Tender For Supply Of The Construction Materials Used In The Development Works Like Dhula Sand, Gol Bajri, Agg 10, 20, 40 Mm, Stone Dust Rate Per Cubic Foot, Brick First Grade Per Thousand, Wheeler Loading And Cement Rate Per Bag Including Unloading, Water Tank Hire, Khajha Tank Rate Per Day, Mixer Machine Rate Per Hour Including Diesel, Local Char, Shuttering, Jcb Machine Rate Per Hour, Cutter Cooler 60, 80, 100 Liter Capacity, Colour Couted Gi Sheet, Ms Pipe, Angles, (Tata, Jindal, Kamdenu), Tmt 8Mm, 10Mana, 12Mm, 16Nana, 20Mm, 24Nana (Tata, Sail, Kamdenu (Iso Cartilled), Providing & Fixing Glazing In Aluminlure Doors, Windows Ventilators Is 733 & 1285 Per Aqna, Providing & Fixing False Calling Frame Work Etc Per Sq 18 277 With Labor Rate And Material Cost, Roofing With Prepainted Steel Sheet Per Aq 18 277 With Labor Rate And Material Cost, Steel Work In Bullit Up Section In Roof Firanse 10.16.1 Hot Finished With Labor Rattle And Material Cost, Rcc/ Ci Made Benche, Blectric And Sanitary Filing Material, Pvc Pipe 2 To 6 Inches Indicating Thickness And Pressure (Iso Cerilled), Sports And Fitness Equipment, Sign Board, Mnrega And Other Sign Boards Writing, Board And Writing, Etc