}

Tender For Various Site New Connection Released And Shifting Work In Deposit Head At Running Under Edsd Ii Mzn, Under The Work Area Of Executive Engineer, Electricity Distribution Division-I, Muzaffarnagar Subordinate Subdivision Officer, Electricity Dist, Muzaffarnagar-Uttar Pradesh

Government Departments has published Tender For Various Site New Connection Released And Shifting Work In Deposit Head At Running Under Edsd Ii Mzn, Under The Work Area Of Executive Engineer, Electricity Distribution Division-I, Muzaffarnagar Subordinate Subdivision Officer, Electricity Dist. Submission Date for this Tender is 05-07-2024. Electrification Work Tenders in Muzaffarnagar Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43909962
Tender For Various Site New Connection Released And Shifting Work In Deposit Head At Running Under Edsd Ii Mzn, Under The Work Area Of Executive Engineer, Electricity Distribution Division-I, Muzaffarnagar Subordinate Subdivision Officer, Electricity Dist
Open Tender
Indian
Uttar Pradesh
Muzaffarnagar
05-07-2024

Tender Details

Tender For Various Site New Connection Released And Shifting Work In Deposit Head At Running Under Edsd Ii Mzn, Under the work area of Executive Engineer, Electricity Distribution Division-I, Muzaffarnagar Subordinate Subdivision Officer, Electricity Distribution Subdivision-II, Muzaffarnagar, under the Deposit Scheme, as per the application made by the applicants through Jhatpat/Nivesh Mitra portal, domestic light fan/commercial/industrial and other category electricity connections, the works like construction of HT/LT line with double pole and shifting of installed line/electric pole and other electrical material to other place etc. should be done through running contract through an external agency. Sl. No. Item Description 1 The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km) 2 25 KVA Distribution Transformer 3 63 KVA Distribution Transformer 4 100 KVA Distribution Transformer 5 250 KVA Distribution Transformer 6 PCC Pole 8.5/9.0 Meter 7 STP Pole 11 Meter 8 STP Pole 13 Meter 9 ACSR Weasel Conductor 10 ACSR Dog Conductor 11 ACSR Rabbit Conductor 12 LT PVC Cable 3.5x70/150/240/400 mm 13 11 KV XLPE Cable 3x70 Sqmm 14 11 KV XLPE Cable 3x120 Sqmm 15 11 KV XLPE Cable 3x185 Sqmm 16 11 KV XLPE Cable 3x300 Sqmm 17 LT ABC 1x16+1x25 Sqmm 18 LT ABC 3x50+1x35+1x16 Sqmm 19 LT ABC 3x95+1x70+1x16 Sqmm 20 LT ABC 3x120+1x95+1x16 Sqmm 21 1Ph Distribution Box 22 3Ph Distribution Box 23 11 KV FUSE SET 24 11 KV CT/PT Combiend Unit Required as per Size 25 11 KV PILFER RESISTANT Meter Cubical Required as per Size 26 11 KV Outdoor Jointing Kit Required as per Size 27 11 KV Indoor Jointing Kit Required as per Size 28 33 KV METERING CUBICAL UNIT Required as per Size 29 33 KV CT/PT METERING POLE MOUNTED UNIT Required as per Size 30 33 KV Outdoor Jointing Kit Required as per Size 31 33 KV Indoor Jointing Kit Required as per Size 32 LINE MATERIAL (Insulator, Disc, X-Arm, ANGLE, CHANNEL ETC.) 33 Complete work of installing the electrical material received from the store center at the site. 34 Complete work of Laying/Installing ACSR WEASEL CONDUCTOR on the established electric poles installed as per RESPO norms. 35 Complete work of Laying/Installing ACSR DOG CONDUCTOR on the established electric poles installed as per RESPO norms. 36 Complete work of Laying/Installing ACSR RABBIT CONDUCTOR on the established electric poles installed as per RESPO norms. 37 Complete work of 11 KV XLPE CABLE 3x70 Sqmm on the established electric poles installed as per RESPO norms. 38 Complete work of 11 KV XLPE CABLE 3x120 Sqmm on the established electric poles installed as per RESPO norms. 39 Complete work of 11 KV XLPE CABLE 3x185 Sqmm on the established electric poles installed as per RESPO norms. 40 Complete work of 11 KV XLPE CABLE 3x300 Sqmm on the established electric poles installed as per RESPO norms. 41 Complete work of LT ABC 1x16+1x25 Sqmm on the established electric poles installed as per RESPO norms. 42 Complete work of LT ABC 3x50+1x35+1x16 Sqmm on the established electric poles installed as per RESPO norms. 43 Complete work of LT ABC 3x95+1x70+1x16 Sqmm on the established electric poles installed as per RESPO norms. 44 Complete work of LT ABC 3x120+1x95+1x16 Sqmm on the established electric poles installed as per RESPO norms. 45 Complete work of Preparing the trench at the site and installing the cable as per RESPO norms. 46 Complete Work of Installing underground cable at the site as per RESPO norms. 47 Work of Fixing/Installing Single Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm. 48 Work of Fixing/Installing Double Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm. 49 Work of Fixing/Installing Single Pole of the STP Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm. 50 Work of Fixing/Installing Double Pole of the STP Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be provideby the Contractor/Firm. 51 Complete work of Installing and Commissioning 250 KVA Distribution Transformer on established Plinth as per RESPO standards. 52 Complete work of Installing and Commissioning 25 KVA Distribution Transformer on established Double pole as per RESPO standards. 53 Complete work of Installing and Commissioning 63 KVA Distribution Transformer on established Double pole as per RESPO standards. 54 Complete work of Installing and Commissioning 100 KVA Distribution Transformer on established Double pole as per RESPO standards. 55 25 KVA distribution transformer installed at the site was safely unloaded and the complete work of commissioning the transformer was installed on the established Double Pole prepared at the shifting place as per RESPO standards. 56 63 KVA distribution transformer installed at the site was safely unloaded and the complete work of commissioning the transformer was installed on the established Double Pole prepared at the shifting place as per RESPO standards. 57 100 KVA distribution transformer installed at the site was safely unloaded and the complete work of commissioning the transformer was installed on the established Double Pole prepared at the shifting place as per RESPO standards. 58 Complete work of Making New plinth for 250 KVA Distribution Transformer as per RESPO standards. In which cement, sand and other necessary Decentralized material will be provide by the Contractor/Firm. 59 Complete work of Making New Fencing for 250 KVA Distribution Transformer as per RESPO standards. In which cement, sand and other necessary Decentralized material will be provide by the Contractor/Firm. 60 Complete work of Installing and Commissioning 33 KV CT/PT Pole Mounted Unit on established Double pole as per RESPO standards. 61 Complete work of Installing and Commissioning 33 KV METERING CUBICAL UNIT as per RESPO standards. 62 Complete work of Installing and Commissioning 33 KV Outdoor Jointing Kit as per RESPO standards. 63 Complete work of Installing and Commissioning 33 KV Indoor Jointing Kit as per RESPO standards. 64 Complete work of Installing and Commissioning 11 KV CT/PT Pole Mounted Unit on established Double pole as per RESPO standards. 65 Complete work of Installing and Commissioning 11 KV PILFER RESISTANT Meter Cubical as per RESPO standards. 66 Complete work of Installing and Commissioning LT 3P Distribution Boxas per RESPO standards. 67 Complete work of Installing and Commissioning LT 1P Distribution Boxas per RESPO standards. 68 Complete work of Installing and Commissioning 11 KV Outdoor Jointing Kit as per RESPO standards. 69 Complete work of Installing and Commissioning 11 KV Indoor Jointing Kit as per RESPO standards. 70 Complete work of Installing and Commissioning 11 KV Fuse Set as per RESPO standards. 71 Complete work of installation of Stay Set Complete on established Double pole & Single Pole of Line As per the RESPO standards. 72 Complete work of Pipe Earthing (upto Water Level) of established Distribution Transformer as per RESPO standards. 73 Complete work of Chemical Earthing of established Distribution Transformer as per RESPO standards. 74 Installing of Cross Arm as per RESPO standards. 75 Installing of Pin Insulator as per RESPO standards. 76 Installing of Disc Insulator as per RESPO standards. 77 Complete work of straightening slanted electric pole as per RESPO standards. 78 Complete work of Pole concreting on established Double Pole / Single Pole as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm. 79 Complete work of Earthing completing by establishing earthing road of Stablished Pole as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. 80 Complete work of guarding on the established Pole of the Line as per RESPO standards. by GI wire and MS angle as per size 81 Complete work of dismantling Line to be shifted as per RESPO standards from safety point of view. Electric poles/conductors etc. installed in the said line and necessary materials will be dismantled. There should be no damage to departmental material while doing the above work. 82 Complete work of Pulling / Resaging the Span wires by shifting the Line / Electric pole as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. 83 Complete work of cutting and pruning the branches of trees standing between the Line installed and shifting place/route. 84 Supply of NUT & BOLT as per RESPO standards 85 Supply of DEAD & CLAMP as per RESPO standards 86 Supply of LT CLAMP as per RESPO standards 87 Supply of SUSPENSION CLAMP as per RESPO standards 88 Supply of PIERCING CLAMP as per RESPO standards 89 Supply of TOP CLAMP as per RESPO standards 90 Supply of DP CLAMP as per RESPO standards 91 Supply of LT SHAKLE INSULATOR as per RESPO standards 92 Supply of X-ARM HOLDING CLAMP as per RESPO standards 93 Supply of F-CLAMP as per RESPO standards 94 Supply of GI PIPE 6DIA as per RESPO standards 95 SUNDRIES ITEMS 96 As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar. 97 25 KVA Distribution Transformer OLD & USED 98 63 KVA Distribution Transformer OLD & USED 99 100 KVA Distribution Transformer OLD & USED 100 LINE MATERIAL (Insulator, Disc, X-Arm, ANGLE, CHANNEL ETC.)OLD & USED

Key Value

Document Fees
INR 3540 /-
EMD
INR 25000.0 /-
Tender Value
INR 25 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail