| 1 | Cleaning of floor area at `0` m level from behind bowl mill area, APH hopper area up to road including oil heating station, basement of clinker grinder for Unit no. 9,10,11,12& 13 (Frequency daily except holiday) (One job means work of one unit). |
| 2 | Cleaning of trenches, drain and cable trenches on boiler side of Unit no.9,10,11,12 & 13. (Frequency daily except holiday) (One job means work of one unit) |
| 3 | Cleaning of floor area of 13 m level around raw coal feeder, operator cabin including 14m floor of Aux. PRDS of each unit no. 9,10,11,12 & 13. (Frequency daily except holiday) (One job means work of one unit). |
| 4 | Cleaning of 0 m to 19 m main boiler (from column E to column M) including air heaters and pulverized coal pipes for Unit no.9,10,11,12 & 13. (Frequency daily except holiday) (One job means work of one unit). |
| 5 | Cleaning of the main boiler (19 m to 35 m) including 36 m level along with grills at 27 m Deaerator floor for unit no. 9,10,11,12 & 13. (Frequency alternate day except holiday (One job means work of one unit). |
| 6 | Cleaning of Milling system for unit no. 9,10,11,12 & 13. (Frequency daily except holiday) (One job means work of one unit). |
| 7 | Cleaning of FD fans & PA fans for unit no. 9,10,11,12 & 13 (Frequency twice in a week) (One job means work of one unit). |
| 8 | Cleaning of ash from outside area of Air pre-heater hoppers for unit no. 9,10,11,12 & 13 (Frequency twice in a week) (One job means work of one unit.) |
| 9 | Cleaning of ash from area outside area of Economizer hoppers unit no. 9,10,11,12 & 13 (Frequency twice in a week) (One job means work of one unit). |
| 10 | Cleaning of ESP control room floor for unit no. 9,10,11,12 & 13. (Frequency daily except holiday) (One job means work of one unit). |
| 11 | Collection & heaping of Ash/Clinker disposed off outside furnace at 0 m floor area for Unit No. 9,10,11,12 & 13. |
| 12 | Cleaning of T 9 m floor of unit no. 9, 10, 11,12 & 13 including UCBs, Analyzer Thermal control room, Boiler MCC of unit no. 9,10,11,12 & 13 (Frequency daily except holiday) (One job means work of one unit). |
| 13 | Cleaning of spider/cub web of UCB, unit no. 9,10,11,12 & 13, both MCB, turbine equipment’s and auxiliaries at 9m floor, 0m and -4m except walls, ceiling structures (Frequency weekly or as required). |
| 14 | Cleaning of T 0 m area and machines of unit no. 9,10,11,12 & 13 including its 6.6 KV/0.4 KV switch gear room, battery room and 0.4 KV station switch gear room below MCB and air washer room (Frequency Daily except holidays). |
| 15 | Cleaning of floor of -4 m level of turbine side from MCB to unit side (Frequency Daily except holidays). |
| 16 | Cleaning of all staircases from -4 m to 13 m level of Turbine side from MCB to Unit side (Frequency Daily except holidays). |
| 17 | Cleaning of walkway and floor of cable gallery at 5 m level of turbine side including floor of battery rooms and battery charger of unit no. 9,10,11,12 & 13 and cable gallery room their MCB(Frequency Daily except holidays). |
| 18 | Cleaning of T.G hall walls/structure including various columns up to approachable area of TG hall from MCB to Unit no. 9,10,11,12 & 13 (Twice in a week). |
| 19 | Disposal of Ash/garbage/clinker/scrap up to 3 Kg etc. from various locations of boiler unit no. 9,10,11,12 & 13 to scrap yard. |
| 20 | Disposal of ash garbage mixed coal dust from various locations of boiler unit no. 9, 10, 11, 12 &13 to ash disposal yard. |
| 21 | Cleaning of main turbine & generator cover of unit no. 9,10,11,12 & 13 (Daily, except holiday). |
| 22 | Cleaning of crossover pipes, BFP, Cond. Pump, SOP, A/C Lube oil pump, seal oil and lube oil pumps along with all other pumps 0 m level and -4 m level for Unit No. 9, 10, 11, 12 & 13 (Daily except holiday). |
| 23 | Cleaning of erection bay and 0.4 KV S/G room, battery room near 11th unit erection bay of unit 3xx200 MW & unit 2x200MW (Frequency Daily except holidays). |
| 24 | Cleaning of T/F yard of one unit (near GT / UAT). Cleaning of one unit transformer yard means one job for unit 3xx200 MW & unit 2x200MW (Frequency twice in a week). |
| 25 | Cleaning of galleries of offices at 5 m & 9 m floor from MCB to Unit side unit 3xx200 MW & unit 2x200MW (Daily except holidays). |
| 26 | Cleaning of oil from Turbine/Gen. Brg. & seal round the clock will constitute one job in a unit (Daily except holiday). |
| 27 | Cleaning of cooling tower floor area of unit no. 9,10,11,12 & 13. (Frequency twice in a week) (One job means work of one unit). |
| 28 | Cleaning of ID fan area of around of unit no. 9,10,11,12 & 13 (Alternate day except holiday). |
| 29 | Cleaning around ash slurry pumps (As and when required during S/D). |
| 30 | Cleaning of floor area of EP hopper at 0 m level of one unit (For 5x200 MW only) Cleaning one unit means one job. (Daily except holiday). |
| 31 | Cleaning of floor area and building at 0 M level in new compressor house (Daily except holiday). |
| 32 | Cleaning all IR make compressor in new building, (Alternate day or if required day) |
| 33 | Disposal of ash accumulated in canteen near 9th& 13th Unit. |
| 34 | Collection & removal of ash from pump house floor (As and when required during S/D). |
| 35 | Cleaning of ID fan motors LOP System etc. (As and when required during S/D). |
| 36 | Cleaning of M.C.B.Floor area of panel room, compressor room & sump pump house of ATPS and cleaning of table, chair, and glass door of UCB preparing of tea/breakfast/ refreshment to operation personnel (Per shift). |
| 37 | Cleaning of table, chair, and glass door of UCB {2x200 MW), preparing of tea /breakfast/ refreshment to operation personnel per shift & serving of official letters to operation personnel in morning, evening & night shift (Per shift). |
| 38 | Cleaning of area between contractor cabin and unit # 12, 13 around dustbin (Frequency twice in a week). |
| 39 | Cleaning of mechanical workshop ATPS and removing of mud/garbage from unit no.12, 13 both outside galleries Freq. twice in a week. |
| 40 | Cleaning of floor of CW pump house along with grills, gallery of C.W pump house etc. (Frequency twice in a week). |
| 41 | Removal of cub web at the operating floor equipment’s including all the pumps and gallery. Cleaning of all above one time means one job of 2x200 MW (Frequency twice in a week). |
| 42 | Cleaning of Mechanical Workshop, BTPS, Obra (Frequency twice in a week). |
| 43 | Collecting / removing ash from tranches of boiler side whenever there is leakage in pipeline and pump. |
| 44 | Cleaning of floor area at 0 m level D. G. Set house (Frequency Daily except holidays). |
| 45 | Cleaning of new compressor situated in front of GT of Unit no.12,13 (1) Cleaning of floor (Daily except holidays). (2) Cleaning of equipment (Daily except holidays). |
| 46 | Cleaning of newly constructed bay control unit (BCU) of 400 KV S/Yard (Daily except holidays). |
| 47 | Cleaning of floor of -4 m cable gallery from MCB to Unit no.12 (Daily except holidays). |
| 48 | Cleaning of floor of -4 m cable gallery. (a)Unit no.09,10 & 11 (Daily except holidays) OGD-I(b) Unit no. 12 &13(Daily except holidays) OGD-II |