}

Tender For Fabrication And Erection Work In Different House For Season 2024-25, Making Cover Of Mill Roller And Pinion Of Trpf Roller. Cane Unloader Secondary Cane Carrier Rack Carrier Baggage Elevator And R.B.C. Removing The Neck Runner And Installing A, bareilly-Uttar Pradesh

Cooperative has published Tender For Fabrication And Erection Work In Different House For Season 2024-25, Making Cover Of Mill Roller And Pinion Of Trpf Roller. Cane Unloader Secondary Cane Carrier Rack Carrier Baggage Elevator And R.B.C. Removing The Neck Runner And Installing A. Submission Date for this Tender is 12-06-2024. Fabrication Work Tenders in bareilly Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43559059
Tender For Fabrication And Erection Work In Different House For Season 2024-25, Making Cover Of Mill Roller And Pinion Of Trpf Roller. Cane Unloader Secondary Cane Carrier Rack Carrier Baggage Elevator And R.B.C. Removing The Neck Runner And Installing A
Open Tender
Indian
Uttar Pradesh
Bareilly
12-06-2024

Tender Details

tender for Fabrication And Erection Work In Different House For Season 2024-25, Making cover of mill roller and pinion of TRPF roller. Cane Unloader Secondary Cane Carrier Rack Carrier Baggage Elevator and R.B.C. Removing the neck runner and installing a new one. Cane Unloader Secondary Cane Carrier Rack Carrier Baggage Elevator and R. B.C. Removing the throat angle channel and installing a new one. Reinstallation of wet boot of secondary can carrier inter rack carrier. Cut out the melted watm and side plates of the fiberizer and install new ones. Replacement of gully plates of side/bottom of can carrier inter rack carrier secondary carrier and giving trial. Removing corroded plates of juice tank and gutter and installing new ones. Removing the damaged broken rail of can unloader trolley/bridge and fitting new rail. Installing new top and bottom covers of TRPF. Removing the melted plate of double barrel shoot and juice tray and installing a new one. Remove the hood of the fiberizer and replace it with a new one. Making and fitting the cane leveler as per the hood size of the cane cutter. Repairing old Rack Carrier racks Rack Carrier Fabrication of new rack of secondary can carrier Strengthening of Cane Carrier Column/Pillar Making new fitting of claw beam of can unloader and giving trial. Reinstalling the bent cone of the juice tank. Balding the teeth of the count pinion and preparing them as per the template. Hard facing of TRPF top and bottom rollers. Giving a trial by refurbishing the neck top/watm cover of the ID fan. Cutting out the defective part of the adsorption tower of juice sulfiter and installing a new one and giving a leak proof trial. Cutting out cones from different bottles 8/10 M.S. make a plate and give a trial Removing the gully body of the mud mixer, making a new one, and giving it a trial. Penns alley: cutting out ammonia coil, making a new one, installing it, giving trial Removal of quad/pan throat vapor/exhaust pipe New M.M. Making a plate and giving it a trial Cutting out the neck part of the cyst and vacuum cyst and making a new one. Cutting out weak syrup/molasses tanks 6/8 M.S. Making new/old plates/making angles Strengthening All connections Cutting out the hoppers gully, making a new one and trialling it. Give Cutting and straightening old plates from various equipment. Dismantling and placing gully pipe lines from 1.5 cm dia to 30 cm dia at the designated place. Making platforms by straightening the old plates at various stations. Making enlarged drums of links and side plates of cane carrier SRC rack carrier bagasse elevator and bagasse carrier as per size. Removing the leaking tubes of Semicondenser Vaporcell, Juice Heater Vaporline Juice Heater and Quad Installing new tubes and doing hydraulic testing Removing weak after burner of sulfur furnace by making a new one. Placement Patching the weak plate of inner space of quad and pan calandria and giving leak proof trial. Penns alley: cutting out ammonia coil, making a new one, installing it, giving trial Dismantling and replacing valves above 30 cm diameter. Cutting out melted plate of any equipment and patching it with old/new plate. Removing the mesh/catcher of the strainer of the juice pump and installing a new mesh. Removing the faulty double beat valve of the juice heater, installing the new valve and giving it a trial. Cutting out the weak partition plate of the juicer and replacing it with a new one and giving it a trial. Replacing the gully plate of a juice/water weighing scale Cutting out the condensate bottles of juice heater/quad, making new ones and making related connections, giving leak proof trial. Cutting out the rubber strip ring of the juice heater, installing the grinder, installing the rubber seat by installing the strip, giving the electric proof trial. Cutting out weak dadar shell of juice heater Maintaining label from 10 mm plate Installing partition plate Making groove for rubber strip By cutting off the throat part of the juice gutter vapor portion of the semi-conditioner. remove and replace Cutting out the damaged catcher of quad and semi-circulator and installing a new one. Cutting out the hardened shell of syrup/juice, making a new one and giving it a trial. Cutting out the coil of juice sulfiter and removing it, making a new one and installing it and giving it a trial. Removing the entire corroded door / gravers valve tray, making a new one, and giving a leak proof trial. Removing half of the door / gravers rotten metal tray, making a new one, and giving a leak proof trial. Cutting out the gravers neck umbrella and replacing it with a new plate. Cutting out the shell of door/gravers gully body 6/8 M.S. Making a new plate and installing it, making all the connections and making a manhole Cutting out the mudwood of the door and making a new one and giving it a trial. Cutting out the door/gravers intermediate tray and installing it with a new plate. Mud from door/graver/juice over flow box side/cut out the melted plate and remove it, make a new one and give it a trial. Replacement of sulfur furnace cooler pipe Removing the old cooler installed on the sulfur furnace and installing a new one and giving it a trial. Remodeling the sulfur furnace melter and installing it, doing hydraulic testing and giving it a trial. Changing the gully body of the sulfur furnace and giving it a trial by making it from a new plate. Dismantling and removing all three sulfur furnaces and their coolers etc. and fitting them back to their respective places after the platform is built. Clarifier / gravers alley Cutting out the juice coil Making a new coil and installing it Giving a trial Juice Heater Quad Cutting out juice/syrup coil Making a new one Putting it on trial Removing the old chimney fitted in Bag Silo, Cyclone, Door Graver Syrup and Juice Sulphiter and making a new one of the size as per the instructions. Cutting out the stuck mud agitator of the vacuum filter and installing a new one and giving it a trial. Necessary patching by cutting out the weak part of the clarifier/graver compartment. Removing the screw conveyor from the mud mixer and installing a new one. Cutting out the umbrella fitted in the quad, making it according to size and giving it a trial. Semiconductor VaporCell, cutting out the core of the quad, refurbishing it, and giving it a trial. Remove the weak shell and top portion of the semi-conditioner and replace it with new 8/10 M.M.M.S. Make all connections by making plates and making them leak proof. Removing scraper arm of clarifier/graver, making a new one, and giving trial. Repairing and trialling the scraper arm of clarifier/graver. Removing the top cone from the vapor space of a semi-condenser vapor cell, refurbishing it, and testing it. Cutting and removing melted filter bottle of vacuum filter M.S. make a new plate and give a trial Removing and refitting the vapor box of the vapor space of a Pa semi-conditioner. Staging of quad/vacuum filter/sulphur furnace/juice deaerator Strengthening of beam Placing weak beam as per instructions Giving trial Cutting out the weak discharge cone of the pan and 6 mm. M / s. Make a new one and install it using a plate. Make a ring from 8 inch wide, 12 mm plate and fix it in the shell of the pan. Exhaust/Vapor Pipe on Pan/Quad 600mm/800mm Dia dismantled to 8 mm. Make a new one from the plate and install it. Cutting out the neck/top cone of the pan, placing it in the prescribed place, making a new one, and installing it, giving it a trial. Cutting out the feed pipe of the pan, putting the old one in the scrap yard, making a new one and installing it. Cutting out the weakly stuck mascot gutter of Pan Crystallizer, making a new one and giving it a trial. Removing the leaking tube of the pan and fitting a new tube in its place and giving a hydraulic trial. Cutting the umbrella fitted in the pan and making it according to size. to provide support, to give trial To cut apart the fried sevaal from the pan, to prepare a new one, to give it a trial To remove the broken feed distributor turtle from the pan, to make a new one, to provide support, to give trial Stunting the pan with angles/channels to strengthen it internally and externally. Removing the weak plates/angles etc. inside the pan wall and fitting new plates with angles. Fitter by removing weak plates, angles etc. inside the external catcher of the pan and fitting new plates with angles. Cutting away the mascot discharge shoots of the pan is 6/8 mm. Of M.S. Make a new one and install it using a plate. Making rings on exhaust pipes, stopping leakage, giving trial Removing neck band/nipple of vapor/exhaust pipe, fabricating it with new 8/10 mm plate, replacing it and giving it trial. Cutting out the 60 ton pans water tank, making it from a new 20 mm plate, installing it and giving it a trial. Removing the shell of 40 ton pan by cutting off the taper part, installing new 12/16 mm plate and giving trial. Cutting out the weak plate of down take of 40/60 ton pan and replacing it with 12/16 plate and giving trial. Cutting out the neck part of 40/60 ton pan shell and 12 mm. Make a new plate and give it a trial Cutting out the neck part of the cyst and vacuum cyst and making a new one. Removing the stuck steam coils in syrup/molasses tanks and installing new ones. Cutting out the weak part of side plate/beam plate of syrup molasses tanks and installing new one and giving trial. Removing the top cone from the quad/pan, making a new one from 12 mm plate and installing it, giving it a trial. Removing the defective oil guard of the crystallizer and installing a new one. Cutting out the bad coils of the kit, making new ones, and giving a trial. Removing the broken arm of air cooled crystallizer, making a new one and giving it a trial. 8/10 mm by removing the weak external catcher of the pan. M / s. Make a new one from the plate and install it. Removal of dot and cold water over dead tank and 6/8 mm. M / s. Make a new one from the plate and install it. Removing the air waffle plate from the hopper and replacing it with a new plate and giving it a trial. Magma Mixture / Pug Mills Galli Wattam Plate should be cut and removed and a new one should be installed. Removing, disassembling, cleaning, reinstalling the transient heater of the Sentry machine and giving it a leakproof trial. NK-1100/30 Degree Centrifugal Machine No. 6 was removed from its place and centrifugal machine no. 1s replacement and magma Removing the drive piece of damper tray and installing a new one. Removing the broken shaft of magma mixture/pug mill, making a new one, fitting the arm, giving trial. Remodeling and trialling the broken molasses chamber of the Kanti machine. The weak cover of the continuous machine is 6/8 mm. M / s. Make a new one from the plate and install it. Remove the weak arm of the sugar melter and replace it with a new one. Cutting out the neck/weak part of the pan condensate tank and removing the 6/8 mm. M / s. Make a new one from the plate and install it. Repairing broken bucket of sugar elevator/dry shed elevator. Replacement of broken bucket of sugar elevator/dry shed elevator by using MS plate. Cutting out the super heater coil of the Sentry machine, making a new one, doing hydraulic testing, giving a trial. Super Ditted Wash Water Bottle 12 Mm. M / s. Installing new plate by plate and giving leak proof trial. The exhaust blower is supplied by M.S. Make a new one and install it using a plate. Cut out the weak casing of the exhaust blower and replace it with a new one. Strengthening the weak columns of Wyaling House plants by installing plates Fabrication/erection of 1.5 cm dia to 30 cm CAS T nipple reducer and band Dismantling of pipe lines above 30 cm diameter and placing them at the designated place, fabricating new ones and fitting them and leak proof trials. Erection by fabricating case, tee reducer nipple, band over 30 cm dia. To state the staging of various equipment. Dismantling various round rectangular tanks, making new ones using 6/8 mm SS plates and giving leak proof trials. Rebuilding various round rectangular tanks with 6/8 mm MS plates and giving leak proof trials. Removing the gully nets of the bagasse and making new nets as before and installing them. Refurbishment of bagasse elevator bagasse carrier rack by angle, flat iron. Repairing old racks of bagasse elevator bagasse carrier. Bagasilo fan gets M.S. Make a new one and install it using a plate. Removing the chimney gully/weak plate of boiler no. 3 and installing new 8/10 mm. M / s. new angle made from plate Boiler no. 1. Cut out the weak/weak columns and beams of 2 and 3 and install them as before. The mesh on the weight skewer installed on Boiler No. 3 has a weak angle, channel, M.S. Cutting out the plate and 6 mm. by making new plate Cutting and removing weak plates of bagasse feeders installed on Boiler No. 3 and 6 mm. M / s. Changing from plate. Dismantling of fixed front and back plates of boiler no. 1, 2 and 3 and installation of new and old plates. Strengthening by placing plates on both sides of the column/beam at the neck of void and RBC. Cutting and removing air pipe of 8 inch/10 inch diameter of FD gully inside the furnace of Boiler No. 1 and 2 and new pipe as per previous instructions. Fabricating and installing the internal plate/mesh in the drum of boiler no. 1.2 and 3 as per the previous procedure. Stenting the bagasse belt conveyor by installing angles and channels. Cutting and removing the gully ducting of air heater and economizer of ID/FD fan of boiler no. 1, 2 and 3 and installing new ones. Remove the damper from the weight skewer and vailler ID/FD fan, economizer and install a new one and then run it. Reinstallation of internal parts of the wet skewer installed on Boiler No. 3. New MS. To apply to the plate. Removing the bent section cone of the ID fan and installing a new one. Removal of defective guide runner of bagasse carrier bagasse elevator and installation of new one. Removing the mesh installed in the S pit of the wet skewer of Boiler No. 1 and 2, making a new frame and installing the mesh. Dismantling work of old header and old branch pipe lines at spray pond. Dismantling of Cast Iron Branch Pipe Dia 6 with Flanges M.S. Construction and installation of a new pipeline. Dismantling of branch/pipe line dia 6 including flanges and bands. S.S. Fabrication/Fitting Work of New Header, S.S. Fabrication/erection work of header. Cutting off all the nipples in the cold water tank and making new ones. Placement Cutting out the gully plate of Dot/Cold Water Over Dead Tank and available 6/8 M.M. plate installation Cutting out the neck part of the injection header New 8/10 mm. make from plate The weak part of the suction pipe of injection/spray should be 6/8 mm. M / s. Make a new one and install it using a plate. Remove the weak mesh of the injection/spray suction pipe and replace it with a new one. Providing satisfactory service by repairing the aeration fan of ETP. Fixing the butt of the shaft of ETPs clarifier and giving it a trial. Repairing the stirrer of primary clarifier of ETP and giving satisfactory trials. The ditch/lane above the primary clarifier of ETP is M.S. Cutting out the plate and fitting a new plate. The ditch/lane above the periphery of the secondary clarifier of ETP is M.S. Removing the plate by cutting it and fitting a new plate. Repairing and installing the stirrer of the secondary clarifier of ETP. Installing gate ball by making plate according to the size of drain. E.T.P. Fit the slip ring of clarifier as per size and install it. Placement Dismantling the old fans of the aeration tank and making new fans. Fabricating and fitting B-nose from plate Fabrication, erection of new pipe lines from 1.5 cm dia to 30 cm dia and providing leak proof tryon. Unloading the weak pipeline of bagsails M.S. Fabricated by plate and fitted in place. Removing the gully/weak side plate, trough/trough plate of bagasse elevator bagasse carrier and fitting it with new/old plate as per previous procedure. Taking out the nets of bagasse along with the frame and making a new frame through an angle and making sliding arrangement to take the net in and out. Removing and re-installing a new 18 inch narrow/weak manhole at the boiler station. Boiler No. 3s proven font, bank plates are 6 mm. Fitting with new/old plates and providing support by installing angles. Patching a wet skewer with a new/old plate Reinstallation of internal parts of the wet scrubbers installed on Boiler No. 1 and 2. Cutting out the dead ash shoots of Vayalar No. 1.2 and 3 and planting new ones. cutting out the weak part of the bagasse casing and installing a new one Cutting and fitting old flanges of 1.5 cm diameter to 30 cm diameter, fabricating and fitting them with new plates, dismantling of bulbs, valves. Removing and taking down the front plates of Boiler No. 1 and 2, repairing and refitting. Dismantling, fabrication, erection of structures at various stations. Making pump/motor beds of different sizes Making and installing 18 diameter manholes in various equipment Cutting out the old main drum of pan, vapor pipe, door graver and installing a new one with a new plate. Making the body of exhaust valve of vapor cell/pan, leveling the sheet, fitting and giving trial. Quad Pan and Juice Deters Lane / Cutting out the weak ammonia coil, making it new as before and installing it and giving it a leak proof trial. Removing the old valve of quad vapor cell/semi-condenser and making a new one and installing it as before and giving a leak proof trial. Cutting the gully/weak plate of the valve fitted on the quad/vapor cell/semi-condenser and fitting/straightening the new plate.

Key Value

Document Fees
INR 354 /-
EMD
INR 40000.0 /-
Tender Value
INR 20 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail