| 1 | Electrical Items : |
| 2 | Cable Holding clamp with N&B |
| 3 | Holding Clamp for SP-55 with N/B |
| 4 | LT Shackle Insulator Clamp |
| 5 | PP & CLAMP WITH N&B ST POLE SP-55 |
| 6 | Stay Clamp for SP-55 With Nut & Bolt |
| 7 | PP & CLAMP WITH N&B ST POLE SP-33 |
| 8 | PP & CLAMP WITH N&B ST POLE SP-72 |
| 9 | SHACKLE INSULATOR 100X115 mm WITH N&B |
| 10 | 11KV CABLE T/K 3X300mm² XLPE I/D |
| 11 | 11KV CABLE T/K 3X300mm² XLPE O/D |
| 12 | 11KV XLPE STRAIGHT THROUGH 3X400 SQMM-D |
| 13 | 11kv 3P(400A)3pin vert. mount GO AB TPMO |
| 14 | AL CRIMPING TYPE LUGS 400 SQ. mm |
| 15 | GI Strip 40x6 mm |
| 16 | LABOUR (SERVICES) |
| 17 | 16.18.1 (DSR CODE 2014) |
| 18 | SPECIAL EARTHING |
| 19 | ERECTION OF EARTHING ROD |
| 20 | FABRICATION OF STEEL |
| 21 | FIXING OF GI PIPE |
| 22 | FIXING OF RCC CABLE ROUTE MARKER |
| 23 | EXCAVATION OF PIT FOR STAY SET |
| 24 | ERECTION OF 11 KV STAY SET |
| 25 | GROUTING OF STAY SET |
| 26 | EXCAVATION OF PIT FOR POLE |
| 27 | ERECTION OF SINGLE SP-33 POLE |
| 28 | ERECTION OF SINGLE SP-55 POLE |
| 29 | ERECTION OF SP-55 DOUBLE POLE |
| 30 | GROUTING OF POLE |
| 31 | MUFFING OF POLE |
| 32 | DISMANTLING OF SP-55 SINGLE POLE |
| 33 | DISMANTLING OF SP-55 DOUBLE POLE |
| 34 | DISMANTLING OF GUARDING IN 11 KV LINE |
| 35 | LAYING OF U/G 11 KV CABLE(TRENCHLESS) |
| 36 | FIXING OF TPMO |
| 37 | FIXING OF FUSE SET |
| 38 | FIXING OF LIGHTNING ARRESTOR |
| 39 | LAYING OF DOG CONDUCTOR IN HT LINE |
| 40 | GUARDING OF LT/11 KV LINE |
| 41 | LOPPING & CHOPPINGOF TREE BRANCHES |
| 42 | T-OFF CONNECTION COMPLETE 11 KV LINE |
| 43 | CONST.,INST.OF DANGER BOARD/ NUMBER PLATE |
| 44 | MAKING OF SECTION POLE |
| 45 | FIXING OF 11 KV XLPE JOINTING KIT |
| 46 | FIXING OF 11 KV XLPE STRAIGHT THRU |
| 47 | CARTAGESP-33 POLE, 0-20 KM |
| 48 | CARTAGESP-55 POLE, 0-20 KM |
| 49 | CARTAGE OF PETTY MATERIAL,0-20 KM |
| 50 | HEADLOAD CARTAGESP-33 POLE(0-1 KM) |
| 51 | HEADLOAD CARTAGESP-55 POLE(0-1 KM) |
| 52 | HEADLOAD CARTAGE OF MATERIAL(0-1 KM) |
| 53 | DISMAN LT XLPE ABC 3X120+1X95+1X16 Sq.mm |
| 54 | DISMAN of LT XLPE ABC 3X95+1X70Sq.mm |
| 55 | BACK CARTAGE OF PETTY MATERIAL,0-20 KM |
| 56 | Dismantling of ACSR Dog |
| 57 | FINAL TESTING OF CABLE, PANEL etc. |
| 58 | SUPPLY AND LAYING OF HDPE PIPE |
| 59 | BACK HEAD LOAD CART. OF PETTY MAT. 0-1KM |
| 60 | DISCONN & RECONN. OF SERVICE CONN. 1PH. |
| 61 | DISCONN & RECONN. OF SERVICE CONN. 3PH. |
| 62 | SUPPLY & FIXING SUSPENSION CLAMP I HOOK |
| 63 | SUPPLY & FIXING DEAD END CLAMP EYE HOOK |
| 64 | RELAYING RESAGGING3x95SQ.MM. AB CABLE |
| 65 | RELAYING RESAGGING3x120 SQ.MM AB CABLE |
| 66 | DIGGING TRENCH FOR LAYING U/G 11KV CABLE |
| 67 | LAYING OF 11 KV CABLE |
| 68 | PAINTING OF POLE |