Tender For Fabrication And Erection Work In Different House For Season 2024-25, Making cover of mill roller and pinion of TRPF roller. Cane Unloader Secondary Cane Carrier Rack Carrier Baggage Elevator and R. B.C. Removing the neck runner and installing a new one. Cane Unloader Secondary Cane Carrier Rack Carrier Baggage Elevator and R. B.C. Removing the throat angle channel and installing a new one. Reinstallation of wet boot of secondary can carrier inter rack carrier. Cut out the melted watm and side plates of the fiberizer and install new ones. Replacement of gully plates of side/bottom of can carrier inter rack carrier secondary carrier and giving trial. Removing corroded plates of juice tank and gutter and installing new ones. Removing the damaged broken rail of can unloader trolley/bridge and fitting new rail. Installing new top and bottom covers of TRPF. Removing the melted plate of double barrel shoot and juice tray and installing a new one. Remove the hood of the fiberizer and replace it with a new one. Making and fitting the cane leveler as per the hood size of the cane cutter. Repairing old rack carrier racks Rack Carrier Fabrication of new rack of secondary can carrier Strengthening of Cane Carrier Column/Pillar, Making new fitting of claw beam of can unloader and giving trial. Reinstalling the bent cone of the juice tank. Balding the teeth of the count pinion and preparing them as per the template. Hard facing of TRPF top and bottom rollers. Giving a trial by refurbishing the neck top/watm cover of the ID fan. Cutting out the damaged part of the adsorption tower of juice sulfite and installing a new one and giving allic proof trial. Cutting out cones from different bottles 8/10 M.S. make a plate and give a trial Cutting out the gully body of the mud mixer and giving a trial. make a new one Penns alley: cutting out ammonia coil, making a new one, installing it, giving trial Quad/Pan Throat Vapor/Exhaust Pipe Removal New 8 mm. Making a plate and giving it a trial Cutting out the neck part of the cyst and vacuum cyst and making a new one. Cutting out weak syrup/molasses tanks 6/8 M.S. Making new/old plates/making angles Strengthening All connections Cutting out the hoppers gully, making a new one, and giving it a trial. Cutting and straightening old plates from various equipment. Dismantling and placing gully pipe lines from 1.5 cm dia to 30 cm dia at the designated place. Making platforms by straightening old plates at various stations. Making enlarged drums of links and side plates of cane carrier SRC rack carrier bagasse elevator and bagasse carrier as per size. Removing the leaking tubes of Semi-Keshner Vaporcell, Juice Deter Vaporline Juice Deter and Quad Installing new tubes and doing hydraulic testing Removing the weak after burner of sulfur furnace and replacing it with a new one. Patching the weak plate of inner space of quad and pan calandria and giving leak proof trial. Penns alley: cutting out ammonia coil, making a new one, installing it, giving trial Dismantling and replacing valves above 30 cm diameter. Cutting out melted plate of any equipment and patching it with old/new plate. Removing the mesh/catcher of the strainer of the juice pump and installing a new mesh. Removing the faulty double beat valve of the juice heater, installing the new valve and giving it a trial. Cutting out the weak partition plate of the juice heater and installing a new one and giving it a trial. Replacing the gully plate of a juice/water weighing scale Cutting out the condensate bottles of juice heater/quad, making new ones and making related connections, giving leak proof trial. Cutting and removing the rubber strip ring of the juice heater, installing the grinder, installing the rubber seat by installing the strip and giving the electric proof trial. Cutting out the weak dader shell of a juice heater Maintaining the label from 10 mm plate Installing the partition plate Making the tube for the rubber strip Cutting out the narrow part of the juice gutter vapor portion of the semi-conditioner and installing a new one. Removal and replacement of damaged catcher of quad and semi-circulator. make and install Cutting out the hardened shell of syrup/juice, making a new one and giving it a trial. Cutting out the coil of juice sulfiter and removing it, making a new one and installing it and giving it a trial. Removing the entire corroded door / gravers valve tray, making a new one, and giving a leak proof trial. Removing half of the rotten metal tray of door/graver, making a new one, and giving a leak proof trial. Cutting out the neck of the gravers umbrella and fitting it with a new plate. Cutting out the shell of door/gravers gully body 6/8 M.S. Making a new plate and installing it, making all the connections and making a manhole Cutting out the mudwood of the door and making a new one and giving it a trial. Cutting out the door/gravers intermediate tray and installing it with a new plate. Mud from door/graver/juice over flow box side/cut out the melted plate and remove it, make a new one and give it a trial. Replacement of sulfur furnace cooler pipe Removing the old cooler installed on the sulfur furnace and installing a new one and giving it a trial. Remodeling the sulfur furnace melter and installing it after hydraulic testing and giving it a trial. Changing the gully body of the sulfur furnace and giving it a trial by making it from a new plate. Dismantling and removing all three sulfur furnaces and their coolers etc. and fitting them back to their respective places after the platform is built. Clarifier / gravers alley Cutting out the juice coil Making a new coil and installing it Giving a trial Juiceheater Quad: Cutting out juice/syrup coil, making new one and installing it, giving trial. Removing the old chimney fitted in the Baugsils, Cyclones, Door Graver Syrup and Juice Sulphiter and making a new one of the size as per the instructions. Cutting out the stuck mud agitator of the vacuum filter and installing a new one and giving it a trial. Necessary patching by cutting out the weak part of the clarifier/graver compartment. Removing the screw conveyor from the mud mixer and installing a new one. Cutting out the umbrella fitted in the quad, making it according to size and giving it a trial. Semiconductor VaporCell, cutting out the core of the quad, refurbishing it, and giving it a trial. Remove the weak shell and top portion of the semi-conditioner and replace it with new 8/10 M.M.M.S. Make all connections by making plates and making them leak proof. Removing the scraper arm of the clarifier/graver, making a new one, and giving it a trial. Repairing and trialling the scraper arm of clarifier/graver. Removing the top cone from the vapor space of a semi-condenser vapor cell, refurbishing it, and testing it. Cutting and removing melted filter bottle of vacuum filter M.S. make a new plate and give a trial Removing the vapor box of the vapor space of a semi-conditioner and installing a new one. Staging of quad/vacuum filter/sulphur furnace/juice deaerator Strengthening of beam Placing weak beam as per instructions Giving trial Cutting out the weak discharge cone of the pan and 6 mm. M / s. Make a new one and install it using a plate. Pan shell has 8 inches width, 12 mm. Make a ring from the plate and apply it. Exhaust/Vapor Pipe on Pan/Quad 600mm/800mm Dia dismantled to 8 mm. Make a new one from the plate and install it. Cutting out the neck/top cone of the pan, placing it in the prescribed place, making a new one, and installing it, giving it a trial. Cutting out the feed pipe of the pan, putting the old one in the scrap yard, making a new one and installing it. Cutting out the weakly stuck mascot gutter of Pan Crystallizer, making a new one and giving it a trial. Removing the leaking tube of the pan and fitting a new tube in its place and giving a hydraulic trial. Cutting the umbrella fitted in the pan, making it according to size and installing it, giving support, giving trial To cut apart the fried sevaal from the pan, to prepare a new one, to give it a trial To remove the broken feed distributor turtle from the pan, to make a new one, to provide support, to give trial Strengthening the pan with angles/channels to strengthen it internally and externally. Removing the weak plates/angles etc. inside the pan wall and fitting new plates with angles. Fitter by removing weak plates/angles etc. inside the external catcher of the pan and fitting new plates with angle. Cutting away the mascot discharge shoots of the pan is 6/8 mm. of M.S. Make a new one and install it using a plate. Making rings on exhaust pipes, stopping leakage, giving trial Removing neck band/nipple of vapor/exhaust pipe, fabricating it with new 8/10 mm plate, replacing it and giving it trial. 20m cutting out of 60 tonne pans water tank. Make a new M plate and give it a trial. Removing the shell of 40 ton pan by cutting off the taper part, installing new 12/16 mm plate and giving trial. Cutting out the weak plate of down take of 40/60 ton pan and replacing it with 12/16 plate and giving trial. Cutting out the neck part of 40/60 ton pan shell and 12 mm. Make a new plate and give it a trial Removal and replacement of the neck part of the cyst and vacuum cyst. make and install Removing the stuck steam coils in syrup/molasses tanks and installing new ones. Cutting out the weak part of side plate/beam plate of syrup molasses tanks and installing new one and giving trial. Removing the top cone from the quad/pan, making a new one from 12 mm plate and installing it and giving it a trial. Removing the defective oil guard of the crystallizer and installing a new one. Cutting out the bad coils of the kit, making new ones, and giving a trial. Removing the broken arm of air cooled crystallizer, making a new one and giving it a trial. 8/10 mm by removing the weak external catcher of the pan. M / s. Make a new one from the plate and install it. Removal of hot and cold water over dead tank and 6/8 mm. M / s. Make a new one from the plate and install it. Removing the air waffle plate from the hopper and replacing it with a new plate and giving it a trial. Magma Mixture / Pug Mills Galli Wattam Plate should be cut and removed and a new one should be installed. Sentry) Removing, disassembling, cleaning and reinstalling the transient heater of the machine and giving it a leakproof trial. NK-1100/30 Degree Centrifugal Machine No. 6 was removed from its place and centrifugal machine no. 1s replacement and magma Removing the drive piece of the drum tray and installing a new one. Removing the broken shaft of magma mixture/pug mill, making a new one, fitting the arm, giving trial. Remodeling and trialling the broken molasses chamber of the Kanti machine. The weak cover of the continuous machine is 6/8 mm. M / s. Make a new one from the plate and install it. Remove the weak arm of the sugar melter and replace it with a new one. Cutting out the neck/weak part of the pan condensate tank and removing the 6/8 mm. M / s. Make a new one from the plate and install it. Repairing broken bucket of sugar elevator/dry shed elevator. Replacement of broken bucket of sugar elevator/dry shed elevator by using MS plate. Cutting out the super heater coil of the Sentry machine, making a new one, doing hydraulic testing, giving a trial. Super Heated Wash Water Bottle 12mm M / s. Installing new plate by plate and giving leak proof trial. The exhaust blower is supplied by M.S. Make a new one and install it using a plate. Cut out the weak casing of the exhaust blower and replace it with a new one. Strengthening the weak columns of Wyalig House plants by installing plates Fabrication/erection of 1.5 cm dia to 30 cm CAS T nipple reducer and band Dismantling of pipe lines above 30 cm diameter and placing them at the designated place, fabricating new ones and fitting them and leak proof trials. Erection by fabricating case, tee reducer nipple, band over 30 cm dia. Stenting of staging of various devices. Dismantling various round and rectangular tanks, refitting them with 6/8 mm SS plates and giving leak proof trials. Rebuilding various round and rectangular tanks with 6/8 mm MS plates and giving leak proof trials. Removing the gully nets of the bagasse and making new nets as before and installing them. Refurbishment of bagasse elevator bagasse carrier rack by angle, flat iron. Repairing old racks of bagasse elevator bagasse carrier. Bagasilo fan gets M.S. Make a new one and install it using a plate. Cutting out the flue/weak plate of boiler no. 3 And new 8/10 mm. M / s. new angle made from plate Boiler no. Cutting out the weak/weak columns and beams of 1, 2 and 3 and installing them as before. The mesh on the weight skewer installed on Boiler No. 3 has a weak angle, channel, M.S. Removing the plate by cutting it and making a new one using 6 mm plate. Cutting out the gully/weak plates of the bagasse feeders installed on Boiler No. 3 and 6 mm. M / s. Changing from plate. Dismantling of side fan and bank plates of boiler no. 1, 2 and 3 and installation of new and old plates. Strengthening by placing plates on both sides of the column/beam at the neck of the void and RBC. Cutting and removing 8 inch/10 inch diameter air pipe of FD inside the furnace of Boiler No. 1 and 2. New pipe as per previous instructions. Fabricating and installing the internal plate/mesh for boiler no. 1, 2 and 3 as per the previous procedure. Stenting the bagasse belt conveyor by applying agile and channel. Removing the air deaerator and economizer gully ducting of ID/FD fan of boiler no. 1, 2 and 3 and installing new ones. Remove the damper from the weight skewer and vailler ID/FD fan, economizer and install a new one and then run it. Boiler No. 3 by making new internal parts of wet skewers. Placement Corrugation/weak plates of wet skewers installed on boiler no. 1, 2 and 3 Cutting out is the new M.S. To apply to the plate. Removing the bent section cone of the ID fan and installing a new one. Removal of defective guide runner of bagasse carrier bagasse elevator and installation of new one. Remove the mesh installed in the S pit of the wet skewer of Boiler No. 1 and 2 and make a new frame and install the mesh. Dismantling work of old header and old branch pipe lines at spray pond. Dismantling of Cast Iron Branch Pipe Dia 6 with Flanges M.S. Construction and installation of a new pipeline. Dismantling of branch/pipe line dia 6 including flanges and bands. S.S. Fabrication/Fitting work of New Dadar, S.S. Fabrication / fabrication work of header. Remove all the nipples from the cold water tank and replace them with new ones. Removing the gully plate of Dot/Cold Water Over Dead Tank and available 6/8 M.M. plate installation Cutting out the neck part of the injection header New 8/10 mm. make from plate The weak part of the suction pipe of injection/spray should be 6/8 mm. M / s. Make a new one and install it using a plate. Remove the weak mesh of the injection/spray suction pipe and replace it with a new one. Giving satisfactory trial by repairing the aeration fan of ETP. Fixing the butt of the shaft of clarifier of ETP and giving it a trial. Repairing the stirrer of primary clarifier of ETP and giving satisfactory trials. The ditch/lane above the primary clarifier of ETP is M.S. Cutting out the plate and fitting a new plate. The ditch/lane above the secondary clarifier of ETP is M.S. Removing the plate by cutting it and fitting a new plate. Repairing and installing the stirrer of the secondary clarifier of ETP. Installing gate ball by making plate according to the size of drain. E.T.P. Fit the slip ring of clarifier as per size and install it. Dismantling the old fans of the aeration tank and installing new fans. Fabricating and fitting B-nose from plate Fabrication, erection of new pipe lines from 1.5 cm dia to 30 cm dia and providing leak proof tryon. Unloading the weak pipeline of bagsails M.S. fabricated by plate To fit it in place. Cutting and removing gully/weak side plate, watam/trough plate of bagasse elevator bagasse carrier and fitting it with new/old plate as per previous procedure. Taking out the nets of the bagasse along with the frame and making a new frame with an angle and making a sliding arrangement to take the net in and out. Cutting out 18 inch narrow/weak manhole at boiler station and installing new one. Fitting the bottom and bank plates of Boiler No. 3 with new/old plates of 6 mm and providing support by installing angles. Patching a wet skewer with a new/old plate Reinstallation of internal parts of the wet scrubbers installed on Boiler No. 1 and 2. Cutting out the dead ash shoots of Vayalar No. 1.2 and 3 and planting new ones. cutting out the weak part of the bagasse casing and installing a new one Cutting and fitting old flanges of 1.5 cm diameter to 30 cm diameter, fabricating and fitting them with new plates, dismantling of bulbs, valves. Removing and taking down the front plates of Boiler No. 1 and 2, repairing and refitting. Dismantling, fabrication, erection of structures at various stations. Making pump/motor beds of different sizes Making and installing 18 diameter manholes in various equipment Cutting out the old main hole of pan, vapor pipe, door graver and replacing it with a new plate. Making the body of exhaust valve of vapor cell/pan, leveling the sheet, fitting and giving trial. Removing the weak ammonia coil of quad pan and juice heaters, making it new as before and giving it a leak proof trial. Removing the old valve of quad vapor cell/semi-condenser and making a new one and installing it as before and giving a leak proof trial. Cutting the gully/weak plate of the valve fitted on the quad/vapour cell/semi-condenser and installing a new plate/straightening.