|
| 1 | Bhanar Lethi to Nauti Chetabagar Motor Road, Length-7.19 Km, Block-Kapkot, PIU-Kapkot. |
| 2 | Hyring of JCB. |
| 3 | Hyring of JCB (including cost of mobilization of machine at site, diesel and operator charges) for Slip clearence during Mansoon period for year 2023-24. |
| 4 | Protection work ( provisional quantites and shall be executed in case of emergency and as per site specific conditions) |
| 5 | Construction of R.R. stone masonary in cement mortar 1:5 including supply of all material, labour, T&P, Royalty etc required for proper completion of work as direted by Engineer-in-charge and MORD Specification for Rural Roads 2014. |
| 6 | Construction of R.R. stone masonary laid Dry, supply of all materials, labou, T&P & royalty etc. etc required for proper completion of work as direted by Engineer-in-charge and MORD Specification for Rural Roads 2014. |
| 7 | Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire (@ 32 Kg/ 10 Sqm) conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 percent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 |
| 8 | Excavation in foundation for structure, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction |
| 9 | Bageshwar-Kapkot-Tejam Motor Road Km 47 to Siri MR Length-11.10 Km, Block-Kapkot, PIU-Kapkot. |
| 10 | Hyring of JCB. |
| 11 | Hyring of JCB (including cost of mobilization of machine at site, diesel and operator charges) for Slip clearence during Mansoon period for year 2023-24. |
| 12 | Protection work ( provisional quantites and shall be executed in case of emergency and as per site specific conditions) |
| 13 | Construction of R.R. stone masonary in cement mortar 1:5 including supply of all material, labour, T&P, Royalty etc required for proper completion of work as direted by Engineer-in-charge and MORD Specification for Rural Roads 2014. |
| 14 | Construction of R.R. stone masonary laid Dry, supply of all materials, labou, T&P & royalty etc. etc required for proper completion of work as direted by Engineer-in-charge and MORD Specification for Rural Roads 2014. |
| 15 | Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire (@ 32 Kg/ 10 Sqm) conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 percent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 |
| 16 | Excavation in foundation for structure, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction |