKF/NBC/FAG/Reputed make) 273 Replacement by providing & fitting of bearing N- 6305 (SKF/NBC/FAG/Reputed make) 274 Replacement by providing & fitting of bearing 6306-ZZ (SKF/NBC/FAG/Reputed make) 275 Replacement by providing & fitting of bearing 6307-ZZ (SKF/NBC/FAG/Reputed make) 276 Replacement by providing & fitting of bearing 6308-ZZ (SKF/NBC/FAG/Reputed make) 277 Replacement by providing & fitting of bearing 6309-ZZ (SKF/NBC/FAG/Reputed make) 278 Replacement by providing & fitting of bearing 6310-ZZ (SKF/NBC/FAG/Reputed make) 279 Replacement by providing & fitting of bearing 6311-ZZ (SKF/NBC/FAG/Reputed make) 280 Replacement by providing & fitting of bearing 6312-ZZ (SKF/NBC/FAG/Reputed make) 281 Replacement by providing & fitting of bearing 6313-ZZ (SKF/NBC/FAG/Reputed make) 282 Replacement by providing & fitting of bearing - 6314 (SKF/NBC/FAG/Reputed make) 283 Replacement by providing & fitting of bearing - 6315 (SKF/NBC/FAG/Reputed make) 284 Replacement by providing & fitting of bearing - 6316 (SKF/NBC/FAG/Reputed make) 285 Star Coupling Complete L-150 (Reputed Make) 286 Star Coupling Complete L-190 (Reputed Make) 287 Star Coupling Complete L-225 (Reputed Make) 288 Star Coupling Complete L-226 (Reputed Make) 289 Fabrication / providing of heavy duty MS coupling pulley set machined to exact size with cotters (100 mm dia) 290 Fabrication / providing of heavy duty MS coupling pulley set machined to exact size with cotters (125 mm dia) 291 Fabrication / providing of heavy duty MS coupling pulley set machined to exact size with cotters (150 mm dia) 292 Fabrication / providing of heavy duty MS coupling pulley set machined to exact size with cotters (175 mm dia) 293 Fabrication / providing of heavy duty MS coupling pulley set machined to exact size with cotters (200 mm dia) 294 Providing & fitting of 50 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make) 295 Providing & fitting of 65 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make) 296 Providing & fitting of 80 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make) 297 Providing & fitting of 100 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make) 298 Providing & fitting of 150 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make) 299 Providing & fitting of 50 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make) 300 Providing & fitting of 65 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make) 301 Providing & fitting of 80 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make) 302 Providing & fitting of 100 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make) 303 Providing & fitting of 150 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make) 304 Fabrication & providing of MS Clamp 3 305 Fabrication & providing of MS Clamp 4 306 Providing of Gland Packing of assorted size 8mm, 10mm, 12mm (Champion/Reputed Make) 307 Providing of Rubber insertionSheet (Reputed Make ) 308 Providing of Nut Bolts of assorted size & length (19 no.,21 no.,24 no. 27 no. etc.) 309 Providing of Puncher Roll (Reputed Make) 310 Providing of Insulation Tape (Reputed Make) 311 Providing of Grease 312 Providing of M-Oil for HC pumps 313 Repair to rotor of Horizontal Squirrel cage High Speed Induction Motors 314 7.5 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job. 315 Repair to rotor of 10 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 316 Repair to rotor of 12.5 HP induction motor.The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 317 Repair to rotor of 15 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 318 Repair to rotor of 20 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 319 Repair to rotor of 25 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 320 Repair to rotor of 30 HP induction motor.The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 321 Repair to rotor of 35 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 322 Repair to rotor of 40 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 323 Repair to rotor of 50 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 324 Repair to rotor of 60 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 325 Repair to rotor of 75 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 326 Repair to rotor of 80 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 327 Repair to rotor of 100 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 328 Repair to rotor of 125 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job 329 Replacement of parts of different capacities of transformers 330 Providing and fitting of New LV Leg Coils Copper (DPC) 331 250 KVA 332 100 KVA 333 63 KVA 334 Providing and fitting of New LV Leg Coils Aluminum (DPC) 335 250 KVA 336 100 KVA 337 63 KVA 338 Providing and fitting of New HV Leg Coils Copper 339 250 KVA 340 100 KVA 341 63 KVA 342 Providing and fitting of New HV Leg Coils Copper (DPC) 343 250 KVA 344 100 KVA 345 63 KVA 346 Providing and fitting of New HV Leg Coils Aluminum (SE) 347 250 KVA 348 100 KVA 349 63 KVA 350 Providing and fitting of New HV Leg Coils Aluminum (DPC) 351 250 KVA 352 100 KVA 353 63 KVA 354 Reconditioning of LV Copper Coils 355 250 KVA 356 100 KVA 357 63 KVA 358 Reconditioning of LV Aluminum Coils 359 250 KVA 360 100 KVA 361 63 KVA 362 Providing and Fitting of HV Bushing 363 250 KVA 364 100 KVA 365 63 KVA 366 Providing and Fitting of LV Bushing 367 250 KVA 368 100 KVA 369 63 KVA 370 Providing and Fitting of LV bush rod (metal part) 371 250 KVA 372 100 KVA 373 63 KVA 374 Providing and Fitting of HT bush rod (metal part) 375 250 KVA 376 100 KVA 377 63 KVA 378 Providing and Fitting of Gasket Set 379 250 KVA 380 100 KVA 381 63 KVA 382 Providing and Fitting of tapping switch with handle 383 250 KVA 384 100 KVA 385 63 KVA 386 Providing and Fitting of LT Terminal Plate 387 250 KVA 388 100 KVA 389 63 KVA 390 Providing and Fitting of Oil drain valve 391 250 KVA 392 100 KVA 393 63 KVA 394 Providing and Fitting of core laminations 395 250 KVA 396 100 KVA 397 63 KVA 398 Painting 399 250 KVA 400 100 KVA 401 63 KVA 402 Silica gel breather 403 250 KVA 404 100 KVA 405 63 KVA 406 Providing and Fitting of SundryItems 407 250 KVA 408 100 KVA 409 63 KVA 410 Arresting of oil leakages if any by way of welding etc. 411 250 KVA 412 100 KVA 413 63 KVA 414 Heat Treatment of repaired transformer 415 250 KVA 416 100 KVA 417 63 KVA 418 Providing and filling of fresh transformer oil at site 419 250 KVA 420 100 KVA 421 63 KVA 422 Disconnecting of distribution transformer HT links and HT/LT sidde cables. Dismounting the transformer from poles/platform using crane and skilled labour and loading into the meachanical transport. 423 250 KVA 424 100 KVA 425 63 KVA 426 Draining of transformer oil in barrels, dismantling of top cover and extracting out assembly using chain pulley block and tripod and checking for fault. 427 250 KVA 428 100 KVA 429 63 KVA 430 Assembling of transformer and lowering into the tank using chain pullry block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating. 431 250 KVA 432 100 KVA 433 63 KVA 434 Loading of transformer into mechanical transport using crane and skilled labour. Mounting the transformer on poles/platform with the help of crane and skilled labour. Making of LT as well as HT side cable connections, charging the transformer on no load conditions and thereafter checking on full load conditions. 435 250 KVA 436 100 KVA 437 63 KVA 438 Rebate on account of copper scrap 439 250 KVA 440 100 KVA 441 63 KVA 442 Rebate on account of aluminum scrap 443 250 KVA 444 100 KVA 445 63 KVA 446 Rebate on account of Oil T-Oil 447 250 KVA 448 100 KVA 449 63 KVA 450 Rebate on account of burnt core laminations 451 250 KVA 452 100 KVA 453 63 KVA 454 Replacement of parts LT Control panels, voltage stabilizers etc. 455 Replacement of damaged MNX 50 456 Replacement of damaged MNX 70 457 Replacement of damaged MNX 95 458 Replacement of damaged MNX 110 459 Replacement of damaged MNX 140 460 Replacement of damaged kit of MNX 50 461 Replacement of damaged kit of MNX 70 462 Replacement of damaged kit of MNX 95 463 Replacement of damaged kit of MNX 110 464 Replacement of damaged kit of MNX 140 465 Replacement of damaged Voltmeter 466 Replacement of damaged Ampere meter 467 Replacement of damaged Selector switch 468 Replacement of damaged CT Coil 469 Replacement of damaged MPR( Gardian Make) 470 Replacement of damaged overload relay 471 Replacement of damaged under voltage relay 472 Replacement of damaged over voltage relay 473 Replacement of damaged single phase/ reverse phase relay 474 Replacement of damaged internal wiring 475 Replacement of damaged MCCB-100 Amp 476 Replacement of damaged MCCB-125 Amp 477 Replacement of damaged MCCB-160 Amp 478 Replacement of damaged MCCB-250 Amp 479 Repair to Star Delta Starters of capacity 20 HP/30 HP by way of replacement of damaged contact points, no-load coil, contact point holders, replacement of T-Oil and testing on load. 480 Repair to Star Delta Starters of capacity 40 HP/50 HP by way of replacement of damaged contact points, no-load coil, contact point holders, replacement of T-Oil and testing on load. 481 Repair to Star Delta Starters of capacity 60 / 70 HP by way of replacement of damaged contact points, no-load coil, contact point holders, replacement of T-Oil and testing on load. 482 Repair to Star Delta Starters of capacity 80 HP/100 HP by way of replacement of damaged contact points, no-load coil, contact point holders, replacement of T-Oil and testing on load. 483 Repair to Star Delta Starters of capacity 100 HP/120 HP by way of replacement of damaged contact points, no-load coil, contact point holders, replacement of T-Oil and testing on load. 484 63 KVA Manual Voltage Stablizer 485 Rewinding of copper coils 486 Providing and fitting of Rotary switch as per size 487 Providing and Fitting of Change over switch 160 Ampere 488 Providing and Fitting of MCCB of 200 Ampere capacity. 489 Providing and Fitting of Indicator switch 490 Providing and Fitting of selector switch and voltmeter 491 Providing and Fitting of selector switch and ammeter with CT set. 492 Providing and Fitting of Nut bolts 493 Providing and Filling of Fresh Transformer Oil 494 Complete wiring job with insulator 495 Repair of the stabilizer tank by welding and complete Painting 496 Sundry items 497 Labour charges for disconnecting the electrical connections of stabilizer , repair of stabilizer at workshop, making electrical connections of repaired atabilizer at site and thereafter checking on full load conditions. 498 Crane Charges for handling of stabilizer at site and loading into the mechanical transport for repairs and unloading of stabilizer after repairs from mechanical transport to site. 499 Rebate on account of copper scrap 500 Rebate on account of old T-oil 501 100 KVA Manual Voltage Stablizer 502 Rewinding of copper coils 503 Providing and fitting of Rotary switch as per size 504 Providing and Fitting of Change over switch 160 Ampere 505 Providing and Fitting of MCCB of 200 Ampere capacity. 506 Providing and Fitting of Indicator switch 507 Providing and Fitting of selector switch and voltmeter 508 Providing and Fitting of selector switch and ammeter with CT set. 509 Providing and Fitting of Nut bolts 510 Providing and Filling of Fresh Transformer Oil 511 Complete wiring job with insulator 512 Repair of the stabilizer tank by welding and complete Painting 513 Sundry items 514 Labour charges for disconnecting the electrical connections of stabilizer , repair of stabilizer at workshop, making electrical connections of repaired atabilizer at site and thereafter checking on full load conditions. 515 Crane Charges for handling of stabilizer at site and loading into the mechanical transport for repairs and unloading of stabilizer after repairs from mechanical transport to site. 516 Rebate on account of copper scrap 517 Rebate on account of old T-oil 518 250 KVA Manual Voltage Stablizer 519 Rewinding of copper coils 520 Providing and fitting of Rotary switch as per size 521 Providing and Fitting of Change over switch 160 Ampere 522 Providing and Fitting of MCCB of 200 Ampere capacity. 523 Providing and Fitting of Indicator switch 524 Providing and Fitting of selector switch and voltmeter 525 Providing and Fitting of selector switch and ammeter with CT set. 526 Providing and Fitting of Nut bolts 527 Providing and Filling of Fresh Transformer Oil 528 Complete wiring job with insulator 529 Repair of the stabilizer tank by welding and complete Painting 530 Sundry items 531 Labour charges for disconnecting the electrical connections of stabilizer, repair of stabilizer at workshop, making electrical connections of repaired atabilizer at site and thereafter checking on full load conditions. 532 Crane Charges for handling of stabilizer at site and loading into the mechanical transport for repairs and unloading of stabilizer after repairs from mechanical transport to site. 533 Rebate on account of copper scrap 534 Rebate on account of old T-oil 535 Providing and fitting of submersible / copper / LT Al cables, main switches, Star Delta Starters / MUG panels of various capacities. 536 Providing and fitting of HRC Type TP Main Switch -100 Amp 537 Providing and fitting of HRC Type TP Main Switch -200 Amp 538 Providing and fitting ofHRC Type TP Main Switch - 400 Amp 539 Providing and fitting of LT 3-½ core Al. Arrmoured cable with new one of size 70mm² including laying and cost of thimbles 540 Providing and fitting of LT 3-½ core Al. Arrmoured cable with new one of size 95mm² per meter including laying and cost of thimbles 541 Providing and fitting of LT 3-½ core Al. Arrmoured cable with new one of size 120mm² per meter including laying and cost of thimbles 542 Providing and fitting of LT 3-½ core Al. Arrmoured cable with new one of size 150mm² per meter including laying and cost of thimbles 543 Providing and fitting of LT 3-½ core Al. Arrmoured cable with new one of size 185mm² per meter including laying and cost of thimbles 544 Providing and fitting of multistrand copper cable with new one of size 16mm² per meter including laying and cost of thimbles 545 Providing and fitting of multistrand copper cable with new one of size 25mm² per meter including laying and cost of thimbles 546 Providing and fitting of multistrand copper cable with new one of size 35mm² per meter including laying and cost of thimbles 547 Providing and fitting of multistrand copper cable with new one of size 50mm² per meter including laying and cost of thimbles 548 Providing and fitting of multistrand copper cable with new one of size 70mm² per meter including laying and cost of thimbles 549 Providing and fitting of submerssible copper cable with new one of size 6mm² per meter including laying and cost of thimbles 550 Providing and fitting of submerssible copper cable with new one of size 10mm² per meter including laying and cost of thimbles 551 Providing and fitting of submerssible copper cable with new one of size 16mm² per meter including laying and cost of thimbles 552 Providing & Fitting of Star Delta Starters 553 10 HP 554 20 HP 555 30 HP 556 40 HP 557 50 HP 558 60 Hp 559 70 HP 560 80 HP 561 90 HP 562 100 HP 563 Providing & Fititng ofMU-G Panels 564 MU-G 10 565 MU-G 20 566 MU-G 30 567 MU-G 40 568 MU-G 50 569 Extraction and lowering of submersible pump sets. 570 Extraction of submersible pump set having G.I. / M.S. pipe flanged column assembly from deep bore tube wells and lowering of the repaired submersible pump set after coupling and jointing of submersible cable with the connection cables. Lowering the submersible pump along with column pipes one by one using chain pulley block (manually or by long boom crane). The flanges shall have to be tightened by placing rubber insertion sheets and suitable nuts, bolts and washers etc (nuts, bolts, washers, rubber insertion sheets, patch rolls, insulation tapes to be provided by contractor) with due care under the jurisdiction of Jal Shakti PHE Division Samba as per details below: 571 Column pipes having 50 / 65 / 80 mm dia up to a depth of 30 meters (Pump dia 100 / 150 / 200 mm) 572 Column pipes having 50 / 65 / 80 mm dia up to a depth of 60 meters (Pump dia 100 / 150 / 200 mm) 573 Column pipes having 50 / 65 / 80 mm dia up to a depth of 130 meters (Pump dia 100 / 150 / 200 mm) 574 Column pipes having 100 mm dia up to a depth of 50 meters (Pump dia 150 / 200 mm) 575 Submersible pump set from the Dugwells / open wells.

Key Value

Document Fees
INR 1000 /-
EMD
INR 100000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail