Tender For Rehabilitation Work And Demarcation Of Canal Land Of Subhauli Dy. From Km 0.000 To Km 16.983 In Disrtict Kanpur, 1 E/W in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20 cm layer including ramming and dressing the surface to the required level and slopes and also including 1.5 m lift and 30 m lead including all T&P etc for proper complition of work.(By hydraulic excavator/jcb/poclain machine) 2 Earth work in embankment in ordianry soil,excavation to be in the form of irregular pits & earth work in embankment to be in 20 CM layers, incl mechanical compaction & dressing the surface to the required level & slopes & also including 1.50 M lift & carriage of earth by tractor trolly upto 1.00 Km including the cost of earth,T&P etc for proper complition of work.as directed by Engineer-in- charge.(Complete) 3 Uprooting sarpat moonj & jhunds form canal including its disposal including all T&P etc. for proper complition of work etc. 4 Daula dressing including cost of all T&P, labour etc. for proper complition of work. 5 Earth work in Foundationincluding lift upto 1.50 m and lead upto 30 m & back filling with manual compaction and as per UPID specification & as per direction of Engineer in Charge including all T&P and labour etc. for proper complition of work. 6 Preparation of subgrade excluding cost of earth work but including cutting and dressing of earth surface to required shape and size including cost oflabour T&P etc required for proper completion of work as per UPID specification & as per direction of Engineer in Charge. (Complete) 7 Providing mixing and laying of Cement concrete (M15) 1:2:4(1 cement: 2 sand:4 aggregate) inclusive of all lead and lift material, labour and T&P etc. required for proper completion of work as per ID specification & direction as per direction of Engineer in Charge. (Complete) 8 Providing & Laying of 200 micron LDPE Film including all cost of material, labour, T&P etc. as per ID specification & as per direction of Engineer in Charge. 9 Providingmixingand laying 75 MM thick Cement concrete (M15) 1:2:4(1 cement: 2 sand:4 aggregate of size 9-20 mm)incl. all lead & lift, material,labour and T&P etc. required for proper completion of work as per ID specification & direction as per direction of Engineer in Charge. (Complete) 10 Providing & fixing 12 mm thick pre-moulded jointfillarfor expansion joint including all cost ofmaterial, labour and T&P etc. for proper complition of work. 11 Centering and shuttering ofC.C. work including all cost/rent of shuttering, material, labour and T&P etc. required for proper completion of work as per UPID specification &as per direction of Engineer in Charge. (Complete) 12 Cement concrete (M10) 1:3:6(1 cement: 3 sand: 6 aggregate 20-40 MM size) inclusive of all lead & lift material, labour, T&P etc required for proper completion of work as per UPID specification & as per direction of Engineer in Charge. 13 Dry brick on edge flooring in required pattern with bricks of class150 on a bed of 12 mm mud morter, including fillings joint with local sand, with common burnt clay non modular bricks including of all lead & lift material, labour, T&P etc. required for proper completion of work as per UPID specification &as per direction of Engineer in Charge. 14 Providing and fixing reflective sign board are made of 2 mm thick aluminiumsheet to be fully coveredgrade retro refletive as per colour requird by I/R .The retro reflective sheet shall be proceed on aluminiumleased as per recomondation.Text and sign symbol will be computerizd and fabricate on N.T. grade. Th Sheet with lives of extraframe of angel iron 32x32x3 mm duly printed. Two posts of M.S. heavy dutychannle of 75x75x5 mm 3000 mm long an paint with synthetic enamal paint including all cost of matrial, labour and T&P etc. requiredfor proper complition of work. 15 Brick work in 1:4 cement mortar with cement coarse sandincluding Cost of all material, labour and T&P etc. for proper complition of work. 16 Cenetering & shuttering for R.C.C. work including Cost ofrent all material labour T&P etc. for proper complition of work.. 17 Providing & laying R.C.C. 1:1.5:3 with cement, coarse sand & stone grit 20mm gauge including Cost of all material, labour and T&P etc. for proper complition of work. 18 Providing Steel reinforcement including cutting, bending, binding & placing in position including all cost of cutting bending, binding, labour, material and T&P etc. for proper complition of work. 19 Cement Pointing in 1:3 (stuck deep) on brick Masonary including Cost of all material, labour and T&P etc. for proper complition of work. 20 Dismentaling of Brick work in cementmortar and including stackking of material with a distance of 60 M as per direction of engineer in charge including all labour, materrial and T&P etc. for proper complition of work. 21 Two coat Painting on Steel and other material surface including cleaning the surface of all dirt ,dust including cost of all material, labour and T&P etc.paint shall be used as per IS specification. 22 Providing, Laying and fixing RCC (NP-3) pipe 100 MM dia in position and alignmnt including excavation and back filling including cost of all material, labour and T&P etc. for proper complition of work. 23 Providing ,Laying and fixing RCC (NP-3) pipe 150 MM dia in position and alignment including excavation and back filling including cost of all material labour T&P etc. for proper complition of work. 24 Providing, Laying and fixing RC.C (NP-3) pipe (150+100) MM dia in position and alignment including excavation and back fillingincluding cost of all material, labour and T&P etc. for proper complition of work. 25 Earth Work in cutting or in embankment in ordinary soil, excavation to be in the form of irregular pits and earth work in embankment to be in 20 cm layer including ramming and dressing the surface to the required level and slopes and also including 1.5 m lift and 30 m lead including cost of all labour and T&P etc. for proper complition of work.(in gule) as per direction of engineer in charge. 26 12 MM thick Cement Plaster in 1:4 cement plaster including all lead lift material,labour and T&P etc. required for proper completion of work as per UPID specification &as per direction of Engineer in Charge. 27 Providing & Boundry stone pillarincluding cost of all material, labour and T&P etc for proper complition of work. 28 Supply & fixingSpindleRod for steel including cost of all material, labour and T&P etc. for proper complition of work. 29 Supply & Fixing C.I. hoising Nut & Handle including cost of all material labour T&P etc. for proper complition of work. 30 Supply & Fixing Gun Mettals Bush including cost of all material labour T&P etc for proper complition of work. 31 Supply & Fixing Thursed bearingincluding cost of all material labour T&P etc for proper complition of work. 32 Electric arc welding of 18 mm thickness of job incl cost of all material, labour and T&P etc. for proper complition of work. 33 Rent of Chain pully including cost of alllabour and T&P etc. for proper complition of work. 34 Structural steel work in single section, fixed with or without connecting plate, including cutting, fixing in position and applying a priming coat of approved steel primer complete. In angle iron 75mm x 75mm x 8mm including cost of all material, labour T&P etc. for proper complition of work. 35 Providing & consuming griess and oil on steel gate including cost of all material, labour and T&P etc. for proper complition of work.