Works Contract To Carry Out The Erection Of Poles, Dts And Other Extension Works In Elumathur Sub Division Of South/Erode Division , Excavationofpolepit Size Of 2X2x6 Upto 27 Pole By Using Jcb Or Manual , Excavation Of Stay Pit 4.5 To 5 By Using Jcb Or Manual , Excavationofpolepit Size Above 8 Mts Psc/Rcc/Rsj Pole By Using Jcb Or Manual , Excavation Of Pit In Hard Rock Requires Without Blasting(Where Houses Are Located) , Erection Of Rcc Poles/Psc Poles /Metal Poles Upto 27(8.0M) Pole By Using Jcb Or Manual , Erection Of Rcc Poles/Psc Poles/Metal Poles Above 8 Mtrspole By Using Jcb Or Manual , Erection Of Rsj ,Rail And Fabricated Poles Above 9.0M Pole By Using Jcb Or Manual , Erectionof Stay Set Complete , Fixingof Ht V Cross Arms (All Types)/Channel Cross Arms/Guarding Cross Arms , Fixingof Lt 3 Phase Cross Arms , Fixing Of Lt Single Phase Ph X Arm , Fixing Of Ht/Lt Ti Fittings , Fixing Of Ht Pin Insulator 11 Kv/22 Kv , Fixing Of Ht Pin Insulator33 Kv , Fixing Of Ht 11Kv Strain Disc , Fixing Of Ht 22Kv Strain Disc , Fixing Of Lt Pin Insulators , Fixing Of Lt Shackle With Mp , Fixing Of Aluminium Knob , Earthing Of Pole With Pin Including Burying ,Looping And Binding , Paving Of Conductor, Stringing, Binding, Jumpering Etc., Complete For Lines With Acsr 7/4.09 Mm , Paving Of Conductor, Stringing, Binding, Jumpering Etc., Complete For Lines With Acsr 7/3.35 Mm Or Aaac 7/3.15 Mm Conductor , Paving Of Conductor, Stringing, Binding, Jumpering Etc., Complete For Lines With Acsr 7/2.59 Mm Or Aaac 7/2.50Mm Conductor , Structure Concreting ,Concreting Of Poles With Size (2X2x6) Including Cost Of Cement ,Jelly And Sandwith A Mixture Of 1:3:6And Plastering Of Concrete With Ratio 1:2 , Sleeveconcreting With Size (2X2x3) Including Cost Of Excavation Cement ,Jelly And Sandwith A Mixture Of 1:3:6And Plastering Of Concrete With Ratio 1:2 Including Materials , Stay Concreting Of Stay With Size 1.5 X 1.5 X 3.0 Including Cost Of 40Mm Cement,Jelly And Sand (With Supply) With Mixture 1:3:6 Along Sleeve Concreting And Plastering Of Concrete Portion Above The Ground Level With Ratio 1:2. , Erectionofdouble Pole Transformerstructure Completeinclusive Of Following Works -Excavation Of Pole Pits Sizing 2 X 2 X 6(2*475), Erection Of Poles(2*550), Excavation Of Stay Pits (4*390) And Erection Of Stay Set (4*210), Erection Of Structure Materials (Top Channel-Rs.250, Bed Channel-Rs.250,Cross With Stud For Bed Channel-Rs.120, Belting Angle-Rs.250) Erection Of Ab Switch (Rs.1000), Hg Fuse (Rs.600) Structure Earthing Complete (Rs.2100), Fixing Of Open Type Fuse Units And Feeder Arrangements(Rs.900), Ht/Lt Las Fixing(Rs.350 And Rs.250) , Provision Of Bus-Bar Arrangement(Rs.500), Jumpering(Rs.400) Fixing Of Support Inculator Angle And Erection Of Of 3 Nos Pin Insulators ( Rs.200) ( All T&P Suchas Crowbars, Siling, Dshackle Etc., That Must Be Brought By The Contractor)(Labour For Structure Concreting, Stay Concreting,Painting, Fixing Of Name Board / Danger Board, Erection Of Transformer, Transporting Of Transformer , Fixing Of Dt Meter ,Drilling Of Holes, Cutting,Welding,Alteration Of Clamps If Anyand Provision Of Earth Pit Collars Are Separately Given). , Dismantling Of Double Pole Transformer Structure Complete- Inclusive Of Following Dismantling Work Pole 2Nos,Stay Pit 4 Nos, Stay 4Set,Structure Materials , Ab Switch, Hg Fuse Set E, Structure Earthing Complete,Earth Pits ,Earth Tubs ,Earth Pipes,Feeding Arrangements With Open Type Fuse Unit,Ht/Lt Las ,Jumbers Complete,Support Insulator,Ltbus Bar Arrangements And Danger Board.( May Be Claimed Seperately For Any Extra Works)(All T&P Such As Crowbars,Silling, Dshackle Etc That Must Be Brought By The Contractor) , Erection Of Double Polestructure (D.P)- Inclusive Of Following Works -Excavation Of Pole Pits Sizing 2 X 2 X 6(2*475), Erection Of Poles(2*550), Excavation Of Stay Pits (4*390) And Erection Of Stay Set (4*210), Erection Of Structure Materials (Top Channel-Rs.250) Erection Of Ab Switch (Rs.1000),Structure Earthing Complete (Rs.1500), Ht Las Fixing(Rs.350 ) ,Jumpering (Rs.250) (All T&P Suchas Crowbars, Siling, Dshackle Etc., That Must Be Brought By The Contractor)(Labour For Structure Concreting, Stay Concreting,Painting, Fixing Of Name Board/Danger Board,(Drilling Of Holes, Cutting,Welding,Alteration Of Clamps If Anyand Provision Of Earth Pit Collars Are Separately Given) , Dismantling Of Double Pole Structure (D.P)Completeinclusive Of Following Dismantling Work- Poles, Stay Set Complete,Structure Materials , Ab Switch,Structure Earthing Complete,Earth Pits ,Earth Tubs ,Earth Pipes,Ht Las ,Jumbers Complete,Support Insulator And Danger Board.( May Be Claimed Seperately For Any Extra Works) (All T&P Such As Crowbars,Silling, Dshackle Etc That Must Be Brought By The Contractor) , Erection Of Single Pole Transformer Structure-Inclusive Of Following Works -Excavation Of Pole Pit Sizing 2 X 2 X 6(1*475), Erection Of Poles 1*550), Excavation Of Stay Pits (1*390) And Erection Of Stay Set (1*210), Erection Of Structure Materials (Tapping Channel-Rs.150, Transformer Centre Set Arrangements-Rs.350) Erection Of Ab Switch (Rs.900), Hg Fuse (Rs.400) Structure Earthing Complete (Rs.2000), Fixing Of Open Type Fuse Units And Feeder Arrangements(Rs.450), Ht/Lt Las Fixing(Rs.350 And Rs.250) ,Jumpering(Rs.300)(All T&P Suchas Crowbars, Siling, Dshackle Etc., That Must Be Brought By The Contractor)(Labour For Structure Concreting, Stay Concreting,Painting, Fixing Of Name Board/ Danger Board.Erection Of Transformer,Transporting Of Transformer, Lt Cable Arrangements, Fixing Of Dt Meter. Drilling Of Holes, Cutting,Welding,Alteration Of Clamps If Anyand Provision Of Earth Pit Collars Are Separately Given) , Dismantling Of Singlepole Transformer Structure Complete -Inclusive Of Following Dismantling Works - Pole, Stay,Structure Materials ( Tapping Channel, Transformer Bed Structure) , Ab Switch , Hg Fuse,Structure Earthing Complete With 3 Pits And Earth Loops, Mcd Box, Ht/Lt Las, Ht Jumpers Complete, Lt Cable Arrangement Anddanger Board..( May Be Claimed Seperately For Any Extra Works) (All T&P Such As Crowbars,Silling, Dshackle Etc That Must Be Brought By The Contractor) , Guarding Arrangements With Flat Guarding Including Fixing Of 2Nos. Cross Arms Ht/Lt , Transportofpoles/Materials/ Conductors /Dt/Metering Set Andothermaterials( Excludingloading Andunloadingcharges.) Below 8 Kms , Transports Of Poles /Materials /Conductors And Other Materials(Excluding Loading And Unloading Charges) For Above 8 Kms For Addl. Kms( Irrespective Of Weight In Tonage/Km , Loadingofmetal Poles ( All Sizes) , Loadingofpoles Up To 8 Mrcc/Psc Poles , Loadingofpoles Above 8 Mrcc/Psc Poles , Unloadingofpoles Up To 8 M Rcc/Psc Poles , Unloadingofpoles Above 8 M Rcc/Psc Poles , Unloadingofmetal Poles ( All Sizes) , Transporting Of Poles From Road Side To Pole Pit Location Including Loadingand Unloading Of Polesby Using Jcb Or Manual Up To 100 M , Transporting Of Poles From Road Side To Pole Pit Including Loadingand Unloading Of Polesby Using Jcb Or Manual Above 100 M , Loadingorunloadingoftransformer Upto100 Kvaand Metering Set , Loadingorunloadingoftransformer Above100 Kvaand Up To 200 Kva , Loadingorunloadingoftransformer Above 200 Kva , Resagging Of Ht/Lt Line With Acsr 7/4.09Mm , Re-Sagging Of Ht / Lt Line With Acsr 7/3.35Mm Or Aaac7 /3.15 Mm Conductor , Re-Sagging Of Ht / Lt With Acsr 7/2.59Mm Or Aaac 7 /2.50 Mm Conductor , Erection Of Street Light Including Fixture Fitting , Erection Of Street Light Service , Agriculture Service Fixing/Service , Releasing Of Grills From Rcc Poles , Releasing Of Hts Wire From Psc Pole , Erection Of New Transformer For All Capacities And Ht Metering Set , Releasingofsingle Phaseservicewire And Re-Fixing. , Releasingof3 Phaseservice Wire(Upto 50 Hp) And Re-Fixing. , Releasingof3 Phaseservice Wire (Above 50 Hp) Andre-Fixing. , Labourchargesforalterationof Back Clamps Tosuitfortheworks , Labourchargesforalterationof Stay Clamps Tosuitfortheworks , Releasingofacsr/Aaacconductors Fromconductordrumandcoiling Acsr 7/3.35, 7/2.59, Aaac7/2.50, 7/3.15 Mm (Per/Km.) , Cutting Of Coconut Leaves /Per Tree , Cleaning Of Branches Of Treeper Tree , Drilling Of Hole In Channel Only 3/4 & 1 Per Hole , Cutting Of Flat , Cutting Of Channel , Cutting Of Angle , Cutting Of Pipe , Dismandling Of Pole Above 8.0 Mtr , Dismandling Ofpoleup To 8.0 Mtr , Dismandling Of V X Arm(All Types),Channel X Arm,Guarding X Arm , Dismandling Of Lt 3 Phase X Arm , Dismandling Of Lt Single Phase X Arm , Dismandling Of Ht/Lt Ti Fitting , Dismandling Of 11Kv Strain Disc , Dismandling Of 11 Kv/22Kv Pin Insulator , Dismandling Of33 Kv Pin Insulator , Dismandling Of Lt Shackle , Dismandling Of Lt Pin Insulator , Dismandling Of Aluminium Knob , Dismandling Of Stay Set , Dismandling Of Acsr 7/3.35Mm Oraaac7/3.15 Conductor , Dismandling Of Acsr 7/2.59Mm Or 7/2.11Mm Conductor , Dismandling Of Street Light Service , Loading Of Materials , Unloading Of Materials , Leading And Stacking Of Materials , Dismandling Of Mvl/Svl Fitting , Dismandling Of 1X40w Ftlfitting , Provision Of Earth Pit Collar , Fixing Of Danger Board , Painting Ofall Clamps And Other Materials And Painting Of Structure Pole For Double Pole Structure. , Painting Ofall Clamps And Other Materials And Painting Of Structure Polefor Single Pole Structure , Painting Ofall Clamps And Other Materials And Painting Of Structure Pole For Dp Structure , Base Concreting Of Transformer Structure , Lt Cable Arrangements , Provision Of Distribution Transformer Name Board, ( Name Of The 22/11 Kv Feeder , Name Of The Ss , Capacity Of The Dt).