Bids Are Invited For Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Removal of back pull out assembly and installation of spare Back Pull out assembly of Pump for details refer BOQ item No 1 in SOW and 01 quantity is equ.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Decoupling Alignment and coupling of pump and motor having motor rating up to 60 KWe for details refer BOQ item No 2 in SOW and 01 quantity is equal to .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Overhauling of motor of rating from 30 KWe to 60 KWe for details refer BOQ item No 3 in SOW and 01 quantity is equal to 1 Nos; As per SOW and ATC , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Overhauling of Manual operated Valve .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Maintenance of actuator of control valve having diaphragm for details refer BOQ item No 5 in SOW and 01 quantity is equal to 4 Nos; As per SOW and ATC , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Primary Circulating pump dismantling maintenance assembly test run for details refer BOQ item No 6 in SOW and 01 quantity is equal to 1 Nos; As per SOW.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Opening and box up of Shutdown cooling heat exchanger Moderator Heat exchanger for details refer BOQ item No 7 in SOW and 01 quantity is equal to 2 Nos.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Opening and box up of both primary sides of one Steam generator for ISI for details refer BOQ item No 8 in SOW and 01 quantity is equal to 1 Nos; As per.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Removal and installation of secondary side handhole covers of steam generator for ISI water jet cleaning for details refer BOQ item No 9 in SOW and 01 .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Primary Circulating Pump Thrust bearing overhauling for details refer BOQ item No 10 in SOW and 01 quantity is equal to 1 Nos; As per SOW and ATC , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Preventive Maintenance Checks of Primary circulating Pump PCP and its Motorfor details refer BOQ item No 11 in SOW and 01 quantity is equal to 2 Nos; As.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Overhauling of Electrical actuator operated Piston type air actuator operated valve for details refer BOQ item No12 in SOW and 01 quantity is equal to 8.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Guide Nut inspection of Emergency core cooling system Shut down cooling Size 8 inch to 12 inchfor details refer BOQ item No 13 in SOW and 01 quantity i.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Preventive Maintenance Checks of Emergency core cooling system Shut down cooling for details refer BOQ item No 14 in SOW and 01 quantity is equal to 16.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Overhauling of control valve with valve size up to 6 inches for details refer BOQ item No 15 in SOW and 01 quantity is equal to 4 Nos; As per SOW and AT.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Overhauling of motor with electrical rating from 65 KWe to 400 KWe for details refer BOQ item No 16 in SOW and 01 quantity is equal to 1 Nos; As per SOW.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Preventive Maintenance checks of Primary Pressurizing Pumpfor details refer BOQ item No 17 in SOW and 01 quantity is equal to 1 Nos; As per SOW and ATC , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Replacement of door seals of Reactor Building Main Air lock Equipment doorfor details refer BOQ item No 18 in SOW and 01 quantity is equal to 3 Nos; As .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Moderator pump replacement for details refer BOQ item No 19 in SOW and 01 quantity is equal to 1 Nos; As per SOW and ATC , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Preventive Maintenance Checks of manual bellow sealed valvefor details refer BOQ item No 20 in SOW and 01 quantity is equal to 50 Nos; As per SOW and AT.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Diaphragm replacement of diaphragm valve for details refer BOQ item No 21 in SOW and 01 quantity is equal to 80 Nos; As per SOW and ATC , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Replacement or cleaning of Strainer Filter for details refer BOQ item No 22 in SOW and 01 quantity is equal to 25 Inch Dia; As per SOW and ATC , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Replacement of Relief valve for details refer BOQ item No 23 in SOW and 01 quantity is equal to 8 Nos; As per SOW and ATC , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Flange gasket replacement and tightening for details refer BOQ item No 24 in SOW and 01 quantity is equal to 80 Inch Dia; As per SOW and ATC , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Flange threaded joint tightening for details refer BOQ item No 25 in SOW and 01 quantity is equal to 40 Inch Dia; As per SOW and ATC , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Removal of Snubber for testing and installation after testing for details refer BOQ item No 26 in SOW and 01 quantity is equal to 14 Nos; As per SOW and.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Replacement Maintenance of Primary circulating pumps Motor having rating 2800 KWfor details refer BOQ item No 27 in SOW and 01 quantity is equal to 1 N.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Overhauling of spare back pull out assembly of Oil supply unit for details refer BOQ item No 28 in SOW and 01 quantity is equal to 3 Nos; As per SOW and.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Replacement of lobe type blower for details refer BOQ item No 29 in SOW and 01 quantity is equal to 2 Nos; As per SOW and ATC , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Feeder Gap Measurementfor details refer BOQ item No 30 in SOW and 01 quantity is equal to 25 Nos; As per SOW and ATC , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Manual axial creep measurement adjustment for details refer BOQ item No 31 in SOW and 01 quantity is equal to 50 Nos; As per SOW and ATC , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Removal and installation of Zig saw panel for details refer BOQ item No 32 in SOW and 01 quantity is equal to 250 Nos; As per SOW and ATC , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Removal and Installation of Step panel insulation panel for details refer BOQ item No 33 in SOW and 01 quantity is equal to 6 Nos; As per SOW and ATC , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Coolant Channel Repositioningfor details refer BOQ item No 34 in SOW and 01 quantity is equal to 2 Nos; As per SOW and ATC , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; PSS drive lower chamber O ring replacement for details refer BOQ item No 35 in SOW and 01 quantity is equal to 16 Nos; As per SOW and ATC , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; PSS drive upper chamber replacement for details refer BOQ item No 36 in SOW and 01 quantity is equal to 4 Nos; As per SOW and ATC , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Mock up and Preparatory activities for Cobalt element replacement job for details refer BOQ item No 37 in SOW and 01 quantity is equal to 1 Nos; As per .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Adjuster rod element replacement in reactivity mechanism drivesfor details refer BOQ item No 38 in SOW and 01 quantity is equal to 6 Nos; As per SOW and.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; Replacement of MALEALvacuum pump OR Vacuum mopping pump for details refer BOQ item No 39 in SOW and 01 quantity is equal to 2 Nos; As per SOW and ATC , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - RR Site 5 and 6; ECCS Plate type Heat exchanger maintenance for details refer BOQ item No 40 in SOW and 01 quantity is equal to 1 Nos; As per SOW and ATC Total Quantity :