}

Execution Of Contract For 1.Eos To 1No Tatkal Sc To Tmy.Malarselvi, 2.Eos To 1No Tatkal Sc To Tmy V.Abirami, Eos To 2Nos Tv Vi Sc To Thiru.Selvaraj At Vallioor Section Works In Vallioor Sub Division /Tirunelveli Edc, vallioor-Tamil Nadu

Boards / Undertakings / PSU has published Execution Of Contract For 1.Eos To 1No Tatkal Sc To Tmy.Malarselvi, 2.Eos To 1No Tatkal Sc To Tmy V.Abirami, Eos To 2Nos Tv Vi Sc To Thiru.Selvaraj At Vallioor Section Works In Vallioor Sub Division /Tirunelveli Edc. Submission Date for this Tender is 08-07-2024. Transmission Line Tenders in vallioor Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

43996038
Execution Of Contract For 1.Eos To 1No Tatkal Sc To Tmy.Malarselvi, 2.Eos To 1No Tatkal Sc To Tmy V.Abirami, Eos To 2Nos Tv Vi Sc To Thiru.Selvaraj At Vallioor Section Works In Vallioor Sub Division /Tirunelveli Edc
Open Tender
Indian
Tamil Nadu
Vallioor
08-07-2024

Tender Details

Execution Of Contract For 1.Eos To 1No Tatkal Sc To Tmy.Malarselvi, 2.Eos To 1No Tatkal Sc To Tmy V.Abirami, Eos To 2Nos Tv Vi Sc To Thiru.Selvaraj At Vallioor Section Works In Vallioor Sub Division /Tirunelveli Edc; 29 a Normal ground Excavation of pole pit (1.25m * 0.6m*2.19m) Loc Erection Loc b Rockey ground( Medium) Excavation of pole pit (1.25m * 0.6m*2.19m) Loc Erection Loc c Hard Rock requring Blasting and Chisseling ( Specific approval obtained from EE) Excavation of pole pit (1.25m * 0.6m*2.19m) Loc Erection 5 Transporting of poles from road side to pole pit upto 2 KM i 7.32m, 7.5m, 8m, 8.23m RCC pole Each Pole ii 9m, 9.14m RCC pole Each Pole iii RSJ 36 Pole Each Pole iv RSJ 42 and above Each Pole 6 Loading and Unloading of poles i 7.32m, 7.5m, 8m, 8.23m RCC pole / PSC Pole Each ii 9m, 9.14m RCC pole / PSC Pole Each iii RS Joists, tubular & rail pole (above 9.14m) Each 7 Concreting of poles i Concreting of pole as per Board Standards (2*2*5). The material such as sand, jelly, etc. have to be supplied by the contractor. Cement supplied by contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc, complete. LOC ii Coping of pole (0.6m*0.6m*0.35m) Each iii Concreting of stay (o.3m * 0.3m * 1.5m) including all materials. Each 8 Coil earthing per pole & pole earthing Each 9 Excavation and erection of stay set with transporting of materials to site i Normal ground Excavation of stay pit (1.00m * 0.5m*1.5m) LOC Erection LOC ii Rockey ground( Medium) 30 Excavation of stay pit (1.00m * 0.5m*1.5m) LOC Erection LOC iii Hard Rock requring Blasting and Chisseling ( Specific approval obtained from EE) Excavation of stay pit(1.00m X 0.5m X 1.5m) LOC Erection of Stay set LOC 10 Loading & unloading charges of materials. i Loading and unloading of Oil drums (with oil) Per drum ii Loading and unloading of Oil drums (without oil) Per drum iii Conductor Drum, Cable Drum Per drum iv Line Materials MT v Metering Set Each 11 Fixing of cross arm and insulator including transporting of materials from road side to site a 11 KV Lines i V cross arm, Channel cross Arm5 1/2 ( Pin Point / Cut Point ) Each ii V cross arm, Channel cross Arm4 1/2 ( Pin Point / Cut Point ) Each iii V cross arm, Channel cross Arm3 1/2 ( Pin Point / Cut Point ) Each iv LT three phase cross arm Each v LT single phase cross arm Each vi HT / LT TI fitting Each b. i Erection of HT Side arm with stud Each ii Erection of LT Side arm with stud Each III Fixing of insulator (per location) Loc Iv Fixing of 11 KV Disc Each v Tapping Channel Cross arm 12 HT lines - Stringing, Sagging, binding including transporting of materials from road side to site A 33 KV Lines ( span/wire) i For Dog Conductor 1 Run ii For 7/4.09 ACSR 1 Run iii For line clear works B 11 KV Lines (span/Wire) i For 7/2.59 ACSR 1 Run ii For 7/3.35 ACSR 1 Run iii For 7/4.09 ACSR 1 Run iv For line clear works 31 13 LT lines - Stringing, Sagging, binding including transporting of materials from road side to site i For 7/2.59 ACSR,7/2.50 AAAC Run ii For 7/3.35 ACSR,7/3.15 AAAC Run iii For line clear works 14 Guarding per span length i Spilt Neutral Guarding Loc ii Flat Guarding (2 wires) Loc iii Flat Guarding (4 wires) Loc iv Flat Guarding (6 wires) Loc v Cradle Guarding (Fixing of X arm Lacing ) Loc vi Fixing of one earthing device with stud Each 15 Erection of transformer or dismantling i Upto 200 KVA Each ii 250 KVA Each iii 500 KVA Each iv Erection of centre support (Including concrete) Each v Erection of Metering set Each 16 Erection of feeder cable i Erection of feeder cable with open type fuse unit per feeder and for each addl feeder Each ii Bus bar arrangement with open type Loc 17 Loading and Unloading of distribution transformer i Below 250 KVA Each ii 250 KVA Each iii 500 KVA Each iv Plinth Work For 500 KVA Dt with construction material Each v Fabrication ,erection and excavation for centre support etc for 250 /500 DT including transporting 18 Tube light erected i 1 * 40 W tube light erected in complete set (including transport) Each ii For S.V. lamp, Mercury lamp Each iii For CFL Lamp Each iv Painting of Sc Number including Painting v 72 W LED 32 19 Manufacturing of Clamps i 50 * 8 mm Each ii 65 * 10 mm Each 20 Alteration of clamps Each 21 Street light switching point arrangement Each 22 Drilling / Less than 23mm holes per hole /slatted holes Each 23 Cutting of channels / Flats / Angles i Channel / Flat / Angle Each ii RSJ pole cutting Each iii Tubular pole cutting Each iv Rail pole cutting Each 24 Fabrication of Lightning Arrestor frame Each 25 Changing of pin point to cut point i LT Per wire ii HT Per wire 26 Erection of service connection materials i Single Phase service connection Each ii Three Phase service connection Each 27 Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc., Each 28 Dismantling of poles without concrete in damaged condition including grill separation etc., Each 29 Providing jumpering at cut point Per Wire 30 complete replacement of worn out earth wire per structure Per Wire 31 Labour for manufacturing of open type ( Material Supplied By Board ) Str 32 Manufacturing of HG fuse stool per str including materials Str 33 Tree clearence in HT or LT location a For ordy. Tree clearence and Throng bushes & trees Each Labour 33 b. For coconut trees Each Labour c For Palmrah trees Each Labour 34 Painting structure i Double pole Transformer structure materials (Double coat) ( excluding cost of paint / Including cost of paint) Per Str ii Pole (Colour washing with Distember) 2 nos.( excluding cost of paint / Including cost of paint) Loc iii For transformer only (Double coat) with Paint. Each iv Numbering of poles with backround colour paint Str 35 Numbering of Distn. transformer (Painting and writing of name board of size 1-1/4 * 1 including cost of paint & board and M.S. Sheet) Str i Writing in seating channel (Paint to be supplied by the contractor) 1 No ii Painting of RCC Str. Poles all metal parts, snowcem & aluminium paint to be supplied by the contractor Str iii Painting of RSJ Str. Poles + all metal parts, aluminium paint supplied by the contractor Str 36 Set right of leaning of HT pole or LT pole including X arms, TI fittings Each 37 a) Details of erection of Transformer structure 1 Excavation of structure pole pits (2 Nos) Str 2 Erection of structure poles (2 Nos) Str 3 Excavation of stay pits (4 Nos) Str 4 Erection of stay set (4 Nos) Str 5 Concreting of structure poles including materials Mass Concrete with Copping 2 Poles 6 Concreting of stays (4 Nos) including all material 4 Nos. 37 b) Erection of Structure materials 1 Top channel Each 2 Transformer seating channel and belting angle Each 3 AB switch (complete) Each 4 HG Fuse (complete) Set 5 Jumpering Str 6 HT LAS Str 7 LT LAS Str 8 Transformer LT cable wiring / LT Bus Bar 1 Set 9 Erection of LT Open type fuse unit including cable jumbering up to the line including cutting welding bending ,fabrication etc 1 Set 37 c) Earthing system 1 Excavation of 4 Nos. earth pits Str 34 2 Excavation of earth wire trenches and paving of earth wire, Erection of 4 Nos. earth pipe and giving earth connection, Earthing of all metal parts, Las etc., including central connection Str 3 Mason works with bricks for earth pits 4 nos (cement supplied by Contractor) Str 4 Painting of transformer structure 2 coats including paint cost Str 5 Painting with Distember paint on poles with paint cost Str 6 Spreading yard jelly and cut stone and bricks including material PER LOC 7 Writing of name board and target board Each 8 Transporting of Structure materials ABS,HG Fuse,cable etc Except Pole 9 Fixing of Danger Board ( labour only) 38 a) Details of erection of Tapping structure 1 Excavation of structure pole pit. 2 Nos 2 Erection of structure pole. 2 Nos 3 Excavation of stay pit. 2 Nos 4 Erection of stay set. 2 Nos 5 Concreting of structure poles including materials Mass Concrete with Copping 2 Nos 6 Concreting of stay. 2 Nos 38 b) Erection of Structure materials 1 Top channel Each 2 AB switch (complete) Each 3 Assemble, operating pipe fixing etc., fixing of cross bracing Str 38 c) Earthing system 1 Excavation of 1 No. earth pits Excavation of earth wire trench and paving of earth wire, Erection of 1 No. earth pipe and giving earth connection, Earthing of all metal parts, for tapping structure. Str 2 Mason works with Bricks for earth pit (including material) Each 3 Colour coating on poles with iron materials including paint and distemper. Str 39 a) Transporting of 42 twin RSJ pole from roadside pole pit Each b) Fabrication of 42 Twin RSJ pole, Materials supplied by Board. Each c) Excavation & Erection of Twin 422 fabricated RSJ pole Each d) Concreting of 42 twin RSJ pole Each e) Loading & Unloading of 42 Twin RSJ pole Each 40 Re Sagging Per Wire 35 41 i) Dismantling of 7.5m /8m pole without damage Each II Dismantling of 9.14m pole/ RSJ without damage Each III Dismantling of stay set complete Each IV Replacement of detoriated stay rod Each V Replacement of RSJ/Tubular poles below 30 feet Each VI Replacement Of RSJ/Tubular poles above 30 feet Each 42 Dismantling of detoriated cables of various size(95,120,185 sq.mm) from DT,LT bushing to LT open type clamp and erection of suitable lug at both ends Per DT 43 Replacement of new 10 earth pipe replacing the corroded earth pipe and renewal of earthing including burying , looping and binding Per Pipe 44 Mass Concrete for poles on the line ( All Materials including cement Ratio 1:2:4) ( 1 Loc ( 0.72 m3) (0.65*0.65*1.65 m,0.6*0.6*0.35 Cum) Each 45 Sleeve Concrete for poles on the line ( All Materials including cement Ratio 1:2:4) ( 1 Loc ( 0.202 ) (0.5*0.45*0.9M) Each 46 Providing of Spacers in LT Lines Each 47 Hiring of JCB Per Hour 48 Hiring of Crane Per Hour 49 Exceeding 1 Hour for every hour Per Hour 50 Transporting of Charges of DT / Line materials using private vehicle upto 20 KM ( Up and Down) LS 51 Beyond 20 KM for every KM 52 Details of erection of Double Pole Transformer structure 52.1 Excavation of structure pole pits (2 Nos) Str 52.2 Erection of structure poles (2 Nos) Str 52.3 Excavation of stay pits (4 Nos) Str 52.4 Erection of stay set (4 Nos) Str 52.5 Concreting of structure poles including materials Mass Concrete with Copping 2 Poles 52.6 Concreting of stays (4 Nos) including all material 2Nos. Erection of Structure materials 52.7 Top channel Each 52.8 Transformer seating channel and belting angle Each 52.9 AB switch (complete) Each 52.10 HG Fuse (complete) Set 52.11 Jumpering Str 52.12 HT LAS Str 52.13 LT LAS Str 52.14 Transformer LT cable wiring / LT Bus Bar 1 Set 36 52.15 Erection of LT Open type fuse unit including cable jumbering up to the line including cutting welding bending ,fabrication etc 1 Set Earthing system 52.16 Excavation of 4 Nos. earth pits Str 52.17 Excavation of earth wire trenches and paving of earth wire, Erection of 3 Nos. earth pipe and giving earth connection, Earthing of all metal parts, Las etc., including central connection Str 52.18 Mason works with Bricks for 4 Nos.earth pits and structure pole coping (cement supplied by Contractor) Str 52.19 Painting of transformer structure 2 coats including paint Cost Str 52.20 Painting with Distember paint on poles including paint Cost Str 52.21 Spreading yard jelly and cut stone and bricks including material PER LOC 52.22 Writing of name board and target board including paint Cost Each 52.23 Transporting of Structure materials ABS,HG Fuse,cable etc Except Pole 52.24 Fixing Of Danger Board Each Erection of Single PoleTransformer Structure Complete 53.1 Excavation of structure pole pit 3’ x 6’ by using JCB or Manual 1 No. 53.2 Transportation of pole from road side to pole pit by using JCB or Manual 1 No. 53.3 Erection of poles by using JCB or Manual 1 No. 53.4 Excavation of stay pit by JCB or Manual 2 Nos. 53.5 Erection of stay set complete 2 Nos. 53.6 Mass concreting for structure 1 No. 53.7 Stay Concrete 2 Nos. Erection of Structure materials; 53.8 a) Tapping channel 1 No. 53.9 b) Transformer Bed Stucture 1 No. 53.10 Erection of AB switch 1 set 53.11 Erection of H.G. Fuse 3 Nos. 53.12 Structure earthing complete with 3 pits and earth loops DT 53.13 Fixing of MCD Box DT 53.14 HT-LAS fixing 1 set (3 Nos.) 53.15 LT-LAS fixing 1 set (3 Nos.) 53.16 HT jumpering complete 1 set 53.17 Painting of all clamps and other iron materials and painting of structure pole 1 set 53.18 LTCable arrangement 1 set 53.19 Fixing of Danger board DT

Key Value

Document Fees
Refer document
EMD
INR 2000.0 /-
Tender Value
INR 2 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail