}

Tender For Balance Work Of Beautification Work At Bhoganipur Talab In Bhoganipur, Kanpur Dehat (U.P.), 1 Balance Work Of Beautification Work At Bhoganipur Talab In Bhoganipur, Kanpur Dehat (U.P.) 2 Cost Of Inerlocking Pathway With All Cost Of Material, kanpur-Uttar Pradesh

Uttar Pradesh Projects Corporation Limited has published Tender For Balance Work Of Beautification Work At Bhoganipur Talab In Bhoganipur, Kanpur Dehat (U.P.), 1 Balance Work Of Beautification Work At Bhoganipur Talab In Bhoganipur, Kanpur Dehat (U.P.) 2 Cost Of Inerlocking Pathway With All Cost Of Material. Submission Date for this Tender is 20-06-2024. Lake Development Tenders in kanpur Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43737296
Tender For Balance Work Of Beautification Work At Bhoganipur Talab In Bhoganipur, Kanpur Dehat (U.P.), 1 Balance Work Of Beautification Work At Bhoganipur Talab In Bhoganipur, Kanpur Dehat (U.P.) 2 Cost Of Inerlocking Pathway With All Cost Of Material
Open Tender
Indian
Uttar Pradesh
Kanpur
20-06-2024

Tender Details

Tender For Balance Work Of Beautification Work At Bhoganipur Talab In Bhoganipur, Kanpur Dehat (U.P.), 1 Balance Work of Beautification Work at Bhoganipur Talab in Bhoganipur, Kanpur Dehat (U.P.) 2 Cost of inerlocking pathway with all cost of material and labour work complete in all respects 3 Solar light 40 Watt (with supply and instalation) including all cost of material and labour work complete in all respects 4 Supply and instalation of steel wait Chair including all cost of material and labour work complete in all respects 5 Supply and instalation of Signages including cost of material and labour work complete in all respects 6 Supply of 125mm dia plain PVC(6kgsqcm) including all cost of material and labour work complete in all respects 7 Supply of 125mm dia Sloted plain PVC(6kgsqcm) pressureincluding all cost of material and labour work complete in all respects 8 Supply of PVC soket 125mm diaincluding all cost of material and labour work complete in all respects 9 Supply of end cap 125mm diaincluding all cost of material and labour work complete in all respects 10 Providing nesessery boaring T&P including making arrangement of water for boaring 200mm diabore hole by rig machine in all type of streta 30 m B.G.L 11 Providing nesessery boaring T&P including making arrangement of water for boaring 200mm diabore hole by rig machine in all type of streta Beyond 30m 12 Supply & fixing of nylon jalli around the slotted pipe including all cost of material and labour work complete in all respects 13 Lowering of 125mm dia rigid PVC in bore hole including cutting jointing all cost of material and labour work complete in all respects 14 Providing & packing of coarse sand aroundincluding all cost of material and labour work complete in all respects 15 Supply of 32mm dia G.I. pipe B class with required fittingincluding all cost of material and labour work complete in all respects 16 Supply of India mark-II hand pump ISI marked with cylinder & connection rodsincluding all cost of material and labour work complete in all respects 17 Installation of India-II hand pump over the bore hole as per direction of EIincluding all cost of material and labour work complete in all respects 18 Development of bore by manual labour till discharge of free from turbity complete item.including all cost of material and labour work complete in all respects 19 Supply and fixing of 4 seater swing (Jhula) including all cost of material and labour work complete in all respects 20 Supply and fixing of merry go round plate form 4 feet including all cost of material and labour work complete in all respects 21 External water supply aregement for 110mm PVC casing pipe of ISI mark slotted. including all cost of material and labour work complete in all respects 22 110mm PVC casing pipe of ISI mark plain including all cost of material and labour work complete in all respects 23 Nylon mesh for filter including all cost of material and labour work complete in all respects 24 Plastic dori including all cost of material and labour work complete in all respects 25 Solvent cement including all cost of material and labour work complete in all respects 26 110mm end cap including all cost of material and labour work complete in all respects 27 110mm submersible cap including all cost of material and labour work complete in all respects 28 50mm M.S. clamp (Heavy) including all cost of material and labour work complete in all respects 29 50mm G.I. elbow. including all cost of material and labour work complete in all respects 30 50mm X 110mm G.I. nipple including all cost of material and labour work complete in all respects 31 2 HP 9 stage submersible pump of ISI mark with automatic panel including all cost of material and labour work complete in all respects 32 10 sqm. 2 core submersible cable. including all cost of material and labour work complete in all respects 33 Drilling charges for 6 dia tubewell including all cost of material and labour work complete in all respects 34 2 M.S. socket. including all cost of material and labour work complete in all respects 35 Cartage of material upto site including all cost of material and labour work complete in all respects 36 E/W in excavation including all cost of material and labour work complete in all respects 37 P.C.C. in 1:4:8 under base including all cost of material and labour work complete in all respects 38 B/W in 1:6 in foundation including all cost of material and labour work complete in all respects 39 R.C.C.IN 1:4:8 SLAB including all cost of material and labour work complete in all respects 40 M.S.IRON WORK IN SLAB including all cost of material and labour work complete in all respects 41 B/W IN 1:4 IN WALL including all cost of material and labour work complete in all respects 42 20MM TH.C.PLASTER IN 1:3 including all cost of material and labour work complete in all respects 43 40MM TH.C.C.FLOORING IN BOTTAM including all cost of material and labour work complete in all respects 44 SUPPLY & FEBRICATION OF M.S.STEPS including all cost of material and labour work complete in all respects 45 500. MM DIA.C.I.COVER including all cost of material and labour work complete in all respects 46 C.I. COWEL including all cost of material and labour work complete in all respects 47 C.I. PLAIN BEND including all cost of material and labour work complete in all respects 48 C.I. SINGLE EQUALPLAIN JUNCTION including all cost of material and labour work complete in all respects 49 E/W IN EXCAVATION. including all cost of material and labour work complete in all respects 50 P.C.C.IN 1:4:8 UNDER BASE including all cost of material and labour work complete in all respects 51 B/W IN 1:6 IN FOUNDTION including all cost of material and labour work complete in all respects 52 R.C.C.IN 1:4:8 SLAB including all cost of material and labour work complete in all respects 53 M.S.IRON WORK IN SLAB including all cost of material and labour work complete in all respects 54 SUPPLY & FILLING OF BRICK BALLAST including all cost of material and labour work complete in all respects 55 SUPPLY & FILLING OF C. SAND including all cost of material and labour work complete in all respects 56 GST Extra as per applicable

Key Value

Document Fees
INR 5900 /-
EMD
INR 62000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail