| 1 | Poles:Unloading of Steel Tubular Pole / Precast Cement Concrete Poles by Manual/Mechanical means and Verification |
| 2 | S.T.Poles 8 mtr |
| 3 | S.T.Poles 9 mtr |
| 4 | S.T.Poles 11 mtr |
| 5 | S.T.Poles 13 mtr |
| 6 | P.C.C. Pole 8 Mtr |
| 7 | P.C.C. Pole 9 Mtr |
| 8 | Poles: Dragging of the Steel Tubular Pole/Pre Cost Cement concrete Pole from Unloading Site to Stacking Site and Stacking |
| 9 | S.T.Poles 8 mtr |
| 10 | S.T.Poles 9 mtr |
| 11 | S.T.Poles 11 mtr |
| 12 | S.T.Poles 13 mtr |
| 13 | P.C.C. Pole 8 Mtr |
| 14 | P.C.C. Pole 9 Mtr |
| 15 | Poles: Carriage / Shifting of ST Poles Tubular Pole / Precast Cement Concrete Poles by Manual/Mechanical means from Stacking Site to Loading Site |
| 16 | S.T.Poles 8 mtr |
| 17 | S.T.Poles 9 mtr |
| 18 | S.T.Poles 11 mtr |
| 19 | S.T.Poles 13 mtr |
| 20 | P.C.C. Pole 8 Mtr |
| 21 | P.C.C. Pole 9 Mtr |
| 22 | Poles: Loading of ST Pole/ Precast Cement Concrete Poles by Manual/Mechanical means |
| 23 | S.T.Poles 8 mtr |
| 24 | S.T.Poles 9 mtr |
| 25 | S.T.Poles 11 mtr |
| 26 | S.T.Poles 13 mtr |
| 27 | P.C.C. Pole 8 Mtr |
| 28 | P.C.C. Pole 9 Mtr |
| 29 | Conductor:Unloading of ACSR Conductor by Manual/Mechanical means and Verification |
| 30 | ACSR 0.02Cond. (Squirrel) |
| 31 | ACSR 0.03 Cond.(Weasel) |
| 32 | ACSR 0.05 Cond (Rabbit) |
| 33 | ACSR 0.1 Cond.(Dog) |
| 34 | Conductor:Carriage / Shifting ofACSR Conductor from Un Loading Site to Stacking Site andStacking properly |
| 35 | ACSR 0.02Cond. (Squirrel) |
| 36 | ACSR 0.03 Cond.(Weasel) |
| 37 | ACSR 0.05 Cond (Rabbit) |
| 38 | ACSR 0.1 Cond.(Dog) |
| 39 | Conductor: Carriage / Shifting ofACSR Conductor from Storage Site to Loading Site. |
| 40 | ACSR 0.02Cond. (Squirrel) |
| 41 | ACSR 0.03 Cond.(Weasel) |
| 42 | ACSR 0.05 Cond (Rabbit) |
| 43 | ACSR 0.1 Cond.(Dog) |
| 44 | Un reeling of conductor of various sizes |
| 45 | Conductor: Loading of ACSR Conductor by Manual/Mechanical means |
| 46 | ACSR 0.02Cond. (Squirrel) |
| 47 | ACSR 0.03 Cond.(Weasel) |
| 48 | ACSR 0.05 Cond (Rabbit) |
| 49 | ACSR 0.1 Cond.(Dog) |
| 50 | Transformers: Unloading of Transformers by Manual/Mechanical means and verification |
| 51 | 630 KVA Distrb Transformer |
| 52 | 400 KVA DistrbTransformer |
| 53 | 250KVA Distrb Transformer |
| 54 | 100KVA Distrb Transformer |
| 55 | 63KVA Distrb Transformer |
| 56 | 25- KVA Distrb Transformers |
| 57 | Transformers: Carriage / Shifting ofTransformers from unloadingsite to stacking site and Stacking |
| 58 | 630 KVA Distrb Transformer |
| 59 | 400 KVA DistrbTransformer |
| 60 | 250KVA Distrb Transformer |
| 61 | 100KVA Distrb Transformer |
| 62 | 63KVA Distrb Transformer |
| 63 | 25- KVA Distrb Transformers |
| 64 | Transformers: Carriage ofTransformers from Storage/Stacking Site to Loading Site |
| 65 | 630 KVA Distrb Transformer |
| 66 | 400 KVA DistrbTransformer |
| 67 | 250KVA Distrb Transformer |
| 68 | 100KVA Distrb Transformer |
| 69 | 63KVA Distrb Transformer |
| 70 | 25- KVA Distrb Transformers |
| 71 | Transformers: Loading of Transformer by by Manual/Mechanical means |
| 72 | 630 KVA Distrb Transformer |
| 73 | 400 KVA DistrbTransformer |
| 74 | 250KVA Distrb Transformer |
| 75 | 100KVA Distrb Transformer |
| 76 | 63KVA Distrb Transformer |
| 77 | 25- KVA Distrb Transformers |
| 78 | Unloading of PVC / XLPE / AB Cableby manual/ mechanical means and . Verification |
| 79 | upto 185 Sqmm 1 core PVC Cable |
| 80 | 200 to 300 Sqmm 1 core PVC Cable |
| 81 | 400 to 630 Sqmm 1 core PVC Cable |
| 82 | AB Cable 25 to 70 Sq.mm |
| 83 | AB Cable 90 to 120 Sq.mm |
| 84 | AB Cable 125 to 200 Sq.mm |
| 85 | XLPE Cable 25 to 70 Sq.mm |
| 86 | XLPE Cable 90 to 120 Sq.mm |
| 87 | XLPE Cable 125 to 200 Sq.mm |
| 88 | LT Cable 3C / 3½ C upto 100 mm SQ |
| 89 | LT Cable 3C / 3½ C 101 upto 240 mm SQ |
| 90 | Carriage / Shifting of PVC/XLPE/AB Cable from Unloading Site to Stacking Site and Stacking |
| 91 | upto 185 Sqmm 1 core PVC Cable |
| 92 | 200 to 300 Sqmm 1 core PVC Cable |
| 93 | 400 to 630 Sqmm 1 core PVC Cable |
| 94 | AB Cable 25 to 70 Sq.mm |
| 95 | AB Cable 90 to 120 Sq.mm |
| 96 | AB Cable 125 to 200 Sq.mm |
| 97 | XLPE Cable 25 to 70 Sq.mm |
| 98 | XLPE Cable 90 to 120 Sq.mm |
| 99 | XLPE Cable 125 to 200 Sq.mm |
| 100 | LT Cable 3C / 3½ C upto 100 mm SQ |
| 101 | LT Cable 3C / 3½ C 101 upto 240 mm SQ |
| 102 | Carriage of PVC/XLPE/AB Cable from Storage Site to Loading Site |
| 103 | upto 185 Sqmm 1 core PVC Cable |
| 104 | 200 to 300 Sqmm 1 core PVC Cable |
| 105 | 400 to 630 Sqmm 1 core PVC Cable |
| 106 | AB Cable 25 to 70 Sq.mm |
| 107 | AB Cable 90 to 120 Sq.mm |
| 108 | AB Cable 125 to 200 Sq.mm |
| 109 | XLPE Cable 25 to 70 Sq.mm |
| 110 | XLPE Cable 90 to 120 Sq.mm |
| 111 | XLPE Cable 125 to 200 Sq.mm |
| 112 | LT Cable 3C / 3½ C upto 100 mm SQ |
| 113 | LT Cable 3C / 3½ C 101 upto 240 mm SQ |
| 114 | Loading of PVC /XLPE/AB Cable Bymanual/ mechanical means |
| 115 | upto 185 Sqmm 1 core PVC Cable |
| 116 | 200 to 300 Sqmm 1 core PVC Cable |
| 117 | 400 to 630 Sqmm 1 core PVC Cable |
| 118 | AB Cable 25 to 70 Sq.mm |
| 119 | AB Cable 90 to 120 Sq.mm |
| 120 | AB Cable 125 to 200 Sq.mm |
| 121 | XLPE Cable 25 to 70 Sq.mm |
| 122 | XLPE Cable 90 to 120 Sq.mm |
| 123 | XLPE Cable 125 to 200 Sq.mm |
| 124 | LT Cable 3C / 3½ C upto 100 mm SQ |
| 125 | LT Cable 3C / 3½ C 101 upto 240 mm SQ |
| 126 | OtherMaterials: Unloading of belowmaterials by Manual/Mechanical means and Verification |
| 127 | Transformers Oil Fresh (in barrels of 210 litres) |
| 128 | 11KV Horn Gap Fuse sets / Link sets / LA sets / GO sets |
| 129 | 11 KV Disc Insulators / Pin insulators |
| 130 | Sundry Materials ( cross arms/ Guy rods/ clamps / earthing spikes / Shackle insulators / nuts and bolts / MCB Boxes / Height raiser / braces / fittings / Earth Wire / GI Wire / Guy Wire / Steel of Sorts , MS Channel, MS Angle, MS Flat etc. or any other material. |
| 131 | 10-60 Amp. 1-Phase Energy Meters / 3-Phase Energy Meters |
| 132 | 11 KV CT/PT Units |
| 133 | Cement Bags |
| 134 | Other Materials: Carriage/Shiftingof material from unloading site to stacking site and stacking properly |
| 135 | Transformers Oil Fresh (in barrels of 210 litres) |
| 136 | 11KV Horn Gap Fuse sets / Link sets / LA sets / GO sets |
| 137 | 11 KV Disc Insulators / Pin insulators |
| 138 | Sundry Materials ( cross arms/ Guy rods/ clamps / earthing spikes / Shackle insulators / nuts and bolts / MCB Boxes / Height raiser / braces / fittings / Earth Wire / GI Wire / Guy Wire / Steel of Sorts , MS Channel, MS Angle, MS Flat etc. or any other material. |
| 139 | 10-60 Amp. 1-Phase Energy Meters / 3-Phase Energy Meters |
| 140 | 11 KV CT/PT Units |
| 141 | Cement Bags |
| 142 | Other Materials: Carriage of material fromStacking site to loading site |
| 143 | Transformers Oil Fresh (in barrels of 210 litres) |
| 144 | 11KV Horn Gap Fuse sets / Link sets / LA sets / GO sets |
| 145 | 11 KV Disc Insulators / Pin insulators |
| 146 | Sundry Materials ( cross arms/ Guy rods/ clamps / earthing spikes / Shackle insulators / nuts and bolts / MCB Boxes / Height raiser / braces / fittings / Earth Wire / GI Wire / Guy Wire / Steel of Sorts , MS Channel, MS Angle, MS Flat etc. or any other material. |
| 147 | 10-60 Amp. 1-Phase Energy Meters / 3-Phase Energy Meters |
| 148 | 11 KV CT/PT Units |
| 149 | Cement Bags |
| 150 | Other Materials: Loadingof material from by manual/ mechanical means |
| 151 | Transformers Oil Fresh (in barrels of 210 litres) |
| 152 | 11KV Horn Gap Fuse sets / Link sets / LA sets / GO sets |
| 153 | 11 KV Disc Insulators / Pin insulators |
| 154 | Sundry Materials ( cross arms/ Guy rods/ clamps / earthing spikes / Shackle insulators / nuts and bolts / MCB Boxes / Height raiser / braces / fittings / Earth Wire / GI Wire / Guy Wire / Steel of Sorts , MS Channel, MS Angle, MS Flat etc. or any other material. |
| 155 | 10-60 Amp. 1-Phase Energy Meters / 3-Phase Energy Meters |
| 156 | 11 KV CT/PT Units |
| 157 | Cement Bags |
| 158 | Fabrication work i.e (Fabricationn of channel/angle iron x arms, clamps of sorts, braces of sizes. |
| 159 | Drilling ofholes in M.S iron/Channel for fabrication. |