| 1 | Overhead 11 kV Line |
| 2 | 8.5 m/180 kgs PCC Poles (PCC Pole as per state practice) |
| 3 | Foundation of PCC Supports as per scope of works, cement concreting (1:3:6) (0.268 Cmt for each support) |
| 4 | Stone pad for supports as per scope of works & drawing (300x300x75 mm ) |
| 5 | 11KV V-Type Cross-arm (M.S Channel 75X40x6mm) welded with MS angel (50x50x6) (weight-10.37 kg) with bolts and nuts |
| 6 | Cross arm holding clamps (MS Flat-50x8 mm) (weight-1.33 kg) with bolts and nuts |
| 7 | F- Bracket MS flat (50x8 mm) (weight- 1.56 kg) with nut and bolts |
| 8 | Cut point top channel (100x50x6 mm) of length 230 mm along with nut & bolts |
| 9 | Cut point bottom channel (100x50x6 mm) of length 1150 mm along with nut & bolts |
| 10 | Tapping horizontal cross arm (100x50x6 mm) of length 1020 mm along with calmps (50x8) and nut and bolts |
| 11 | Tapping top channel (100x50x6 mm) of length 256 mm along with calmps(50x8) and nut and bolts |
| 12 | DP Top channel (Channel-100X50x6mm) 2240 mm longwith bolts and nuts |
| 13 | Horizontal Belting Angle (Angle-50x50x6 mm) 2240 mm long with bolts and nuts |
| 14 | Cross bracing Angle (Angle-50x50x6 mm) 2500 mm long with bolts and nuts |
| 15 | Belting clamp-Top clamp (Flat-50x8 mm) (weight 1.4 kg) with bolts and nuts |
| 16 | Belting clamp-Bottom clamp (Flat-50x8 mm) (weight 1.5 kg) with bolts and nuts |
| 17 | Fish plate for jumpering |
| 18 | 6/2.59 + 1/2.59 mm (30 sqmm Al. Area) ACSR weasel conductors |
| 19 | PG clamp for weasel conductor |
| 20 | Distribution tie for pin insulator |
| 21 | Jointing sleeves Aluminium |
| 22 | Aluminium binding wire and tape |
| 23 | 11 KV polymer Disc insulator 45 KN (B&S type) along with suitable hardware fittings |
| 24 | 11 KV Polymer Pin Insulators 5 KN with nuts |
| 25 | Earthing of pole by earthing coil (with Salt & Charcoal) |
| 26 | 8 SWG GI wire for pole,DB earthingwith GI nuts, bolts & washers |
| 27 | MS Danger board with Back calmps & nuts and boltsas per Technical specification |
| 28 | Anti-climbing device-1.5 kgs with supporting clamp, 2.5mm dia (12 SWG) galvanized barbed wire on each 11 kV support as per scope of works & TS |
| 29 | Numbering and scheme details on each pole as per Technical specification and scope of work |
| 30 | Road/Line Crossings |
| 31 | V-cross arm supporting channel (100x50x6 mm), 3000mm long with holding clamps, bolts and nuts. |
| 32 | 11KV V-Type Cross-arm for supporting channel (M.S Channel 75X40x6mm) welded with MS angel (50x50x6) (weight-10.37 kg) with bolts and nuts |
| 33 | Guarding Cross arm (75x40x6 mm) 2210 mm long with eye bolts (16mm dia) |
| 34 | Back clamp for guarding cross arm (50x8 mm) (weight- 1.15 kg)with nut & bolts. |
| 35 | Cross arm holding clamps (MS Flat-50x8 mm) (weight-1.33 kg) with bolts and nuts |
| 36 | 6 SWG GI wire along the span |
| 37 | 8 SWG GI wire across the span |
| 38 | 12 SWG GI wire for binding |
| 39 | Distribution transformers |
| 40 | 8.5 m/180 kgs PCC Poles (PCC Pole as per state practice) |
| 41 | Foundation of PCC Supports as per scope of works, cement concreting (1:3:6) (0.268 Cmt for each support) |
| 42 | Stone pad for supports as per scope of works & drawing (300x300x75 mm ) |
| 43 | Transformer Top channel (100x50x6mm) 2800 mm long and nuts & bolts |
| 44 | AB switch mounting channel (100x50x6mm) 2800 mm long with nuts & bolts |
| 45 | Back clamp for AB switch mounting channel(50x8mm)- (weight-1.8 kg) with nuts & bolts |
| 46 | DO fuse mounting channel (75x40x6mm) 2800 mm long with nuts & bolts |
| 47 | Back clamp for DO fuse mounting channel(50x8mm)- (weight-1.9 kg) with nuts & bolts |
| 48 | Transformer mounting channel (100x50x6mm) 2800 mm with nuts & bolts |
| 49 | Transformer mounting channel support (50x50x6mm) 500 mm long with Nuts & bolts. |
| 50 | Transformer Belting angle (50x50x6mm) 2800 mm longwith nuts & bolts |
| 51 | Transformer Belting angle support (35x35x6 mm)500 mm long with nuts & bolts |
| 52 | 11 KV polymer Disc insulator 45 KN (B&S type) along with suitable hardware fittings |
| 53 | 11 KV Polymer Pin Insulators 5 KN with nuts |
| 54 | 11/0.4 kV Distribution Transformer 25 KVA Three Phase aluminum wound DTR with high grade CRGO Core (Energy Efficiency Level-1 specified in IS 1180 (Part-1):2014 as per latest amendment 4 March 2021) |
| 55 | ACSR weasel counductor for Jumpering |
| 56 | Bimetallic connector for HT & LT side of the transformer |
| 57 | PG clamp for jumpering |
| 58 | LT Distribution box polyester sheet moulding compound (SMC) for 25 kVA Distribution transformer with arrangement of suitable bus-bars & MCCB\"s as per scope of works of SBD |
| 59 | Back clamp support for LTDB ( 65x8 mm) |
| 60 | 1Cx35 sqmm 1.1KV XLPE cable with suitable lugs and glands and cable ties |
| 61 | Clamps for LT service cable support |
| 62 | 9 kV, 5 kA distribution class LA |
| 63 | 11 kV, 3-ph, 200 A, 3 Pin type Vertical Mounting typeAB Switch along with Support Insulators, Base Channel, down Pipe, operating handle and support, etc. complete asper technical specifications, scope of works and approved drawings |
| 64 | 11 kV, 3-ph, Drop Out fuse Set (set of 3 units) along with Support Insulators, Base Channel, fuse barrel etc. complete asper technical specifications, scope of works and approved drawings |
| 65 | GI Earthing pipe of 40 mm dia & 3000 mm long as per IS 1161 |
| 66 | GI Flat (50x6 mm) |
| 67 | GI wire 8SWG |
| 68 | GI flat (25x3 mm) |
| 69 | MS Danger board with Back calmps & nuts and boltsas per Technical specification |
| 70 | Anti-climbing device-1.5 kgs, 2.5mm dia (12 SWG) galvanized barbed wire on each 11 kV support as per scope of works & TS |
| 71 | Numbering and scheme details on each pole as per Technical specification and scope of work |
| 72 | LT line |
| 73 | 8.5 m/180 kgs PCC Poles (PCC Pole as per state practice) |
| 74 | Foundation of PCC Supports as per scope of works, cement concreting (1:3:6) (0.268 Cmt for each support) |
| 75 | Stone pad for supports as per scope of works & drawing (300x300x75 mm ) |
| 76 | Single phase Glass Fiber Reinforced Polyester Sheet Moulding Compound (SMC) Pole top distribution box with calmps (40x3 mm) and nut & bolts |
| 77 | Three phase Glass Fiber Reinforced Polyester Sheet Moulding Compound (SMC)Pole top distribution box with calmps (40x3 mm) and nut & bolts |
| 78 | 2Cx25 sqmm XLPE aluminium conductor cable for single phase DB incomer |
| 79 | 4Cx35 sqmm XLPE aluminium conductor cable for Three phase DB incomer |
| 80 | Earthing of pole by earthing coil (with Salt & Charcoal) |
| 81 | 8 SWG GI wire for pole,DB earthingwith GI nuts, bolts & washers |
| 82 | Aerial Bunched XLPE Cable 1X25 (Ph) + 1X25 ( Bare messenger cum neutral) + 1x16 (insulated Street lighting) sqmm |
| 83 | Aerial Bunched XLPE Cable 3X50 (Ph) + 1X35 ( Bare messenger cum neutral) + 1x16 (insulated Street lighting) sqmm |
| 84 | LT pole clamp (50x8mm) (2.56 kg) with Nut and bolts |
| 85 | LT Eye hook |
| 86 | suspension clamp |
| 87 | Dead end clamp |
| 88 | Insulation Piercing connectors/Connector type-I (AB cable to AB cable) |
| 89 | Length of 2cx6 sqmm Service Armoured cable (in km.) |
| 90 | Insulation Piercing connectors type-II (AB cable to Service cable) |
| 91 | Stay Set (Galvanised) with 50x8 mm stay clamps, guy insulator , anchor plate (200x200x6mm) , nut bolts, 1 Nos turn-buckle, 1.8 m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI strandedwire complete as per technical specification, approved drawings and scope of work including foundation of stay support in each stay set as per scope of works |
| 92 | Stay Rod 16x1800 mm complete as per Technical specification, scope of work and tender drawing |
| 93 | Stay Wire 7/10 SWG |
| 94 | Stay Clamp- (Flat-50x8 mm) (weight-1.5 kg)with bolts and nuts |
| 95 | Stay Guy insulator LT |
| 96 | Stay Guy insulator HT (11 KV) |
| 97 | stay thimble |
| 98 | Hellically formed end fitting |
| 99 | Concreting of Stay Rod ( 0.2 cmt cement concreting in mixture (1:3:6) |