}

Tender For Running Contract Of Full Deposit Work Under Edd Khatauli, Running Contract For Carrying Out The Works Related To The Full Deposit Scheme Approved In The Financial Year 2024-25 In The Jurisdiction Of Electricity Distribution Sub-Division-Khataul, khatauli-Uttar Pradesh

Government Departments has published Tender For Running Contract Of Full Deposit Work Under Edd Khatauli, Running Contract For Carrying Out The Works Related To The Full Deposit Scheme Approved In The Financial Year 2024-25 In The Jurisdiction Of Electricity Distribution Sub-Division-Khataul. Submission Date for this Tender is 15-07-2024. Electrification Work Tenders in khatauli Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

44120643
Tender For Running Contract Of Full Deposit Work Under Edd Khatauli, Running Contract For Carrying Out The Works Related To The Full Deposit Scheme Approved In The Financial Year 2024-25 In The Jurisdiction Of Electricity Distribution Sub-Division-Khataul
Open Tender
Indian
Uttar Pradesh
Khatauli
15-07-2024

Tender Details

tender for Running Contract Of Full Deposit Work Under Edd Khatauli, Running contract for carrying out the works related to the full deposit scheme approved in the financial year 2024-25 in the jurisdiction of Electricity Distribution Sub-division-Khatauli Town under Electricity Distribution Division, Khatauli, The work of delivering material from the electrical storage center to the junior engineer store/site which includes loading and unloading on both sides. (Distance 0 to 50 km) STP Pole 11 m. ST.P Pole 13 m. P.C.C. Pole 8.5 m. P.C.C. Pole 9.00 m. Line material insulator disc wire cos aam. Arthiroad etc. 25 KVA converter 63 KVA converter 100 KVA converter 250 KVA converter C.T.P.T. unit meter cubicle As per rules, work of making plinth to house 250 KVA transformer. (All material for construction will be supplied by the tenderer) As per rules, the work of placing 250 KVA transformer on plinth with heavy duty can. As per rules, HT of 250 KVA transformer. Work to be done as per side connection standards. STP/PCC to make double pole as per standard. The work of erecting a pole. Work of fabricating angle and channel for double pole as per standard, Work of tying fabricated angle and channel on double pole as per standard. Work of installing other line material on double pole as per standard. Installation of 100/63/25 KVA converter on double pole as per standard through heavy duty CAN. As per rules, HT of 250/100/63/25 KVA converter. Work to be done as per side connection standards. As per rules, LT of 250/100/63/25 KVA transformer. Work to be done as per side connection standards. As per rules, after placing the 250 KVA transformer, for the safety of the transformer, the work of water level earthing of neutral and body as per the site will be done (the material for earthing will be provided by the tenderer). As per rules, work of earthing for meter cubicle (The material for earthing will be provided by the tenderer). As per rules, work of wiremans fencing for human safety of 250 KVA transformer (the material used for fencing will be provided by the tenderer). As per rules, work of painting the wiremans fencing to protect it from rust for human safety of 250 KVA transformer. As per rules, after digging the pit, PCC/STP. erect a pole S.T.P. Pole 13 m. S.T.P. Pole 11 m. P.C.C. Pole 9 m. P.C.C. Pole 8.5 m., The work of installing the cos arm on the installed pole. The work of tying insulators on installed poles. The work of stretching and sagging the wire as per rules. dog conductor Rabbit Conductor weasel conductor ABC conductor As per STP/PCC rules. To carry out complete work of rooting of polo (the material used in rooting will be checked by the tenderer) Complete work of installing stay set as per rules The work of knotting the staset as per rules. Complete work of laying earth road as per rules As per rules, CTPT is on double pole. Complete work of energizing the unit after loading As per rules, complete work of energizing meter cubicle room by installing meter cubicle. Complete work of making and taping section pole as per rules. Cutting and pruning work of trees coming in the middle of the line. As per rules 11 KV. XLP Work of making trench for cable and laying the cable and then closing it as per rules. As per rules 11 KV. XLP Work related to connecting cables while installing overhead cables., As per rules 11 KV. Complete die work providing cable box. As per rules 11 KV. The work of dying the departmental cable box. As per rules HT. Work of installing danger board on the line. As per rules HT. Work of installing barbed wire on the line. As per rules 33 KV/11 KV. Complete work related to dismantling the electric line, untying the electric wire from the pole, making a bundle and delivering it to the departmental store. As per rules 33 KV/11 KV. The work of uprooting the electric pole for dismantling the electric line and transporting it safely to the departmental store. S.T.P. pole P.C.C. pole As per rules, dismantling of double pole and power transformer. C.T.P.T. Work related to delivery of units and other line materials to departmental stores. As per rules, work related to dismantling of section pole and delivery of line material to departmental store. LT from pole/double pole to converter. The act of establishing lead. Materials provided by flood agency. different sized clamps LT insulator, Nut bolts Cable Jointing Kit 3x70sq.mm Cable Jointing Kit 3x120/185sq.mm Aluminum Lugs (Size as required)

Key Value

Document Fees
INR 1180 /-
EMD
INR 2000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail