}

Tender For Services For Job Work, Work Group-2 (A) Liquid Milk Packing And Dispatch Work 1. Liquid Milk Packing And Machine Operation/Maintenance Work. Plant Operator Cip/Manual Cleaning/Category Cleaning Work By Running Cat Washer And Manual Cat Cleanin, meerut-Uttar Pradesh

Cooperative has published Tender For Services For Job Work, Work Group-2 (A) Liquid Milk Packing And Dispatch Work 1. Liquid Milk Packing And Machine Operation/Maintenance Work. Plant Operator Cip/Manual Cleaning/Category Cleaning Work By Running Cat Washer And Manual Cat Cleanin. Submission Date for this Tender is 30-07-2024. Tanks and Cylinders Tenders in meerut Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

44358068
Tender For Services For Job Work, Work Group-2 (A) Liquid Milk Packing And Dispatch Work 1. Liquid Milk Packing And Machine Operation/Maintenance Work. Plant Operator Cip/Manual Cleaning/Category Cleaning Work By Running Cat Washer And Manual Cat Cleanin
Open Tender
Indian
Uttar Pradesh
Meerut
30-07-2024

Tender Details

tender for Services For Job Work, Work Group-2 (A) Liquid Milk Packing and Dispatch Work 1. Liquid milk packing and machine operation/maintenance work. Plant operator CIP/manual cleaning/category cleaning work by running cat washer and manual cat cleaning work. And so on. 150 ml from sachet machines. 170ml/200ml, 270ml, 300ml. 450 ml / 500 ml / 1000 ml / 5000 ml. Plant operator in polypack work and other page pack sizes like 6000 ml etc. Machine Operator Diploma in ITI or minimum 05 years of experience in the field related to Plant and Machinery (approximately quantity 40000 to 1.0 lakh liters per day) which may increase or decrease. Packing work time is from 9:00 am to 6:00 pm or as per the requirement of the organization (approximately quantity 40000 to 1.0 lakh liters per day) 2. Milk dispatch work - The work of dispatching by employing loading guards and labourers, gorting the leakage pouches released at the time of dispatch by putting them in cold water and the work of cutting the leakage pouches in the leakage tank and manual cleaning work. Receiving empty crates and maintaining records, etc. Dispatch working time: 1:00 pm to 9:00 pm and 11:00 pm to 6:00 am or as per the requirement of the organization. Working Group 2B Function of Process Section: 1) Milk processing work by doing plant operation in the production section / milk / butter homogenization / reconstitution (powder dissolving work) / CIP / manual cleaning / manual cleaning of pipelines: Plant operation work by experienced workers up to 05 years. (Diploma in ITI or minimum 05 years experience in Plant and Machinery related field). (2) The quantity of milk is approximately 50000 liters to 2.0 lakh liters per day. Mainly for the city supply, the timing of milk processing work by running plant and machinery will be from 10:00 pm to 6:00 am, so that packing can be started at 09:00 am. Apart from this, according to the quantity of milk available/organization. Milk processing work will also have to be done as per requirement. The work of mixing powder and butter and operation of homogenizer will have to be done between 7:00 am to 3:00 pm and as per the requirement of the institution. Surprise city milk supply vehicle checking work Under the above work, on the instructions of the shift in-charge/security officer, unloading the bags from the vehicle, calculating the correct quantity, checking, loading it again in the vehicle etc. This work will be done by employing labor as per requirement. Cleaning work of checking room and outer area. Any number of vehicles can be checked per day. In case of not doing so, as penalty, daily rate will be deducted from your bills as per the rules and charges shown in the tender form. And you have to keep changing the checking labor every month. So that there is no irregularity. For the said work, the checking work will have to be completed by providing minimum 01 to 02 workers from 1:00 pm to 9:00 pm and from 11:00 pm to 7:00 am and as per the requirement of the organization. Note- The work of vehicle checking will not be allotted to the contractor doing milk packing and dispatch related work. working group 2c Milk powder (SMP, WMP and dairy whitener) production, plant operation / packing (in 25 kg KP bags) / transfer of packed bags to the store / plant and line CIP / manual cleaning work / and break down. During maintenance work and if required, preparing 1 kg packets from 25 kg powder bang and filling 25 packets in bags etc. Plant Operator Diploma in ITI or minimum 5 years experience in Plant and Machinery related field. Butter production process from butter churn Butter churn operation / CIP / manual cleaning work (table butter white butter) For the production of table butter/white butter, operations of butter churn like shifting cream from cream tank to butter churn, adding salt, adding color, taking out the butter in trolley and line CIP and manual cleaning etc. will also have to be done. For this work, the work will have to be done by providing butter churn operators and workers as per requirement. No separate labor will be payable. You will also have to do CIP and cleaning work of the line/butter churn before and after production. For which no separate payment will be made by the institution. In case of production, 01 worker and 01 operator per shift or as per the requirement of the organization. It will be mandatory for the butter churn operator to be proficient in this work. Butter packing work and operation/CIP/Manual cleaning work: Table Butter 100 Gram Packing Table Butter 500 Gram Packing Table butter 20 kg / White butter 20 kg in bulk Ghee production and ghee packing work: Plant operator/machine operator/laborer/CIP/manual cleaning work: (ITI diploma or minimum 5 years experienced workers) Working Group 2-D - Production of flavored milk, salty buttermilk and packing work in 200/400 ml polypack / operation / CIP / manual cleaning work: - Plain buttermilk/keem production and packing work in 270/300/500/1000 ml/operation/CIP/manual cleaning work: - Curd production and packing work in 150/200/400/1000/2000/5000/10000/15000 gram polypack/plastic cup/container/operation/CIP/manual cleaning work. Curd production and packing in 500 ml/1000 ml polypack. Work/Operation/CIP/Manual Cleaning Work and Dispatch of Milk Products Work will also have to be done. Note- The quality of milk products like chemical/bacteriologically will be kept within the standards while maintaining complete hygiene and page cleanliness and will not be affected by any defect. Will be fully responsible for irregularities. Quantity: About 4000 to 10,000 kg/litre per day Chhena Kheer production and packing work in 80 gram/100 gram plastic cups (machine and manual packing)/operation work. Production and packing of Peda/Laddu (250 grams/500 grams/1000 grams) (machine and manual packing)/operation/CIP/manual cleaning work and processing of milk products. Dispatch work Paneer and Khoya production and packing work/operation/CIP/manual cleaning work: Quantity: Approximately 200-500 kg per day Production and packing (A) 100/200/500/1000 gram cheese production and manual/vacuum packing work. (B) 100/500/1000 gram Khoya/Production and manual/vacuum packing work. Working Group 2E Work of Lab Attendant in Quality Assurance Section It is very important to have at least 05 to 10 years of experience in dairy lab work. The work will have to be done by providing minimum 03 semi-skilled workers per shift. The payment of any worker should not be less than the minimum wage as per the category declared by the Labor Department. Will be done. Qualification: 10/12th pass. Work of testing of milk and milk products etc. in Quality Assurance Section (B.Sc./M.Sc. (Chemistry), M.Sc.-Food Science/Dairy Science, Bio Tech. The work will have to be done as per requirement by providing minimum 05 skilled experienced workers per shift. No worker will be paid less than the minimum wage as per the category declared by the Labor Department. Must have at least 05 to 10 years of work experience. Mycobiologist testing etc. work in quality assurance section. (Experienced 05 to 10 years with MSc Micro Biology, MSc Food Science/Dairy Science qualification) Testing of milk and milk products will have to be done by providing minimum 01 skilled experienced laborer per shift. No worker will be paid less than the minimum wage as per the category declared by the Labor Department. Working Group 2F Milk weighing work in raw milk receiving section: Workers/Plant operator/CIP/Manual cleaning work RMRD: (a.) For Meerut Dairy, weighing work will have to be done by employing a minimum of 05 workers (on actual weighing quantity) on one dock run. working group 2g 1. Job Functions of Engineering Section 1. Boiler Operator Electrician, Motor Rebinder Fitter Refrigeration Mechanic and Welder Instrumentation, Refrigeration and R.O. Operation, repair and maintenance work of the plant, maintenance/repair work of 02 butter packing machines and butter churns of the organization, C.I.P., Work Gapon repair and maintenance work, operation/repair/maintenance work of boiler and air heater and boiler. Coal dumping work, electrical and motor rebuilding and electronic maintenance work in the institution, packing of milk powder by dosing nitrogen in 200, 400, 500, 750 and 1000 gram packs from 25 kg powder bag by Nacon machine and machine operation / maintenance / repair work is also done in the same work. Is included in. ETP operation work will have to be done as per the standards of Pollution Control Board (Qualification should be ITI trained/diploma certificate in related field) or 05 to 10 years of experience in related work. Refrigeration, and R.O. Operation, repair and maintenance work of the plant: Each plant will have to be successfully operated 24 hours a day in all three shifts by skilled workers so that the temperature of milk and milk producers is maintained as per the standards. The maintenance and repair work of the refrigeration plant will have to be done only by ITI/Diploma holders with minimum 05 years experienced trade persons having knowledge of the related work. Operating the walls of the refrigeration plant and maintenance and operation of the plant machinery will be done in all three shifts. Adequate number of personnel will have to be provided to help in the cleaning and maintenance work of the refrigeration plant along with the loss incurred by the organization. Page Unskilled workers will also be hired as per requirement. After getting the ammonia and air pressure vessels of refrigeration tested from an authorized engineer, certificates will have to be obtained on time and submitted to the institution. The expenses incurred in obtaining these will have to be paid by the institution after providing the original bills in the office. It is necessary for the bidder to have minimum 05 years of experience in the related work. To get the above work done, minimum 04 skilled and 04 semi-skilled workers are available daily. Note - Refrigeration plant operation will have to be done by trained/knowledgeable/experienced workers in shifts. Wrong operation will result in This will be unnecessarily incurred in plant breakdown or in the bills of the concerned contractor. Have to pay attention. Will have to be done. Compensation for the loss incurred by the organization due to breakdown of machinery. Maintenance/repairing work of 02 butter packing machines and butter churn of the organization. For this work, diploma holder (skilled labor) and minimum 5th degree in the field related to machinery will be required. The work should be done by experienced personnel. Minimum 01 operator (skilled labor) will have to be provided for maintenance of the work place and the machine will have to be maintained as per the standards. Work Saints. In case of non-appearance, a financial penalty of Rs 2,5000.00 will be imposed along with the loss caused to the organization. The tenderer must have 02-05 years of experience in butter packing machine operation and maintenance work. If the butter machine is not packed in a month, then payment for that month will not be payable. Wrong operation can lead to plant breakdown or machinery damage. The loss incurred by the organization will be compensated from the monthly bills of the concerned contractor. It will be necessary to attach the experience certificate. Is. C.A.P. Work Goop Repair and Maintenance. Motor rehinder electrical. Work of mechanical, fitter, instrumentation and welder:- Under the above mentioned works, the CIP Center will have to be run smoothly. Repairing of plant and machinery in every section of the factory (except Gutter Packing Machine and Refrigeration) through workshop and their oil and grease. Bearing wear. Hour hauling of dairy machines. Completing upcoming break down and maintenance work. Will have to open, close the gear box and do all the mechanical work of the plant. In electrical work, repair and maintenance of power substation (11 KV) panel and 440 volt motor starter lighting. Moving the motor from one place to another and any breakdowns and preventive maintenance occurring at time 2 will have to be done immediately and also the tasks assigned by the organization will have to be completed at time 2. To complete all these works, sufficient number of experienced electricians are deployed daily per shift as per requirement. By providing motor rebinder instrument mechanic, fitter and welder (ITI/Diploma) and unskilled labor (helper), the maintenance/repairing/welding/cleaning work of the plant and machinery installed in the institution will have to be done as per the instructions of the Engineer-in-charge. Along with non-fulfillment of work and loss caused to the organization, a minimum penalty of Rs. 5000/- will be imposed and deducted from the bill of the concerned tenderer. The loss incurred by the organization due to breakdown or malfunction of machinery will be compensated from the monthly bills of the concerned contractor. To carry out the above work, 11 skilled (04 electrical, 04 mechanical/fitter, 01 instrumentation, 01 motor welder and 01 welder) and 06 unskilled labor will have to be provided at least daily. Those who have 05-10 years of experience in related work and the bidder must have minimum 05 years of experience in related work. Plant due to wrong operation Boiler and air deaerator operation/repair/maintenance work and coal feeding work: (Unless the boiler runs on PNG gas) a. In the work of running boiler/air deaerator, cleaning of boiler/deaerator, repairing and break down on time-2, attending maintenance. Unloading the tanker of furnace oil and running the tube, cleaning the boiler/air deaerator and RFO area, repairing steam line and valve etc. Boiler/air deaerator operation work should be done by skilled personnel with minimum 05 years of experience and the work of boiler attendant should be done only by experienced persons having boiler attendant certificate. Other work will be done by unskilled workers. Along with the above works, 2 water softeners will have to be charged and the water quality section will be tested regularly and records will have to be maintained. To complete all the above works, adequate number of personnel will have to be made available on daily basis as per the requirement as per the instructions of the Engineer-in-charge. Boiler Inspection, Explosive Fire NOC and Plastic Waste Certificate will be obtained from the concerned department at the stipulated time. The amount to be deposited in the institution will be paid by the institution after providing the original copy of it. The tenderer is required to have 10 years of experience in getting the above work done in the cooperative institution. For this, 04 skilled and 04 unskilled workers will have to be provided daily and in case of running of air deaerator, 03 skilled and 03 unskilled workers will have to be provided. Along with non-compliance of work standards and non-performance and loss caused to the organization, a minimum financial penalty of Rs. 5000/- will be deducted from the bill of the concerned tenderer. B. To load coal into the boiler, as per the instructions of Engineer-in-charge, sufficient number of unskilled laborers will have to work shift wise and the coal truck will have to be emptied and the boiler will have to be filled. The ashes coming out will have to be transported to a designated place. Also, cleanliness of the work place will have to be maintained. For the work of dumping coal, the work will have to be done by providing 02 unskilled laborers on daily basis. The loss incurred by the organization due to plant breakdown or machinery failure due to wrong operation will be compensated from the monthly bills of the concerned contractor. Along with non-fulfillment of work and loss caused to the organization, a minimum penalty of Rs. 5000/- will be imposed and deducted from the bill of the concerned tenderer. to look for coal for PNG gas Packing of milk powder by dosing nitrogen in 3 to 5 gram and 200, 400, 500, 750 and 1000 gram packs from 25 kg powder bag using Naicon machine and machine operation/maintenance/repair work is also included in this work:- During the above work, while packing the Pratipali powder, bring the bags of powder and packing material like polyfilm, corrugated box etc. from the store from the godown to the machine, open the bags and put them in the hopper of the machine and keep the empty bags and liners safe at the directed place. Correct weighing of packets, correct coding, careful packing and wastage of polyfilm should remain as per standards/minimum. After cleaning and counting the packed powder pouches/packets, filling them carefully in corrugated boxes, writing its net weight, packing date, and code number etc. on the corrugated box and closing the corrugated box by applying pollen tape and keeping it safe at the place designated by the store. Keeping the gas cylinder at a safe place, removing the filled cylinder from the vehicle and loading the empty cylinder into the respective vehicle. During the packing work, cleanliness of the packing site should be maintained at a high level and the machine operation/maintenance/repair work will be done only by experienced and diploma holder skilled workers of Naikon machines. A copy of the experience certificate of skilled workers will have to be submitted to the institution. The contractor will be fully responsible for any kind of mishap/loss during the replacement work. In case of any kind of carelessness in the work and not successfully completing the work on time, along with compensation, a penalty of Rs 2,50,5000.00 to Rs 10000.00 will be imposed. If any complaint comes from any organization or any other place after the supply of goods, it will be the responsibility of the contractor. In case of complaint of underweight or finding of underweight packer, a penalty of 20 times the price will be imposed. Apart from this, if any penalty is imposed on the organization in case of underweight pouches/packets being found by the external agency, then the same will be compensated in the monthly bills of the contractor. Will be done from. To carry out the above work, 02 skilled workers (with Dairy Diploma/ITI Mechanical) and minimum 08 unskilled workers will have to be provided per shift or as per requirement. To get the above work done, the tenderer is required to have minimum 05 years experience in operation and repair maintenance of Niken machine. The loss incurred by the organization due to plant breakdown or machinery malfunction due to wrong operation will be compensated from the monthly bills of the concerned contractor. . Various civil repair related works of the organization 1.Masons work 2. Work of Beldar/Helper Operation of 30TP (Educational Discharge Mechanism). Under the above work, to operate ETP daily in all three shifts as per online maintaining standard and maintain all related records shift wise. Cleaning of ETP area, ETP machinery maintenance/repairing work and getting the purified water samples tested from the authorized agency on monthly basis and submitting the test report to the organization and related to water and air pollution from Uttar Pradesh Pollution Control Board, Lucknow. Involves the work of obtaining No Objection/Consent Certificate and presenting it to the institution. The amount deposited for obtaining the said certificate will be paid by the organization after the tenderer submits the original challan. If any kind of delay/irregularity is found in the said work, financial penalty will be imposed as per the rules and conditions mentioned in the tender form. For this work, the contractor will have to provide authorized certified personnel/trained personnel. For this, the contractor himself will coordinate and ensure the execution/getting of the works done. The tenderer should also be authorized by the Uttar Pradesh Pollution Control Board. For the above works, the work will have to be done by providing 03 skilled and 03 semi-skilled laborers daily and from time to time laborers will be provided as per the need for maintenance and break down. Will have to be made available. If any fine is imposed on the institution by the Uttar Pradesh Pollution Control Board for not getting the ETP works done on time and for not obtaining the no-objection/consent certificate related to water and air pollution and not submitting the no-objection/consent certificate related to water and air pollution to the institution on time. If any penalty is imposed, it will be compensated from your bills and if any deficiency is found during the surprise inspection of the ETP plant by the Uttar Pradesh Pollution Board, then that too will be deducted from your bills. It will be mandatory to attach experience certificate of related work. The loss caused to the organization due to plant breakdown or machinery failure due to wrong operation will be compensated from the bills of the concerned contractor. Function of Traffic Section: The work of driving the light four wheeler of the organization by a skilled driver (holder of light motor vehicle license). working group 2h Gardening and sanitation work: Cutting and trimming of all lawns and hedges in the institution. Cleaning, maintenance of pots, planting and watering seasonal flower plants etc. Cleaning of the boundary wall area of ​​the dairy complex. P&I. Area of ​​administrative building. Drain of ETP plant area. Cleaning of weeds. Engg. Section. All the weeds in the powder plant store and godown areas. Cleaning work. Adequate number of workers will be made available for this work. Cleaning of all the rooms and cow sheds of the cow shed and administrative building built in the factory, cleaning of drains and gutters. Cleaning of warehouses and cleaning of roads in the premises etc. (Necessary chemicals/detergents and other items will be provided by the organization) All the above work will be done by providing adequate number of workers. In case of non-availability of parents and non-maintenance of hygiene, a financial penalty of Rs. 10000/- will be imposed, which will be adjusted from the monthly bills of the contractor. Minimum of 07 cleaning workers for sanitation works and 07 workers for gardening works. Will have to be made available. For daily maintenance and cleaning/hygiene maintenance of all the toilets in the factory premises, a separate worker will have to be deployed who will constantly monitor and clean the toilets. Will maintain hygiene. Work of driving away animals etc. (unskilled) in the morning and evening Working Group 2 I Loading, unloading and shifting work: Unloading the goods from the vehicle and keeping them in the warehouses on the ground floor and first floor. Take out the goods from these warehouses and keep them in the vehicle. (1) 01 kg to 25 kg pieces (2) 26 kg to 50 kg pieces (3) Shifting of 15/20 kg butter box/other items from production section to cold store/deep freeze and transporting it from cold store and dip freeze to production. Work (4) Shifting of powder bang from warehouses on ground floor or first floor to the production section. Page (5) Loading and unloading work from the first floor and ground floor warehouses to the powder bank old powder warehouse in the vehicle of the organization. (6) Unloading new empty plastic cans/cans and keeping them in the warehouse. (7) Shifting of boxes of milk products from the main storage warehouse to the milk parlor located at Maingate. (8) The work of loading 20/25 kg packing powder bags from the ground floor and first floor warehouse into the vehicle and bringing 20 kg butter boxes/25 kg powder bags from the warehouse to the tanker. The act of loading in. (9) Shifting work of 25 kg SMP bag and 10 to 20 kg butter/ghee from one place to another in the warehouse and 10/20 kg box in D phase from one D phase to another D phase inside/outside packing material. (10) Cleaning of all nets in packing material store, P&I store, poly film store etc., cleaning of cold store de-phase and powder warehouse and maintaining hygiene will have to be done on high priority. If dirty and unhygienic conditions are found, a penalty of Rs 5000/- will be imposed, which will be compensated from your monthly bills. Working Group 2J For various job work tasks in administration and other sections. 1. At least 10 years work experience in the relevant field for steno work (minimum qualification is graduation). : Salary will be determined by the institution.} { Note 2. Office Assistant (Skilled) 05 years experience qualification graduate Proficiency in Hindi typing, English typing, and Word, Excel, Power Point work. Speed ​​Hindi 40 words per minute English 40 words per minute Salary will be determined by the institution.} { Note : 3. For Office Attendant work (minimum qualification 10th pass): Salary will be determined by the institution.} { Note 4. Field Supervisor/Marketing Supervisor 05 Experience Qualification: Minimum Graduation (Additional Qualification Work Experience) Salary will be determined by the institution.} { Note : { { 5. Tele work (work related to accounts and finance section) 05 experience BCA/MCA/Advanced course related to computer/Diploma in Tally along with proficiency in computer work like Word, Excel and Power Point. Note: Salary will be determined by the institution.} 6. Electrical, Mechanical, Fitter Instu Mansion, Boiler Operator Motor Rebinder Refrigeration Mechanic, Welder Work Qualification: ITI/Diploma/Proficiency (Minimum work experience 05+f) Note: Salary will be determined by the institution.} 7. Lab Chemist, Lab Assistant, Testing/Mycobiology of Milk and Milk Products. Page 6 Qualification: B.Sc.MSc.Chemistry/Food Science/Dairy Science/B.Tech,Biotech/MSc.Mycobiology/Skill Competency ({Note: Salary will be determined by the institution.} 8. Dairy Supervisor Qualification:- B.Sc/MSc/Diploma/Minimum 05 years of work experience. Note: Salary will be determined by the institution.} From time to time, in case of excess of job work, providing additional number of workers as per requirement. (a) To provide skilled labor (b) To provide semi-skilled workers (c) To provide unskilled labor Minimum Experience 05.

Key Value

Document Fees
INR 11800 /-
EMD
INR 1000000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail