}

Rate Contract For Handling Of Material Such As Loading, Un-Loading, Carriage, Verification, Testing Of Dt’S And Stacking Of Line & Sub-Station Electrical Materials And Equipment At Ecsd Pampore, srinagar-Jammu And Kashmir

Government Departments has published Rate Contract For Handling Of Material Such As Loading, Un-Loading, Carriage, Verification, Testing Of Dt’S And Stacking Of Line & Sub-Station Electrical Materials And Equipment At Ecsd Pampore. Submission Date for this Tender is 08-07-2024. Electrification Work Tenders in srinagar Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

43777547
Rate Contract For Handling Of Material Such As Loading, Un-Loading, Carriage, Verification, Testing Of Dt’S And Stacking Of Line & Sub-Station Electrical Materials And Equipment At Ecsd Pampore
Open Tender
Indian
Jammu And Kashmir
Srinagar
08-07-2024

Tender Details

Rate Contract for handling of material such as loading, un-loading, carriage, verification, Testing of DT’s and stacking of Line & sub-station Electrical Materials and Equipment at ECSD Pampore-Unloading of Poles:- Poles:Unloading of Steel Tubular / Cement Poles by Manual/Mechanical means, Verification/testing of materialsand Stacking of same. 2 S.T.Poles 8 mtr 3 S.T.Poles 9 mtr 4 S.T.Poles 11 mtr 5 S.T.Poles 13 mtr 6 P.C.C. Pole 8 Mtr 7 Shifting of Poles:-Poles:shifting of Steel Tubular / Cement Poles by Manual/Mechanical means in order to create/clear the space in case it is not available for dumping of further incoming material and then proper stacking of material. 8 S.T.Poles 8 mtr 9 S.T.Poles 9 mtr 10 S.T.Poles 11 mtr 11 S.T.Poles 13 mtr 12 P.C.C. Pole 8 Mtr 13 Loading of Poles:-Poles:Carriage of Steel Tubular / Cement Poles by Manual/Mechanical meansfrom stacking site and loading of same on trucks. 14 S.T.Poles 8 mtr 15 S.T.Poles 9 mtr 16 S.T.Poles 11 mtr 17 S.T.Poles 13 mtr 18 P.C.C. Pole 8 Mtr 19 Unloading of Conductor:- Conductor:Unloading of ACSR Conductor drums by Manual/Mechanical means, Verification/testing of materialsand Storage of same. 20 ACSR 0.02Cond. (Squirrel)Avg. 11Km/Drum 21 ACSR 0.03 Cond.(Weasel)Avg. 8.0Km/Drum 22 ACSR 0.05 Cond.(Rabbit)Avg. 5.0Km/Drum 23 ACSR 0.1 Cond (Dog)Avg. 2.5Km/Drum 24 ACSR 0.15 Cond (wolf )Avg. 1.5Km/Drum 25 ACSR 0.2 Cond (Panther )Avg. 1.1Km/Drum 26 ACSR 0.4 Cond (zebra )Avg. 0.5Km/Drum 27 Shifting of Conductor:- ACSR Conductors:shifting of ACSR Conductor Drums by Manual/Mechanical means in order to create/clear the space in case it is not available for dumping of further incoming material and stacking of material. 28 ACSR 0.02Cond. (Squirrel)Avg. 11Km/Drum 29 ACSR 0.03 Cond.(Weasel)Avg. 8.0Km/Drum 30 ACSR 0.05 Cond.(Rabbit)Avg. 5.0Km/Drum 31 ACSR 0.1 Cond (Dog)Avg. 2.5Km/Drum 32 ACSR 0.15 Cond (wolf )Avg. 1.5Km/Drum 33 ACSR 0.2 Cond (Panther )Avg. 1.1Km/Drum 34 ACSR 0.4 Cond (zebra )Avg. 0.5Km/Drum 35 Loading of Conductor:-Carriage of ACSR Conductor Drums from Storage Site to Loading Site and Loading of same into Truck 36 ACSR 0.02Cond. (Squirrel)Avg. 11Km/Drum 37 ACSR 0.03 Cond.(Weasel)Avg. 8.0Km/Drum 38 ACSR 0.05 Cond.(Rabbit)Avg. 5.0Km/Drum 39 ACSR 0.1 Cond (Dog)Avg. 2.5Km/Drum 40 ACSR 0.15 Cond (wolf )Avg. 1.5Km/Drum 41 ACSR 0.2 Cond (Panther )Avg. 1.1Km/Drum 42 ACSR 0.4 Cond (zebra )Avg. 0.5Km/Drum 43 Unloading of Transformers:-Transformers: Unloading of Transformers by Manual/Mechanical means, Verification of materialsand Carriage to Storage site including Storage of same. 44 25- KVA S/R Transformers 45 63KVA Distb..Transformer 46 100 KVA S/R Transformer 47 200KVA S/R Transformer 48 250KVA S/R Transformer 49 400 KVA S/R Transformer 50 630 KVA S/R Transformer 51 6.3 MVA Power Transformer 52 10 MVA Power Transformer 53 Testing of Transformers:- carriage from storage site to testing site,testing of transformers for losses, carriage back upto stacking site & stacking of same. 54 25- KVA S/R Transformers 55 63KVA Distb..Transformer 56 100 KVA S/R Transformer 57 200KVA S/R Transformer 58 250KVA S/R Transformer 59 400 KVA S/R Transformer 60 630 KVA S/R Transformer 61 Shifting of Transformers:-Transformer:-shifting ofTransformers by Manual/Mechanical means in order to create/clear the space in case it is not available for dumping of further incoming material. 62 25- KVA S/R Transformers 63 63KVA Distb..Transformer 64 100 KVA S/R Transformer 65 200KVA S/R Transformer 66 250KVA S/R Transformer 67 400 KVA S/R Transformer 68 630 KVA S/R Transformer 69 6.3 MVA Power Transformer 70 10 MVA Power Transformer 71 Loading of Transformers:- Carriage of transformers from storage site to loading Site and Loading of same into Truck 72 25- KVA S/R Transformers 73 63KVA Distb..Transformer 74 100 KVA S/R Transformer 75 200KVA S/R Transformer 76 250KVA S/R Transformer 77 400 KVA S/R Transformer 78 630 KVA S/R Transformer 79 6.3 MVA Power Transformer 80 10 MVA Power Transformer 81 Unloading of PVC Cables:- Unloading of PVC Cable Drums by manual/ mechanical means. Verification/ testing of materials & carriage to storage site including storage of the same. 82 185 Sqmm 1 core PVC Cable 83 240 Sqmm 1 core PVC Cable 84 300 Sqmm 1 Core PVC Cable 85 ABC 120 mm Sq. 3.5 Core PVC Cable 86 120Sqmm 1-core PVC Cable 87 95 Sqmm 1-core PVC Cable 88 50 Sqmm 1-core PVC Cable 89 10 Sqmm 1-core PVC Cable 90 6 Sqmm 1-core PVC Cable 91 70 Sqmm 1-core PVC Cable 92 16 Sqmm 2-core PVC Cable 93 10 Sqmm 2-core PVC Cable 94 50 sqmm 1.1 grade ariel bunchedCable 3.5-core 95 35 sqmm 1-core PVC Cable 96 185 Sqmm 3.5 coreCable 97 Shifting of PVC Cables:- PVC cables:-shifting of PVC Cable Drums by Manual/Mechanical means in order to create/clear the space in case it is not available for dumping of further incoming material. 98 185 Sqmm 1 core PVC Cable 99 240 Sqmm 1 core PVC Cable 100 300 Sqmm 1 Core PVC Cable 101 ABC 120 mm Sq. 3.5 Core PVC Cable 102 120Sqmm 1-core PVC Cable 103 95 Sqmm 1-core PVC Cable 104 50 Sqmm 1-core PVC Cable 105 10 Sqmm 1-core PVC Cable 106 6 Sqmm 1-core PVC Cable 107 70 Sqmm 1-core PVC Cable 108 16 Sqmm 2-core PVC Cable 109 10 Sqmm 2-core PVC Cable 110 50 sqmm 1.1 grade ariel bunchedCable 3.5-core 111 35 sqmm 1-core PVC Cable 112 185 Sqmm 3.5 coreCable 113 Loading of PVC Cables:- Carriage of PVC Cable Drums from Storage Site to Loading Site and Loading of same into Truck 114 185 Sqmm 1 core PVC Cable 115 240 Sqmm 1 core PVC Cable 116 300 Sqmm 1 Core PVC Cable 117 ABC 120 mm Sq. 3.5 Core PVC Cable 118 120Sqmm 1-core PVC Cable 119 95 Sqmm 1-core PVC Cable 120 50 Sqmm 1-core PVC Cable 121 10 Sqmm 1-core PVC Cable 122 6 Sqmm 1-core PVC Cable 123 70 Sqmm 1-core PVC Cable 124 16 Sqmm 2-core PVC Cable 125 10 Sqmm 2-core PVC Cable 126 50 sqmm 1.1 grade ariel bunchedCable 3.5-core 127 35 sqmm 1-core PVC Cable 128 185 Sqmm 3.5 coreCable 129 Unloading of VCB,C&R Panels ,Isolators ,D.G , CTs ,PTs Sets:- VCB & C&R Panels:Unloading of 11KV VCB Panels by Manual/Mechanical means, Verification/testing of materials and Carriage to Storage site including Storage of same. 130 11 KV VCB Pannels (INCOMER) 131 11 KV VCB Pannels (out going) 132 11 Kv Isolators 133 33 Kv Isolators 134 33 KV CTs 135 33 KV PTs 136 33 KV C&R Pannel 137 33 VCB outdoor type 138 62.3/63 KV D.G Sets 139 100 KV D.G Sets 140 250 KV D.G Sets 141 Shifting ofVCB,C&R Panels ,Isolators ,D.G , CTs ,PTs Sets: - VCB & C&R Panels:-shifting of11KV VCB Panels by Manual/Mechanical means in order to create/clear the space in case it is not available for dumping of further incoming material. 142 11 KV VCB Pannels (INCOMER) 143 11 KV VCB Pannels (out going) 144 11 Kv Isolators 145 33 Kv Isolators 146 33 KV CTs 147 33 KV PTs 148 33 KV C&R Pannel 149 33 VCB outdoor type 150 62.3/63 KV D.G Sets 151 100 KV D.G Sets 152 250 KV D.G Sets 153 Loading ofVCB,C&R Panels ,Isolators ,D.G , CTs ,PTs Sets:-VCB & C&R Panels: Carriage of 11KV VCB Panels from Storage Site to Loading Site and Loading of same into Truck 154 11 KV VCB Pannels (INCOMER) 155 11 KV VCB Pannels (out going) 156 11 Kv Isolators 157 33 Kv Isolators 158 33 KV CTs 159 33 KV PTs 160 33 KV C&R Pannel 161 33 VCB outdoor type 162 62.3/63 KV D.G Sets 163 100 KV D.G Sets 164 250 KV D.G Sets 165 Unloading of Other key Materials:- Other key Materials: Unloading of below key materials by Manual/Mechanical means, Verification/testing of materialsand Carriage to Storage site including Storage of same. 166 Transformers Oil Fresh 167 Aluminum Ladders 168 Safety Helmets 169 11KV Horn Gap Fuse sets 170 11 KV Disc Insulators 171 11 KV Pin Insulators 172 LT Shackle Insulators 173 sundry Materials 174 Gang Operated Switches 11-KV 175 11-KV Lightining Arrestors 176 Polymer Disc Insulators 45/70 KN 177 Service Cable Anchoring Assembly 178 Suspension Anchoring Assembly 179 33-KV Pin Insulotors 180 Earting /Discharging Rods 181 Safety Shoes 182 Safety Belts 183 Shifting of other key Materials:-Other key Materials:-shifting of below key materialsby Manual/Mechanical means in order to create/clear the space in case it is not available for dumping of further incoming material and stacking of materials. 184 Transformers Oil Fresh 185 Aluminum Ladders 186 Safety Helmets 187 11KV Horn Gap Fuse sets 188 11 KV Disc Insulators 189 11 KV Pin Insulators 190 LT Shackle Insulators 191 sundry Materials 192 Gang Operated Switches 11-KV 193 11-KV Lightining Arrestors 194 Polymer Disc Insulators 45/70 KN 195 Service Cable Anchoring Assembly 196 Suspension Anchoring Assembly 197 33-KV Pin Insulotors 198 Earting /Discharging Rods 199 Safety Shoes 200 Safety Belts 201 Loading of other key materials:- Other key Materials: Carriage of material from Storage Site to Loading Site and Loading of same into Truck 202 Transformers Oil Fresh 203 Aluminum Ladders 204 Safety Helmets 205 11KV Horn Gap Fuse sets 206 11 KV Disc Insulators 207 11 KV Pin Insulators 208 LT Shackle Insulators 209 sundry Materials 210 Gang Operated Switches 11-KV 211 11-KV Lightining Arrestors 212 Polymer Disc Insulators 45/70 KN 213 Service Cable Anchoring Assembly 214 Suspension Anchoring Assembly 215 33-KV Pin Insulotors 216 Earting /Discharging Rods 217 Safety Shoes 218 Safety Belts 219 Unloading of Meters:-Meters:Unloading of Meters by Manual/Mechanical means, Verification/testing of materialsand Carriage to Storage site including Storage of same. 220 10-60 Amp. 1-Phase Energy Meters 221 20-80 Amp. 3-Phase Energy Meters 222 Shifting of Meters:- Meters:-shifting of Metersby Manual/Mechanical means in order to create/clear the space in case it is not available for dumping of further incoming material. 223 10-60 Amp. 1-Phase Energy Meters 224 20-80 Amp. 3-Phase Energy Meters 225 Loading of other key materials:- Other key Materials: Carriage of material from Storage Site to Loading Site and Loading of same into Truck 226 10-60 Amp. 1-Phase Energy Meters 227 20-80 Amp. 3-Phase Energy Meters 228 Unloading of Meter Boxes:-Unloading of Meter-Boxes by Manual/Mechanical means, Verification/testing of materialsand Carriage to Storage site including Storage of same. 229 Single Compartment Meter Boxes 230 4 in 1 Meter Boxes 231 Shifting of Meter Boxes:- -shifting of Meter Boxesby Manual/Mechanical means in order to create/clear the space in case it is not available for dumping of further incoming material. 232 Single Compartment Meter Boxes 233 4 in 1 Meter Boxes 234 Loading of Meter Boxes:- Carriage of Meter Boxes from Storage Site to Loading Site and Loading of same into Truck 235 Single Compartment Meter Boxes 236 4 in 1 Meter Boxes 237 Unloading of Pole Mounted Distrubution Boxes:-Unloading of Pole Mounted Distrubution Boxes by Manual/Mechanical means, Verification/testing of materialsand Carriage to Storage site including Storage of same. 238 Pole Mounted Distrubution Boxes 239 Loading of Meter Boxes:- Carriage of Meter Boxes from Storage Site to Loading Site and Loading of same into Truck 240 Pole Mounted Distrubution Boxes 241 Loading of Pole Mounted Distrubution Boxes:- Carriage of Pole Mounted Distrubution Boxes from Storage Site to Loading Site and Loading of same into Truck 242 Pole Mounted Distrubution Boxes 243 Unloading of LT Distrubution Boxes:-Unloading of LT Distrubution Boxes by Manual/Mechanical means, Verification/testing of materialsand Carriage to Storage site including Storage of same. 244 LTDB for 250 KVA X-mer (400-Amps) 245 LTDB for100 KVA X-mer(160-Amps) 246 LTDB for63 KVA X-mer(100-Amps) 247 LTDB for25 KVA X-mer(63-Amps) 248 Loading of other key materials:- Other key Materials: Carriage of material from Storage Site to Loading Site and Loading of same into Truck 249 LTDB for 250 KVA X-mer (400-Amps) 250 LTDB for100 KVA X-mer(160-Amps) 251 LTDB for63 KVA X-mer(100-Amps) 252 LTDB for25 KVA X-mer(63-Amps) 253 Loading of other key materials:- Other key Materials: Carriage of material from Storage Site to Loading Site and Loading of same into Truck 254 LTDB for 250 KVA X-mer (400-Amps) 255 LTDB for100 KVA X-mer(160-Amps) 256 LTDB for63 KVA X-mer(100-Amps) 257 LTDB for25 KVA X-mer(63-Amps) 258 Unloading of Earthing Rods (G.I)/ Spike Rods (G.I):-Unloading of Earthing Rods (G.I)/ Spike Rods (G.I) by Manual/Mechanical means, Verification/testing of materialsand Carriage to Storage site including Storage of same. 259 Earthing Rods (G.I) 260 Spike Rods (G.I) 261 Shifting of Earthing Rods (G.I)/ Spike Rods (G.I) -shifting ofEarthing Rods (G.I)/ Spike Rods (G.I)Manual/Mechanical means in order to create/clear the space in case it is not available for dumping of further incoming material. 262 Earthing Rods (G.I) 263 Spike Rods (G.I) 264 Loading of Earthing Rods (G.I)/ Spike Rods (G.I) - Carriage of Earthing Rods (G.I)/ Spike Rods (G.I) from Storage Site to Loading Site and Loading of same into Truck 265 Earthing Rods (G.I) 266 Spike Rods (G.I) 267 Unloading of Nuts & Bolts of Sizes/G.I Pins (11-KV/33KV)/ Guy Wire :-Unloading of Nuts & Bolts of Sizes/G.I Pins (11-KV/33KV)/ Guy Wire by Manual/Mechanical means, Verification/testing of materialsand Carriage to Storage site including Storage of same. 268 Nuts & Bolts of Sizes 269 G.I Pins (11-KV) 270 G.I Pins (33-KV) 271 Guy Wire 272 Shifting of Nuts & Bolts of Sizes/G.I Pins (11-KV/33KV)/ Guy Wire-shifting ofNuts & Bolts of Sizes/G.I Pins (11-KV/33KV)/ Guy Wire Manual/Mechanical means in order to create/clear the space in case it is not available for dumping of further incoming material. 273 Nuts & Bolts of Sizes 274 G.I Pins (11-KV) 275 G.I Pins (33-KV) 276 Guy Wire 277 Loading of Nuts & Bolts of Sizes/G.I Pins (11-KV/33KV)/Guy Wire - Carriage of Nuts & Bolts of Sizes/G.I Pins (11-KV/33KV)/ Guy Wirefrom Storage Site to Loading Site and Loading of same into Truck 278 Nuts & Bolts of Sizes 279 G.I Pins (11-KV) 280 G.I Pins (33-KV) 281 Guy Wire 282 Unloading of Stay Sets/Dead End Tension Fittings/G.I Structure/Wedge Connectors:-Unloading ofStay Sets/Dead End Tension Fittings/G.I Structure/Wedge Connectors by Manual/Mechanical means, Verification/testing of materialsand Carriage to Storage site including Storage of same. 283 Stay Sets 284 Dead End Tension Fittings 285 G.I Structure 286 Wedge Connectors 287 Spiral Earthing 288 T-Connectors for 11 KV ABC 289 Insulation Piercing Connectors of sizes 290 CMRI 291 HV Copper Metal Stems 12 mm 292 LV Copper Metal Stems 12 mm 293 LV Copper Metal Stems 20 mm 294 LV Copper Metal Stems 25 mm 295 LV Copper Metal Stems 30 mm 296 Shifting of Stay Sets/Dead End Tension Fittings/G.I Structure/Wedge Connectors-shifting ofStay Sets/Dead End Tension Fittings/G.I Structure/Wedge Connectors Manual/Mechanical means in order to create/clear the space in case it is not available for dumping of further incoming material. 297 Stay Sets 298 Dead End Tension Fittings 299 G.I Structure 300 Wedge Connectors 301 Spiral Earthing 302 T-Connectors for 11 KV ABC 303 Insulation Piercing Connectors of sizes 304 CMRI 305 HV Copper Metal Stems 12 mm 306 LV Copper Metal Stems 12 mm 307 LV Copper Metal Stems 20 mm 308 LV Copper Metal Stems 25 mm 309 LV Copper Metal Stems 30 mm 310 Loading of Stay Sets/Dead End Tension Fittings/G.I Structure/Wedge Connectors - Carriage of Stay Sets/Dead End Tension Fittings/G.I Structure/Wedge Connectors from Storage Site to Loading Site and Loading of same into Truck 311 Stay Sets 312 Dead End Tension Fittings 313 G.I Structure 314 Wedge Connectors 315 Spiral Earthing 316 T-Connectors for 11 KV ABC 317 Insulation Piercing Connectors of sizes 318 CMRI 319 HV Copper Metal Stems 12 mm 320 LV Copper Metal Stems 12 mm 321 LV Copper Metal Stems 20 mm 322 LV Copper Metal Stems 25 mm 323 LV Copper Metal Stems 30 mm 324 Clearing jungle including uprooting of rank vegitation , grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 meter above ground level and removal of rubbish up to a distance of 50 Meter out side the periphery of the reaa cleared. ( item vide approved SSR-2022) 325 Clearing jungle including uprooting of rank vegitation , grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 meter above ground level and removal of rubbish up to a distance of 50 Meter out side the periphery of the reaa cleared. ( item vide approved SSR-2022)

Key Value

Document Fees
INR 1000 /-
EMD
INR 60000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail