}

Tender For Provision Of Installation Of Lift Along With Comprehensive Maintenance Under Ge(N)Patiala, patiala-Punjab

Military Engineer Services has published Tender For Provision Of Installation Of Lift Along With Comprehensive Maintenance Under Ge(N)Patiala. Submission Date for this Tender is 12-09-2024. Footwears Tenders in patiala Punjab. Bidders can get complete Tender details and download the document.




Tender Notice

44191127
Corrigendum : Tender For Provision Of Installation Of Lift Along With Comprehensive Maintenance Under Ge(N)Patiala
Open Tender
Indian
Punjab
Patiala
12-09-2024

Tender Details

Tender For Provision Of Installation Of Lift Along With Comprehensive Maintenance Under Ge(N)Patiala; 1 Design, supply, install, testing & commissioning passanger lift, speed 1.0 metre/sec with single speed motor, 415 volts, 3 phase AC 50 Hz supply, conforming to IS-14665 and as amended up to date, suitable to serve -(1).suitable for G+03, travel height 10.8 meter, no of stops 4(G,1,2,3)(2).suitable for 544kg/08 PASSENGERS(3).dimensions:- head room-4500mm,pit depth-1400, shaft dimension-1580 mm X 1800mm, car dimension (1100mmX1300mmX2100mm, WxDxH), CAR DOOR SIZE- 800mmX2000mm. (4). car door type-Door left opening, 2 panels. (DOOR TYPE-Fermator compact). (5).Landing door fire protection classification- EN-81-58 E120.(6). DRIVE POWER 3.7 KW (7) No of trips per hr-120(8).Installation method Scaffoldless with hoisting device. with AC Variable Voltage & Variable Frequency Drive (VVVF drive) complete with all standard accessories, simplex automatic & manual dual controlled operation with/ without attendant,sliding stainless steel doors, automatic rescue device (ARD) system, 3D infra red sensor in full height of door & built in announcing system without hand set (03 Nos, one each in car, Machine room & near Ground floor landing door) complete all as specified. Note:- (1) Groups I of list of makes shall be followed(2) Pre- commissioning test shall be carried out by rep of Accepting Officer(3) Pre- commissioning test by “LIFT INSPECTOR” of state government as per policy shall be carried out quoted rates are deemed to be included in thequoted rates (4) Any maintenance/replacement of any items during 02 years of defect liability period will be borne by the contractor. (5) The cost of A.R.D unit with suitable maintenance free dry batteries should be deemed to be included in unit rate for passenger lift quoted by the contractor. 2 Supply and fixing for sub main wiring Four single core PVC insulatedand unsheathed cable with 10 Sqmm multi -strand copper conductor drawing in steel concealed conduit of 25mm dia with 10 Sqmmsingle core PVC copper conductor cable as in earth wire system, including taking out old wiringcomplete all as directed. Note 1:Chasing and cementing work included in quoted rates Note 2 : four runs of 10 sqmm cable alongwith single run of 10 Sqmm PVC insulated unsheathedcopper conductor as earth wire, conduitand conduit accessories will be measured as one length). 3 Earthing complete with copper earth plate electrode, 600x600 x 3.15mm thick burieddirectly in ground (earthpit not less than 2.25m deep below normal level) connectedto20x3mm copper strip by means of nuts, bolts, &washers of GI as shownin electrical plate No 3 of SSR PartI.Connected to earthing test pointtesting complete including necessary earth pit chamber PCC 1: 3: 6 type C1, and 50mm thick RCC 1 : 2: 4 chamber cover and with 8mm dia mild steel re-enforcementof 15 cm c/c spacing both ways with a handle made of 8 mm bar for lifting, galvanised iron funnel, wire mash watering pipe GI 20 mm dia light grade, and protection to earth leadshall be providedwith GI pipe light grade 25 mm dia up to 7.5m from the earth plate electrode, excavation, charcoal and common salt mixed refilling of soil etc complete all as directed. 4 Supply & Fix of copper strip of size 20 x 3 mm on PVC/ porcelain insulator at suitable distance with saddles and fixing screw etc for roof/ Wall conductors and down conductors above ground all joints of copper strip should be brazed properly complete all as specified and directed. 5 Supply & FixMCCB , TPN, 240 Volt, 125amp with suitable size metal encloser including proper thimble connections complete all as specified and directed. (Note: MCCB should be B or C curve as directed by engineer in charge) 6 Comprehensive maintenance of lift installed under this CA in reliable safe and efficient operating condition through MOU with OEM by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + 3 floors (total four landings) with electric power operated doors, auto electric levelling device installed complete all type of mechanical and electrical items, governor sleeve, gears, gear shaft assembly, bearings, brake contact, brake shoe liner, brake magnets, governor jaws, sheave or main rope, trailing cable, speed governor rope, all type of electric motors, car & hall mechanical buttons, car & hall position indicators, car direction indicators and ali other car and landing signal / fixtures, deflectors, car and counter weight guide rails and buffers, wire, lugs, nut, bolts, screws, hand rails, light luminaries, ventilating fan, hooter, lubricant, gear oil, aircord, rollers, landing wheel, aircord wheel, rubber bush, rail guide shoe, infra red door sensors, automatic door operating system, travelling cables, ARD, SMF batteries, car doors, landing gates, door cills, intercom system, CVT, all types of control panel PCBs, transducers, transformers, rectifires, phase sequence corrector & single phase preventer, relays & cards etc and all machine works i.e. welding, cutting, drilling etc as and when required incl sunday and holidays, during 1st year after completion of defect liability period, complete all as directed to entire satisfaction of Engineer-in-chargeComprehensive, preventive, periodical maintenance after completion of defects liability period and attending day to day complaints for smooth functioning of lifts/elevators (01 No) installed at 660 Air Op mentioned here-in-under:-Note :- (i) Comprehensive maintenance will start only after completion of 02 years of defect liability period, complete all as directed to entire satisfaction of Engineer-in-charge. (ii) Any maintenance/replacement of any items during 02 years of defect liability period will be borne by the contractor 7 All as per Item No 06 here-in-before but during 2nd year after completion of defect liability period of two years, complete all as directed to entire satisfaction of Engineer-in-charge 8 All as per Item No 06 here-in-before but during 3rd year after completion of defect liability period of two years, complete all as directed to entire satisfaction of Engineer-in-charge Note for item Nos 6 to 8 : - (Comprehensive maintenance) (i) The above maintenance shall be done through OEM of existing lifts. Please also refer Sch A notes. (ii)The contractor will have to submit MOU as given in particular specifications from OEM of Lift within three days of acceptance of tender, failing which the contract will be liable to be cancelled and further action to be taken as per policy in vogue. (iii) Contractor will conclude AMC with OEM (Lift/ elevator manufacturer) of existing Lifts and copy of the agreement and along with invoice copy will be submitted to Engineer-in Charge and GE before commencement of AMC. No payment will be made to contractor without submission of valid AMC. (iv) The above maintenance include complete maintenance of existing lift by regularly and systematically examining adjusting fabricating as required for smooth and efficient functioning of the equipment/ lift. (v)Scope of AMC shall include repair replacement of machines, motors,generator door ropes, inverter/ ARD system, PCBs belt rollers, gears, bearing, coil chock, break shoe, relay coil pushbutors door operating system etcFollowing items are not included: Replacement of car cabin, ceiling frames, panels, hoist way door panels, door frames, cills, car flooring, floor covering, lighting fixtures, celling light bulbs and tube, main line power switches, breakers, feeders to controller, hoist way wiring, hydraulic jack outer casing, burried piping. alignment of elevator guide rails,smoke and fire sensors, communication devices, security systems, landing doors,sheave rim,hoist rope & ARD battery and cabin fans. (vii) The OEM will also detail one technical staff to inspect the litt every week, regarding its functioning operation or any other issue arising in the lift. The problem noticed if any to be addressed immidately in case no technician is detailed, penality as described in subsequent clauseswill be deducted from the payment. Technician shall always carry service tool along with him during each weekly visit. (vili) Contractor to note that monthly service will not be paid for the building undergoing special repairs/ unoccupied buildings and no penalty shall be imposed upon contractor all as per direction of Engr-in-Charge. (ix) All existing earthing of the lits shall be maintained and made fully functional by the contractor to the entire satisfaction all as specified and directed

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 05-09-2024 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 12-09-2024
2 30-08-2024 Due Date Extended for tenders closing on 05-08-2024 Admin Corrigendum Date Extend 05-09-2024

Key Value

Document Fees
INR 500 /-
EMD
INR 47380.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail