}

Providing Infrastructure Part Of Lt Line To New Pww Connection In R/0 At Bopkhel V Padefrom Jjm Tal-Dhule Dist-Dhule, Dhule-Maharashtra

Rural Development Department has published Providing Infrastructure Part Of Lt Line To New Pww Connection In R/0 At Bopkhel V Padefrom Jjm Tal-Dhule Dist-Dhule. Submission Date for this Tender is 08-07-2024. Electrification Work Tenders in Dhule Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

43952397
Providing Infrastructure Part Of Lt Line To New Pww Connection In R/0 At Bopkhel V Padefrom Jjm Tal-Dhule Dist-Dhule
Open Tender
Indian
Maharashtra
Dhule
08-07-2024

Tender Details

Providing Infrastructure part of LT line to new PWW connection in R/0 at BOPKHEL V PADEFrom JJM Tal-Dhule Dist-Dhule - 1 BOPKHEL GP NALYAJAVAL Subwork No 1 -11/0.4 KV, 25 KVA Dist. Transformer centers on Psc, 9 mtr with Kitkat Dist box 11/433k 25KVA Transformer 2 PSC Pole 9M (200 kg) 3 MS Channel 100x50x6mm 4 MS Channel 75x40x6mm 5 MS angle 50x50x6mm 6 MS flat 50x6mm 7 11kv pin insulator with GI pins 8 LT Dist Boxes 25/63kva with KITKAT 9 L.As 11kv gapless type with disconnetor 10 HT stay set 11 GI stay wire 7/4mm (8swg) 12 earthing set HT 13 13.11KV HG fuses 14 14.11kvAB switch 15 15.Danger board in yard 16 16.concrete ratio 1:3:6 17 17.painting hardware & support with numbering of pole 18 18.DTC Metring with box single core LT. XLPE cable (16sq.mm 120mtr length) and other allied material. 19 19.sundries 20 Subwork No 2- cost data for 11kv single circuit pin type with 55sqmm AAAC lines on 100x116 mm 9m PSC Pole PSC Pole 9m Long (200kg) 21 11kv guarding channel MS 75X40 22 mm channel 75x40x6mm 23 mm angle 50x50x6mm 24 11kv V cross arm with clamp 25 11kv top fitting with clamp 26 ms flat 50x10mm 27 11kv pin insulator with gi pin 28 Disc insulator 11kv 7000kg 29 strain hardware for 55sqmm AAAC 30 AAAC 55MM2 31 Sleve Joints 32 HT stay set 33 GI Stay wire 7/4mm (8SWG) 34 earthing set HT 35 GI barbed wire A type 36 Danger board in yard 37 concrete ratio 1:3:6 38 GI wire 8SWG 6SWG 39 black bituyminus paint 40 Red oxide paint for 2coats 41 Aluminium paint for 1 cost 42 G.I Nut Bolts 43 Sundries 44 Subwork No 3- Service Material Charges for Three Phase Connection With LT MCB With EnclosureW.P Wire 10 mm 2 core 45 Meter Board 46 Three phase meter 10*40 A 47 Meter Box 48 KITKAT Fuse 15A/650V 49 I.C.CUTOUT 15A/650V 50 L.T.M,C.B (SP)WITH ENCLOSURE 20A 51 G.I Wire 8 SWG 52 G.I Pipe 25mm 53 Reel insulator 20 mm 54 GI Bend 25mm 55 PVC Flexible pipe 25mm 56 GI Coupling 25mm 57 Sundries such as nut bolts Washers Jumpers etc. 58 Contractor supervision charges on material 5% 59 Contractors Profit 5% 60 Trasportation on material 4% 61 T & P on material cost 1% 62 Contigencies on Material 2.50% 63 Labours Cess (on toral works cost instead of only) 1% 64 Insurance1% 65 Turnkey Charges 1% 66 Ho Supervision Charges 13% 67 Bhilkhedi Subwork No 1 -11/0.4 KV, 25 KVA Dist. Transformer centers on Psc, 9 mtr with Kitkat Dist box 11/433k 25KVA Transformer 68 PSC Pole 9M (200 kg) 69 MS Channel 100x50x6mm 70 MS Channel 75x40x6mm 71 MS angle 50x50x6mm 72 MS flat 50x6mm 73 11kv pin insulator with GI pins 74 LT Dist Boxes 25/63kva with KITKAT 75 L.As 11kv gapless type with disconnetor 76 HT stay set 77 GI stay wire 7/4mm (8swg) 78 earthing set HT 79 13.11KV HG fuses 80 14.11kvAB switch 81 15.Danger board in yard 82 16.concrete ratio 1:3:6 83 17.painting hardware & support with numbering of pole 84 18.DTC Metring with box single core LT. XLPE cable (16sq.mm 120mtr length) and other allied material. 85 19.sundries 86 Subwork No 2- cost data for 11kv single circuit pin type with 55sqmm AAAC lines on 100x116 mm 9m PSC Pole PSC Pole 9m Long (200kg) 87 mm channel 75x40x6mm 88 mm angle 50x50x6mm 89 11kv V cross arm with clamp 90 11kv top fitting with clamp 91 ms flat 50x10mm 92 11kv pin insulator with gi pin 93 Disc insulator 11kv 7000kg 94 strain hardware for 55sqmm AAAC 95 AAAC 55MM2 96 Sleve Joints 97 HT stay set 98 GI Stay wire 7/4mm (8SWG) 99 earthing set HT 100 GI barbed wire A type 101 Danger board in yard 102 concrete ratio 1:3:6 103 GI wire 8SWG 6SWG 104 black bituyminus paint 105 Red oxide paint for 2coats 106 Aluminium paint for 1 cost 107 G.I Nut Bolts 108 Sundries 109 Subwork No 3- Service Material Charges for Three Phase Connection With LT MCB With EnclosureW.P Wire 10 mm 2 core 110 Meter Board 111 Three phase meter 10*40 A 112 Meter Box 113 KITKAT Fuse 15A/650V 114 I.C.CUTOUT 15A/650V 115 L.T.M,C.B (SP)WITH ENCLOSURE 20A 116 G.I Wire 8 SWG 117 G.I Pipe 25mm 118 Reel insulator 20 mm 119 GI Bend 25mm 120 PVC Flexible pipe 25mm 121 GI Coupling 25mm 122 Sundries such as nut bolts Washers Jumpers etc. 123 Contractor supervision charges on material 5% 124 Contractors Profit 5% 125 Trasportation on material 4% 126 T & P on material cost 1% 127 Contigencies on Material 2.50% 128 Labours Cess (on toral works cost instead of only) 1% 129 Insurance1% 130 Turnkey Charges 1% 131 Ho Supervision Charges 13% 132 SATRIPADA Subwork No 1 -11/0.4 KV, 25 KVA Dist. Transformer centers on Psc, 9 mtr with Kitkat Dist box 11/433k 25KVA Transformer 133 PSC Pole 9M (200 kg) 134 MS Channel 100x50x6mm 135 MS Channel 75x40x6mm 136 MS angle 50x50x6mm 137 MS flat 50x6mm 138 11kv pin insulator with GI pins 139 LT Dist Boxes 25/63kva with KITKAT 140 L.As 11kv gapless type with disconnetor 141 HT stay set 142 GI stay wire 7/4mm (8swg) 143 earthing set HT 144 13.11KV HG fuses 145 14.11kvAB switch 146 15.Danger board in yard 147 16.concrete ratio 1:3:6 148 17.painting hardware & support with numbering of pole 149 18.DTC Metring with box single core LT. XLPE cable (16sq.mm 120mtr length) and other allied material. 150 19.sundries 151 Subwork No 2- cost data for 11kv single circuit pin type with 55sqmm AAAC lines on 100x116 mm 9m PSC Pole PSC Pole 9m Long (200kg) 152 11kv guarding channel MS 75X40 153 mm channel 75x40x6mm 154 mm angle 50x50x6mm 155 11kv V cross arm with clamp 156 11kv top fitting with clamp 157 ms flat 50x10mm 158 11kv pin insulator with gi pin 159 Disc insulator 11kv 7000kg 160 strain hardware for 55sqmm AAAC 161 AAAC 55MM2 162 Sleve Joints 163 HT stay set 164 GI Stay wire 7/4mm (8SWG) 165 earthing set HT 166 GI barbed wire A type 167 Danger board in yard 168 concrete ratio 1:3:6 169 GI wire 8SWG 6SWG 170 black bituyminus paint 171 Red oxide paint for 2coats 172 Aluminium paint for 1 cost 173 G.I Nut Bolts 174 Sundries 175 Subwork No 3- Service Material Charges for Three Phase Connection With LT MCB With EnclosureW.P Wire 10 mm 2 core 176 Meter Board 177 Three phase meter 10*40 A 178 Meter Box 179 KITKAT Fuse 15A/650V 180 I.C.CUTOUT 15A/650V 181 L.T.M,C.B (SP)WITH ENCLOSURE 20A 182 G.I Wire 8 SWG 183 G.I Pipe 25mm 184 Reel insulator 20 mm 185 GI Bend 25mm 186 PVC Flexible pipe 25mm 187 GI Coupling 25mm 188 Sundries such as nut bolts Washers Jumpers etc. 189 Contractor supervision charges on material 5% 190 Contractors Profit 5% 191 Trasportation on material 4% 192 T & P on material cost 1% 193 Contigencies on Material 2.50% 194 Labours Cess (on toral works cost instead of only) 1% 195 Insurance1% 196 Turnkey Charges 1% 197 Ho Supervision Charges 13% 198 UMARYAMAL Subwork No 1 -11/0.4 KV, 25 KVA Dist. Transformer centers on Psc, 9 mtr with Kitkat Dist box 11/433k 25KVA Transformer 199 PSC Pole 9M (200 kg) 200 MS Channel 100x50x6mm 201 MS Channel 75x40x6mm 202 MS angle 50x50x6mm 203 MS flat 50x6mm 204 11kv pin insulator with GI pins 205 LT Dist Boxes 25/63kva with KITKAT 206 L.As 11kv gapless type with disconnetor 207 HT stay set 208 GI stay wire 7/4mm (8swg) 209 earthing set HT 210 13.11KV HG fuses 211 14.11kvAB switch 212 15.Danger board in yard 213 17.painting hardware & support with numbering of pole 214 18.DTC Metring with box single core LT. XLPE cable (16sq.mm 120mtr length) and other allied material. 215 19.sundries 216 Subwork No 2- cost data for 11kv single circuit pin type with 55sqmm AAAC lines on 100x116 mm 9m PSC Polemm channel 75x40x6mm 217 mm angle 50x50x6mm 218 ms flat 50x10mm 219 11kv pin insulator with gi pin 220 Disc insulator 11kv 7000kg 221 strain hardware for 55sqmm AAAC 222 AAAC 55MM2 223 Sleve Joints 224 HT stay set 225 GI Stay wire 7/4mm (8SWG) 226 GI barbed wire A type 227 Danger board in yard 228 GI wire 8SWG 6SWG 229 Sundries 230 Subwork No 3- Service Material Charges for Three Phase Connection With LT MCB With EnclosureW.P Wire 10 mm 2 core 231 Meter Board 232 Three phase meter 10*40 A 233 Meter Box 234 KITKAT Fuse 15A/650V 235 I.C.CUTOUT 15A/650V 236 L.T.M,C.B (SP)WITH ENCLOSURE 20A 237 G.I Wire 8 SWG 238 G.I Pipe 25mm 239 Reel insulator 20 mm 240 GI Bend 25mm 241 PVC Flexible pipe 25mm 242 GI Coupling 25mm 243 Sundries such as nut bolts Washers Jumpers etc. 244 Contractor supervision charges on material 5% 245 Contractors Profit 5% 246 Trasportation on material 4% 247 T & P on material cost 1% 248 Contigencies on Material 2.50% 249 Labours Cess (on toral works cost instead of only) 1% 250 Insurance1% 251 Turnkey Charges 1% 252 Ho Supervision Charges 13% 253 RAMPURA Subwork No 1 -11/0.4 KV, 25 KVA Dist. Transformer centers on Psc, 9 mtr with Kitkat Dist box 11/433k 25KVA Transformer 254 PSC Pole 9M (200 kg) 255 MS Channel 100x50x6mm 256 MS Channel 75x40x6mm 257 MS angle 50x50x6mm 258 MS flat 50x6mm 259 11kv pin insulator with GI pins 260 LT Dist Boxes 25/63kva with KITKAT 261 L.As 11kv gapless type with disconnetor 262 HT stay set 263 GI stay wire 7/4mm (8swg) 264 earthing set HT 265 13.11KV HG fuses 266 14.11kvAB switch 267 15.Danger board in yard 268 16.concrete ratio 1:3:6 269 17.painting hardware & support with numbering of pole 270 18.DTC Metring with box single core LT. XLPE cable (16sq.mm 120mtr length) and other allied material. 271 19.sundries 272 Subwork No 2- cost data for 11kv single circuit pin type with 55sqmm AAAC lines on 100x116 mm 9m PSC Pole PSC Pole 9m Long (200kg) 273 mm channel 75x40x6mm 274 mm angle 50x50x6mm 275 11kv V cross arm with clamp 276 11kv top fitting with clamp 277 ms flat 50x10mm 278 11kv pin insulator with gi pin 279 Disc insulator 11kv 7000kg 280 strain hardware for 55sqmm AAAC 281 AAAC 55MM2 282 Sleve Joints 283 HT stay set 284 GI Stay wire 7/4mm (8SWG) 285 earthing set HT 286 GI barbed wire A type 287 Danger board in yard 288 concrete ratio 1:3:6 289 GI wire 8SWG 6SWG 290 black bituyminus paint 291 Red oxide paint for 2coats 292 Aluminium paint for 1 cost 293 G.I Nut Bolts 294 Sundries 295 Subwork No 3- Service Material Charges for Three Phase Connection With LT MCB With EnclosureW.P Wire 10 mm 2 core 296 Meter Board 297 Three phase meter 10*40 A 298 Meter Box 299 KITKAT Fuse 15A/650V 300 I.C.CUTOUT 15A/650V 301 L.T.M,C.B (SP)WITH ENCLOSURE 20A 302 G.I Wire 8 SWG 303 G.I Pipe 25mm 304 Reel insulator 20 mm 305 GI Bend 25mm 306 PVC Flexible pipe 25mm 307 GI Coupling 25mm 308 Sundries such as nut bolts Washers Jumpers etc. 309 Contractor supervision charges on material 5% 310 Contractors Profit 5% 311 Trasportation on material 4% 312 T & P on material cost 1% 313 Contigencies on Material 2.50%

Key Value

Document Fees
INR 1000 /-
EMD
INR 11875.0 /-
Tender Value
INR 11.87 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail