| 1 | Excavationofpolepitup to27\" (8.0 m) Pole by using JCB or manual |
| 2 | Excavationofpolepit above8mtr pole PSC/RCC/RSJ pole by using JCB or manual |
| 3 | Excavation of Staypit4.5\" to 5\"depthby using JCB or manual |
| 4 | Excavation of pole / stay pit hard rocks requires blasting |
| 5 | Excavation of pole / stay pit hard rocks without blasting (where houses are located ) |
| 6 | Erection of PSC/RCCpoles/Metalpolesupto 8.00m. (27\") by using JCB or manual |
| 7 | Dismantling of PSC/RCCpoles/Metalpolesupto 8.00m. (27\") by using JCB or manual |
| 8 | Erection of PSC/RCC /Metalpoles above 8.0m.(27\") by using JCB or manual |
| 9 | Erection of RSJ/Rail/fabricated/tubular poles above 30\"-0\" (9.0m) by using JCB or manual |
| 10 | Dismantling of RSJ/Rail/fabricated/tubular poles above 30\"-0\" (9.0m) by using JCB or manual |
| 11 | Erectionofstaysetcomplete |
| 12 | Dismantling of stay set |
| 13 | Fixing of HT\"V\" crossarms(all types) / channelcrossarms/guardingCrossarms |
| 14 | Dismantling of \"V\" X arm(all types),channel X arm,guarding X arm |
| 15 | Fixing of LT 3 phasecrossarms |
| 16 | Dismantling of LT 3 phase X arm |
| 17 | Fixing of LT Single phase cross arms |
| 18 | Dismantling of LT single phase X arm |
| 19 | Fixing of HT/LTTIFittings |
| 20 | Dismantling of HT/LT TI fitting |
| 21 | FixingofHTpinInsulators 11 KV |
| 22 | Dismantling of 11 KV/22KV pin insulator |
| 23 | FixingofHT11 KVstraindisc. |
| 24 | Dismantling of 11KV strain disc |
| 25 | FixingofLTpinInsulator |
| 26 | Dismantling of LT pin insulator |
| 27 | FixingofLTshackle |
| 28 | Dismantling of LT shackle |
| 29 | FixingofAluminium Knob |
| 30 | Dismantling of Aluminium knob |
| 31 | Earthing of pole with coil earthing including burying looping and binding |
| 32 | Paving and stringing of ACSR 7/4.09 mmRaccoon conductor |
| 33 | Paving and stringing of ACSR 7/3.35mm /AAAC 3.15mm Rabbitconductor |
| 34 | Paving and stringing of ACSR7/2.59mm /AAAC 2.50 mm weasel and ACSR7/2.11 mm conductor |
| 35 | Sleeveconcreting including materials (Cement + river sand/M-sand and Blue metals and watering) |
| 36 | Guarding arrangement with Flat guarding includng fixing of 2 Nos cross arms |
| 37 | Guarding arrangements for HT Guarding |
| 38 | Transport of Poles/Materials/Conductors and other materials (excluding loading and unloading charges) below 8Km plains.(No return charge) |
| 39 | Transport of Poles/Materials/Conductors and other materials (excluding loading and unloading charges) above 8Kms for additional Km (Irrespective of weight in tonnage). (No return charge) |
| 40 | Loadingofpolesupto8.0 mtr / 27\" |
| 41 | Loadingofmetal poles ( all sizes) |
| 42 | Unloadingofpolesupto8.0 mtr / 27\" |
| 43 | Unloadingofmetal poles ( all sizes) |
| 44 | Transportingofpolesfromroadsite topolepitincludingloadingandunloading ofpoles by using JCB or manualup to 100 m |
| 45 | Transportingofpolesfromroadsite topolepitincludingloadingandunloading ofpoles by using JCB or manual beyond 100 m |
| 46 | LoadingorunloadingofTransformer upto100 KVA |
| 47 | LoadingorunloadingofTransformer above 100 KVA upto 200 KVA |
| 48 | LoadingorunloadingofTransformer above200 KVA |
| 49 | Erection of new transformer for all capacities (with jumpering) |
| 50 | Erection of Street light including fixure fitting |
| 51 | Erection of street light service |
| 52 | Releasing of grills from RCC poles |
| 53 | Releasingofsingle phaseserviceand re-fixing. |
| 54 | Releasingof3 phaseserviceand(upto 50 HP)re-fixing. |
| 55 | Labourchargesforalterationof Back clamps/Stay Clamp tosuitfortheworks |
| 56 | Resagging of HT/LT Line with ACSR 7/3.35 mm/AAAC 7/3.15mm Rabbit conductor |
| 57 | Resagging of HT/LT Line with ACSR 7/2.59 mm/AAAC 7/2.50mm Weasel and ACSR 7/2.11 mm conductor |
| 58 | Providing LT bus bar arrangement in distn.Trs structure location |
| 59 | Provision of Distribution Transformer Name Board, ( Name of the 22/11 KV feeder , Name of the SS , Capacity of the DT). |
| 60 | ReleasingofACSR/AAACconductors fromconductordrumandcoiling ACSR 7/3.35, 7/2.59, AAAC7/2.50, 7/3.15 mm |
| 61 | Cutting of coconut leaves /per tree |
| 62 | Drilling of hole in channel only 3/4\" & 1\" |
| 63 | T.I.Fitting welding with clamps |
| 64 | Clearing of branches of treeper tree |
| 65 | Feeder arrangementswith Open Type fuse Units |
| 66 | Painting of Transformer (Double coat) |
| 67 | Releasing of HTS Wire from PSC Pole |
| 68 | Replacing of HQ&EM Meter to static meter |
| 69 | Replacement of earthing of pole with coil earthing including burying looping and binding |
| 70 | Erection of new earth pipe by replacing the corroded earth pipe |
| 71 | Erection of new 10\" earth pipe by replacing the corroded earth pipe and renewal of earthing including buryiung looping and binding |
| 72 | Fixing of meter on LV side of DT |
| 73 | Fencing of Distribution Transformer structure at road side Fabrication and erection |
| 74 | Erection of Transformer, strucure complete in all respects with wiring, earthing,fixing of open typefuse units, HT/LT LAS and jumpeing 3 No\"s. Earth pits with coller including painting of metal parts, structurepoles, fixing of tapping channel,channel, belting angle including concreting. (Except erection of Transfomer) |
| 75 | Erection of Transformer, strucure complete in all respects with wiring, earthing,fixing of open typefuse units, HT/LT LAS and jumpeing 3 No\"s. Earth pits with coller including painting of metal parts, structurepoles, fixing of tapping channel,channel, belting angle excluding concreting. (Except erection of Transfomer) |
| 76 | Erection of D.P.Structure with AB switch, top channel, cross bracing, earthing, painting, providing stay including concreting. |
| 77 | Erection of D.P.Structure with AB switch, top channel, cross bracing, earthing, painting, providing stay excluding concreting. |
| 78 | Erection of Single pole Transformer, strucure complete in all respects with wiring, earthing,fixing of open typefuse units, HT/LT LAS and jumpeing 3 No\"s. Earth pits with coller including painting of metal parts, structurepoles, fixing of tapping channel,transformer bed structure including concreting. (Except erection of Transfomer) |
| 79 | Erection of Single pole Transformer, strucure complete in all respects with wiring, earthing,fixing of open typefuse units, HT/LT LAS and jumpeing 3 No\"s. Earth pits with coller including painting of metal parts, structurepoles, fixing of tapping channel,transformer bed structure excluding concreting. (Except erection of Transfomer) |
| 80 | Set right the leaning of poles |
| 81 | Engaging of JCB/Crane for first 2 Hrs |
| 82 | Engaging of JCB/Crane for Every additional Hrs |
| 83 | Replacement of failed transformers all capacities |
| 84 | Clearing of shrub in yard DT/SS |
| 85 | Mass Concreting including materials(Cement+River sand /M sand and Blue metals and watering) |
| 86 | Stay concreting including cost of materials and labour 375mmX375mmX50mm. |
| 87 | Dismantling ofTransformer, strucure complete in all respects with wiring, earthing,fixing of open typefuse units, HT/LT LAS and jumpeing 3 No\"s. Earth pits with coller including painting of metal parts, structurepoles, fixing of tapping channel,channel, belting angle excluding concreting. |
| 88 | Dismantling of of D.P.Structure with AB switch, top channel, cross bracing, earthing, painting, providing stay excluding concreting. |
| 89 | Resagging ACSR 7/4.09 mm Raccoon conductor |
| 90 | Cutting of flat |
| 91 | Cutting of Channel |
| 92 | Cutting of Angle |
| 93 | Cutting of Pipe |
| 94 | Dismantling of ACSR 7/3.35mm or AAAC 7/3.15 conductor |
| 95 | Dismantling of ACSR 7/2.59 mm or AAAC2.50 mm7/2.11 ACSRconductor |