Supplying of materials, tools , plants and skilled and unskilled man power for repairing and maintenance of existing structure and fitting, fixing all works with operation & maintenance the entire works during Shrawani Mela-2024 atUdaypura to nearNawadih Health Sub Center ( Plant No.-05 toPlant No.- 07 ) under D.W & S. division , Deoghar.Group No.- Group-03-Cleaning of site, cutting bushes dressing and leveling do etc. all complete as per direction of E/I. 2 Dismantling R.C.C. work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. Plant No. - 06 3 Providing designation 75A one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. 4 Providing designation 75 A brick work in C.M. (1: 6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including, providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth curing, taxes and royalty all complete as per building specification and direction of E/I. 5 Reinforced cement concrete work in beams, suspended floor, roofs, having slope up to 15º landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centring, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone-III) : 3 graded aggregate 20mm nominal size) 6 Providing tor steel reinforcement of 8mm. dia. rods as per approved design and drawing excluding carriage of M.S. bars to work site , cutting, bending and binding with annealed wire with cost of wire, removal of rust placing the rods in position all complete as per building specification and direction of E/l. 7 Providing 6 mm cement plaster (1:4) in ceiling with clean coarse sand of F.M. 1.5 including cost of screening, curing with all leads and lifts of water, scaffolding, taxes and royalty all complete as per building specification and direction of E/I. 8 Providing 12 mm, cement plaster (1:6) with clean coarse sand of F.M 1-5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction E/I. 9 Providing P.C.C. M-150 in nominal mix of (1:2:4) in foundation with approved quality of stone chips 20 mm to 6 mm isgraded and clean coarse sand of F.M. 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, string, curing, taxes and royalty all complete as per building specification and direction of E/I. 10 Dismantling patent stone flooring including stacking serviceable materials in countable stacks within 15 M lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. 11 Providing 25 mm thick first class patent stone flooring (1:2:4) with stone chips,in two layers, bottom layer 19 mm thick (1:2:4) with 12 mm to 6 mm size graded stone chips and top layer 6 mm thick (1:2) with 6 mm down stone chips in panels,including cost of curing, finishing the surface smooth by rubbing with carborun-dum stone,taxes and royalty all complete as per building specification and direction of E/I. 12 Providing and laying 6mm . precast white glazed tiles in walls over 12mm cement mortar (1:3) and jointed white grey cement slurry flush pointed with white cement including rubbing , polishing and cost of curing taxes and reality all completed as per building specification and direction and of E/I.With commercial grade colour 15x15cm tiles. 13 Supplying, fitting and fixing vitreous white glazed earthen ware I.W.C. of Hindware make with 100 mm H.C.I. ‘p’ trapincluding supplying and fixing a pair of vitreous white glazed earthenware ware footrest to be fixed in floor etc. all complete as per specification and direction of E/I. 14 Cost towards transportation ofsubmersible pump, pipe fittings etc. from store to work site including carriage water tank etc. all complete. 15 Cost towards fitting & fixing submersible pump with clamp etc. all complete including lowering of PVC Pipe. 2 H.P to 7.5H.P and taking out after ending mela and deposited in departmental store deoghar. 16 Cost towards dismantling after mela and taking back to work site from store including carriage of all materials and pump, water tank etc. all complete. 17 Earth work in excavation for laying of pipe so as to give one meter (avg.) cover over the socket of pipe and back filling the trenches after laying of pipe, again a/w in excavation and taking out the laid pipeand back filling the same after the end ofShrawani Mela. 18 Earth work in back filling the trenches fatter laying different types and size of pipes with earth removed during excavation within initial lead and lift as per specification and direction E/I. 19 Laying of PVC pipes of approved make in trenches with red lead and yarn with socket and screw joints and cutting pipe so size and threading ends where necessary etc. all complete as per specification and direction E/I. (Pipes to be supplied departmentally free of cost) (i) 32 mm dia PVC pipe. 20 (i) 25 mm dia PVC pipe. 21 Laying of PVC pipes of approved make on wallwith red lead and yarn with socket and screw joints and cutting pipe so size and threading ends where necessary etc. all complete as per specification and direction E/I. (Pipes to be supplied departmentally free of cost) (i) 15 mm dia PVC pipe 22 (i) 20 mm dia PVC pipe 23 (ii) 25 mm dia dia PVC pipe 24 Cost towards engaging Pump Operatar cum Plumber etc.all complete job. Grade -II 25 Cost towardscleaning the RCC water storage tank over pump house having size 3 M x 3 M x 2 M including the cost of bleaching powder, jute, sacfolding etc. all complete. 26 Providing all tools like brooms/buckets, safety articles like mask,/hand gloves/cap/gum boots/apron etc to each cleaning worker all complete 27 Providing Electric high perusuure washer cleaner with pressure gun of minimum capacity of 1000 watt including service wire conncetion from nearest electric supply point includimg connection pipearrangement for water from exixting source with all plumbimg work for round the clock on hire basis for cleaning toilets / bathroon as perrequirement all complete for thirty das (ons of machine in each plant)as per specification and direction E/I 28 Supplying and fixing wall mounted stainless steelsoap with brassmade pump of 500 ml capacity all complete (two nos in each plant) as per specification and direction E/I 29 Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,having thermal stability for hot & cold water supply including all CPVCplain & brass threaded fittings This includes jointing of pipes & fittingswith one step CPVC solvent cement, trenching, refilling & testing ofjoints complete as per direction of Engineer in Charge. 15 mm nominal dia Pipes 30 25 mm nominal dia Pipes 31 32 mm nominal dia Pipes 32 PVC Shower rose 125 mm dia 33 15 mm PTMT bib cock 34 Providing two coats of snowcem of approved shade and make over old surface including washing, cleaning, sand papering the wall, scaffolding, curing and taxes all complete as per building specification & direction of E/I. 35 Providing onecoats of oil bound distemper of approved shade and make over a coat of cement primer over new surface including preparing the plastered surface by rubbingwith pumice stone or fine sand paper applying putty wherever required scaffolding washing of floors and taxes all complete as per building specification tionand direction of E/I. 36 SANITARY INSTALLATION Labour for scrapping old paint with paint remoter and below lamp as required on wooden or steel surface including cost of all labour and materials and scaffolding all complete as per balding specification and direction of E/I. 37 Providing one coat of painting with ready mixed paint of approved shade and make over steel surface including cleaning the surface toughly, scaffolding and taxes all complete as per building specification and direction of E/I. 38 Providing 12 mm, cement plaster (1:6) with clean coarse sand of F.M 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction E/I. 39 Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,having thermal stability for hot & cold water supply including all CPVCplain & brass threaded fittings This includes jointing of pipes & fittingswith one step CPVC solvent cement, trenching, refilling & testing ofjoints complete as per direction of Engineer in Charge. 15 mm nominal dia Pipes 40 25 mm nominal dia Pipes 41 Providing one coat of oil bound distemper of approved shade and make over a coat of cement primer over new surface including preparing the plastered surface by rubbing month with pumice stone or fine sand paper applying putty wherever required scaffolding washing of floors and taxes all complete as per building specification tionand direction of E/I. 42 Providing designation 75 A brick work in C.M.(1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm think mortar joints, cost of screening materials, raking out joints of 15mm depth, curing taxes and royalty all complete as per building specification and direction of E/I 43 Supplying, fitting and fixing 20 gauge G.C.I sheet gate fitted on M.S angle frame of size60*60*6 mm including cost of fabrication, providing necessary locking arrangement with haskal and domny duly fixed in C/C(1:2:4) blocks of required size, applying a priming red lead paint over steel work, taxes all complete as per drawing specification and direction of E/I 44 Supplying materials and labours for constructing inspection chamber of designation class 75B bricks size 750 mm deep, 600 x 450 mm internal dimension having 250 mm wall thickness in cement mortar (1:6) including 12 mm cement plaster (1:4) with punning on inside and cement plaster (1:6) with 600 x 475 mm G.I. Cover with frame (weight not less than 36kg.) alongwith earth work in excavation and 80 mm thick P.C.C. (1:3:6) in foundation and refilling all complete as per specification and direction of E/I. 45 provding and laying of 110 mm dia. P.V.C. pipe for outlet of water to outlet drain including all accessories ,I.e lubricants, solventcement, clamp, ring, sockets etc.(SUPREME S.W.R.) 46 Work of cleaning of toiletes,bathrooms & peripherial area of toilt/bathroom including collection of waste materials of plant/ peripheral area & storage of the of waste materials innearby dustbin/Nadeb including water supply from existing tubewell of plant by operation of pump including maintainave of toiltels/bathrooms including maintainance water supply system including ensuring proper light in bathroom/toilet and in peripheral area by providing required manpower like plumber, labour, seeper,electrician atdesignated plant (Saniary complex) including all tools and equipments etc. with including all required consumables material Phenyl, liquid toilet cleaner (Harpic ooor similar approved)bleaching powder, gloves, cap, Appron,gum boot broom, wiper, toilet cleaning bruss, bucket and mugs etc all complete work for 30 days round the clock for entire shrawani mela 2024 as per direction and satishfaction of Engineer-in-charge 47 Carriage ofall materials from store to work site and return back to work site to departmental store within a distance of 15KM . 48 Cost towards electric consumption charge for to be paid to Electricity Board during shrawani mela .payable JSEB 49 Providing and fixing HDPE container Syntex or alike one piecemolded water tank made out of low density polythyler andbuilt corrugation including of delivery up to destination hoisting and fixing of accessories such as inlet, outlet overflow of all tanks capacity 1000 litres Capacity Water storage Tank(DWSD. Item No- M-079 ) 50 Electric works electrical serviceson hire basis by providing exhoust fan in each toiletincluding operation & maintainance duringShrawani Mela 2024 for 31 days and taking out thesame after the mela under D.W. & S Division Deoghar,Temporary Electrical Wiring with 1.0 Sq mm wire inclung fixing and taking out all the materil after the mela of 31 days on hire basis including opration & maitainance in each bathroom/toilet all complete including switch as per specification and direction of E/I. 51 Providing & fixing of holder with 10 watt LED bulb and connection ofwire inclung fixing and taking out all the materil after the mela of 31 days on hire basis including opration & maitainance in each bathroom/toilet all complete including switch as per specification and direction of E/I. 52 Providing & fixing of exhoust fan of minimum 9 inch dia and connection ofwire inclung fixing and taking out all the materil after the mela of 31 days on hire basis including opration & maitainance in each bathroom/toilet all complete including switch as per specification and direction of E/I. 53 Providing & fixing of 50 watt LED flood light and connection ofwireinclung fixing and taking out all the materil after the mela of 31 days on hire basis including opration & maitainance in each bathroom/toilet all complete including switch as per specification and direction of E/I. 54 Carriage of materials fromkiln site or quarry site to work site including contractor profit, loading, unloading, transportation, etc. all complete. Bricks up to 15 K.M. 55 Sand up to 15 K.M. 56 Stone chips up to 15 K.M. 57 Cement up to 15 K.M. 58 Add 18% GST Rs. 59 Add 1% Labour Cess Rs.