|
| 1 | Constr. of three modules of SR-2 |
| 2 | Earthwork in Soil : Not Exceed 2 m |
| 3 | Earthwork in Soil depth from 2 m to 4 m |
| 4 | Earthwork in Soil depth from 4 m to 6 m |
| 5 | Earthwork in Soft Rock depth not Exceedi |
| 6 | Earthwork in Soft Rock depth 2m to 4 m |
| 7 | Earthwork in Soft Rock depth 4 m to 6 |
| 8 | Earthwork in Hard Rock depth not Exceedi |
| 9 | Earthwork in Hard Rock depth 2 m to 4 |
| 10 | Earthwork in Hard Rock depth 4 m to 6 |
| 11 | Earthwork in Backfilling : 90 % MDD |
| 12 | Earthwork in Backfilling : 90 % MDD as |
| 13 | Carriage for stacking/ backfilling-1km |
| 14 | Carriage for disposal of serviceable/uns |
| 15 | M7.5 Providing at Batching Plant |
| 16 | M 7.5 Transporatation to site and Pouri |
| 17 | M 10 : Providing at Batching Plant |
| 18 | M 10:Transporatation to site and Pourin |
| 19 | M 25 Design Mix in Fdn:Prov at Batching |
| 20 | M 25 Design Mix in Fdn:Transporat. to s |
| 21 | M 25 Design Mix in Super Struct : Provi |
| 22 | M 25 Design Mix in Super Struct: Transp |
| 23 | Formwork below finished ground level |
| 24 | Formwork abovefinished ground level |
| 25 | Formwork in pocket: Upto 150 mm depth |
| 26 | Formwork in pocket: 150 mm to 300 mm |
| 27 | Formwork in pocket: 300 mm to 600 mm |
| 28 | Formwork in pocket: 600 mm to 1000 mm |
| 29 | Steel Reinforcement work as per BoQ |
| 30 | Bitumen impregnated fibre board:12 mm wi |
| 31 | Bitumen impregnated fibre board:20 mm wi |
| 32 | Bitumen impregnated fibre board:25 mm wi |
| 33 | Bitumen impregnated fibre board:50 mm wi |
| 34 | Supply and fixing MSEmbedment |
| 35 | Supply and fixing MSFoundation Bolt |
| 36 | MS Embedment ( BHEL Supplied) |
| 37 | MS Fdn Bolts ( BHEL Supplied) |
| 38 | Prov & Fix 63 mm to 45 mmin paving |
| 39 | Prov and Fix weep holes of 100 mm HDPE |