}

Tender For Fabrication And Erection Job, gurdaspur-Punjab

Government Departments has published Tender For Fabrication And Erection Job. Submission Date for this Tender is 13-06-2024. Fabrication Work Tenders in gurdaspur Punjab. Bidders can get complete Tender details and download the document.




Tender Notice

43549528
Corrigendum : Tender For Fabrication And Erection Job
Open Tender
Indian
Punjab
Gurdaspur
13-06-2024

Tender Details

Tender For Fabrication And Erection Job- 1 Repair of cane unloader grab arms 2 Replacement of sq. bar of cane unloader. 3 Repair, strenghening and alingment of bridge span of unloader. 4 Dismantling, Fabrication and Erection ofa) Mincer Hood 5 b) Cutter Hood 6 c) Chopper Hood 7 To build mill rollers crown pinion teeth as per standard template of teeth. 8 Fabrication and erection of mill rollers crown pinion guard 9 Fabrication and erection of Donnelly chute of mills 10 Dismantling, Fabrication and erection of worn-out Juice tray at mill house from 10/12 mm plate 11 Dis. Feb. & erection ofMill house screw conveyor Complete set. 12 Dis. Feb. & erection of mill house screw conveyor trough along with dismantling and fitting of conveyor and drive system. 13 Dismantling and erection of worn-out runners of cane carrier, RBC, Bagasse Elevator and inter carrier. 14 Dismantling, Fabrication and erection of worn-out side plates of cane carrier, RBC, Bagasse Elevator and inter carrier. 15 Dismantling, Fabrication and erection of worn-out trough of RBC, Bagasse Elevator & Rack carriers froma) MS plate6/8 mm 16 b)SS plate 4/5 mm 17 DismantlingFabrication and erectionstructure of cane carrier drive ,RBC chain drive, Rakecarrier and elevator chain drive 18 Replacement of worn out bottom boot of secondary chain 19 Replacement of angle and channel of cane carrier / RBC / Rack carrier & Elevator . 20 Repair of secondarycane carrier chain and elevator chain rake 21 Fabrication of secondarycane carrier chain and elevator chain rake 22 Fabrication of RBC slates 23 Repair of RBC slates 24 Dis. And erection of bagassecillow blower 25 Fabrication of bagassecillow blower 26 Dismantling and Erection of boiler bagasse feeding CI furnace mouth piece of WIL make Boiler. 27 Dismantling and Erection of boiler bagasse feeding CI furnace chute 28 Replacement of furnace/chamber door and door frame of WIL make Boiler & Texmaco make boiler 29 Repair and fitting of furnace/chamber door and door frame of WIL make boiler & Texmaco make boiler 30 Dismatling of Boiler Dampers 31 Fabrication of Boiler Dampers 32 Erection of Boiler Dampers 33 Repair of Boiler Dampers 34 Repair ofID fanofWIL and Texmaco make boiler 35 Repair ofFD fanofWIL and Texmaco make boiler 36 Dismantling, Fabrication and Erection of boiler bagasse feeding MS chute between boiler furnance and RBC chain 37 Patch work 38 Dis, feb, & errection of boiler flue gas ducting between FD fan, ID fan& chimney. 39 Dismantling, Fabrication & Erection of bend of boiler flue gas ducting between ID FAN and chimney from 6/8mm thick plate. 40 Dismantling, Fabrication & Erection of Side plate & Top plates(4mm) of boilers. 41 Dismantling, Fabrication & Erection Economiser top & side plates 42 Dismantling, Fabrication & Erection Air heatertop & side plates 43 Dismantling and fitting of GI/ACC sheet. a) Dismantling 44 b)Fitting 45 Dismantling of machinery structure. 46 Fabrication and Erection of machinery structure. 47 Dismantling & erection of FD Fan Casing 48 Fabrication of FD Fan Casing 49 Repair of FD Fan Casing 50 Dismantling & erection of ID Fan Casing 51 Fabrication of ID Fan Casing 52 Repair of ID Fan Casing 53 Dismantling, Fabrication & Erection(a)pump and motor bed 54 b) Motor and radicon 55 c) Cutter motor bed 56 Dismantling fabrication and erection ofwet scrubber cone 57 Dismantling fabrication and erection ofwet scrubber side plates 58 Dismantling fabrication and erection ofclarifier cone of Boiler 59 Dismantling fabrication and erection ofman hole 60 Dismantling fabrication and erection ofman hole blind 61 Dismantling, fabrication and erection of boiler no. 1 chimney (Top portion upto 15 to 20 mtr) 62 Repair & strengthening of boiler no.1 chimney 63 Fabrications mill roller bearing cover 64 Dismantling of Structure 65 Fabrication of Structure 66 Erection of Structure 67 Dismantling of platform plates 68 Fabrication of platform plates 69 Erection of platform plates 70 DismantlingofRailing 71 Fabrication & erection of railing 72 Fabrication and erection of MS stairs with railing 73 Fabrication ofmotor protection cover 74 Fabrication of shed (any size) with structure 75 Repair of DSM screen 76 Dismantling and erection of DSM Screen 77 Cutting & welding of boiler tubes for cleaning 78 Cutting and welding ofheader capsfor cleaningof boiler tubes 79 Seamless pipe ½’’to 8’’OD & above(various lengths)a) Dismantling 80 b) Fabrication 81 c) Erection 82 Seamless pipe nippleup to8’’OD& above a) Dismantling 83 b) Fabrication 84 c) Erection 85 Seamless pipe bendsup to8’’OD& above a) Dismantling 86 b) Fabrication 87 c) Erection 88 IBR valveup to36’’OD a) Dismantling 89 b) Erection 90 IBR flange a) Dismantling 91 b) Fabrication 92 c) Erection 93 IBR Teea) Dismantling 94 b) Fabrication 95 c) Erection 96 Reducera) Dismantling 97 b) Fabrication 98 c) Erection 99 Boiler drum partition platesa) Dismantling 100 b) Fabrication 101 c) Erection 102 d) repair 103 Boiler drum water seprator a) Dismantling 104 b) Fabrication 105 c) Erection 106 d) repair 107 IBR welding joint 108 Dismantling of M.S. Round/SquareTanks 109 Fabrication of M.S. Round Square Tanks 110 Erection of M S Round /square Tanks 111 Dismantling of M.S./G.I./ C.I./ SS / RMP pipe from 1” to 12” dia 112 Erection of MS/GI/CI/SS/ RMP pipe 1” to 12” dia 113 Fabrication of M S / SS pipe line above 12” dia from M.S. / SSplate 114 Dismantling of M.S. / SS/C.I. pipe line above12” dia 115 Erection of M.S./ C.Ipipe line above 12” dia 116 a)Dismantling of Nipple 1” to 12” dia up to 24” length 117 b)Fabrication of Nipple 1” to 12” Ø & up to 24” length 118 c)Erection of Nipple 1” to 12”dia & up to24” length 119 a)Dismantling of Nipple above 12” dia up to 1 mtr. length 120 b)Fabrication of Nipple above 12” dia up to 1 mtr. length 121 c)Erection of Nipple above 12” dia up to 1 mtr. length 122 a) Dismantling of bend 1” to 12” dia 123 b) Fabrication of Bend 1” to 12” dia 124 c) Erection of bend 1” to 12” dia 125 Dismantling ,fabrication & erection of Bend above 12” below 36” dia 126 Dismantling of Reducer/Tee1” to 12” dia & up to 24” length 127 a) Dismantling of Blind 1” to 12” dia 128 b) Fabrication of blind 1” to 12” dia 129 c) Erection of blind 1” to 12” dia 130 a) Dismantling of blind above12” dia 131 b) Fabrication of blind above 12”dia 132 c) Erection of blind above 12” dia 133 a) Dismantling of valve 1” to 12” dia 134 b) Erection of valves 1” to 12” dia 135 c) Dismantling of valve above 12” dia 136 d) Erection of valvesabove 12” dia 137 a)Dismantling of flange 1” to 12” dia 138 b) Fabrication of flange 1” to 12” dia 139 c) erection of flange above 12” dia 140 Dismantling, Fabrication & fitting of Jet Box in M.S. Material 141 Dismantling, Fabrication, fitting of Jet Box in S SMaterial 142 Dismantling, Fabrication & fitting of Nipples 8” to 10” dia for Jet Box of Condenser 143 a) Fabrication of Vapour pipe bend 36” to 40” dia 144 b) Dismantling & erection of vapour pipe bend 36” to 40” dia 145 Dismantling, Fabrication and erection of existing syrup/ molasses/ magma pipe lines for their internal/external cleaning. 146 a) Dismantling of Vapour pipe 900 mm/ 1000 mm dia 147 b) Fabrication of vapour pipe 900/1000 mm dia 148 c) Erection of Vapour pipe 900/1000 mm dia 149 Dismantling, Fabrication & erection of Save all from 10 mm to 12mm platea) Pan 150 b) Quad& Vapour cell 151 Dismantling, fabrication & erection of save all from 8mm to 10mm MS plate excluding outer shell 152 Replacement of J-pipe in vapour cell/ quad body/ pan 153 Dismantling, Fabrication & erection of Umbrellaa) Pan 154 b) Quad& Vapour cell 155 Dismantling, fabrication & erection of bottom and top cone a) Pan 156 b) Quad & Vapour cell 157 c) Juice sulphiter / syrupsulphiterand cone of any other units above 12” dia 158 Dismantling of inter connecting square box for juice heater double beat valve and fabrication, erection with pipe (modify). 159 a) Replacement of cooling jacket for the sulphur burning chamber. 160 b) Replacementof sulphur furnace coolingscrubber complete withinternal8” cooling jacket, 6” gas pipe and 4” cooling pipe 161 c) dismantling, fabrication & erection of cooler made from 8” dia pipe for sulphur furnace 162 Dismantling, Fabrication & erection of Sulphur burning chamber of Sulphur Furnace 163 Dismantling, fabrication & erection of Sulphur melt Tank 164 Dismantling, fabrication & erection of coil for Sulphur melter 165 Lime Hopper :-a. Fabrication & Erection along with connecting valves & pipes with its drive system etc. 166 b. Lifting of lime slacker alongwith connecting parts upto 2 ft height suitable for fitting lime hopper. 167 Dismantling, Fabrication & erection of condenser of vacuum filter 168 Dismantling, Fabrication & erection of Vacuum filtera) Mud Trough 169 b) Agitator 170 Replacement of vacuum filter drum complete including connected accessoriesa. Dismantling of existing RVF drum and to be shifted at scrap yard. 171 b. New R.V.F drum to be erected at position including connected accessories etc. 172 Dismantling, Fabrication & erection ofMud Scroll/screw conveyor 173 Dismantling, Fabrication & erection of Mud Mixture 174 Dismantling, Fabrication & erection ofBagacillo cyclone. 175 Dismantlingof Angle valves / Straight Valvea)Size 450 mm to 700 mm 176 Size 700 mm to 1000 mm 177 Erectionof Angle valves /Straight valve a)Size 450 mm to 700 mm 178 Size 700 mm to 1000 mm 179 Patch work at Boiling House and C/F House etc. 180 Fabrication & erection of Mud Boots for Dorr. 181 a. Replacement of clarifiercenter tube 182 b. Replacement of MS Scrapper arms of clarifier center tubes. 183 c. Replacement of clarifier juice distribution plates 184 a) Replacement of Clarifier Bottom plate(compartment) 185 b) Dismantling,Fabrication & erection of Clarifier 186 Dismantling of coils in Dorr/Melter/Centrifugal machines/Steam coils etc. 187 Fabrication of coils in Dorr/Melter/Centrifugal machines/Steam coils etc. 188 Erection of coils in Dorr/Melter/Centrifugal machines/Steam coils etc. 189 Dismantling, Fabrication and erection of semi Kestner bottom nipple 24” dia 190 Replacement of Quad / Vapour Cell down take 191 Replacement of Pan down take 192 Patch work of worn our portion of pan / evaporatorbody shell 193 Patch work of Save all of pan / evaporator bodies 194 Patch work of Umbrella of pan/ evaporator bodies 195 a) Strengthing ofshell with coil type channel with cross by pipe/ channel at two places of pan 196 b) Strengthing of Umbrella of pan / evaporator bodies 197 Dismantling, Fabrication & Erection of body shell a) Juice Sulphitor 198 b) Evaporator bodies 199 c) Pans 200 Dismantling, Fabrication & Erection of Bottom/Top Taper portion ofa)Pans 201 b) Evaporator bodies 202 Dismantling of SS tubes of a) Pans 203 b) Evaporator bodies 204 c) Juice heater 205 Fitting of SS Tubes and to be tested at80 PSI Hyd. Pressure a) Pans 206 b) Evaporator bodies 207 c) Juice heater 208 a) Dismantling of S.S tube of semi kestner 209 b) Fitting of S.S Tubes of semi kestner and to be tested 80 PSI Hyd. Pressure 210 Dismantling, fabrication and erection of shaft with arms of Dry seed crystallizer / vacuum crystallizer. 211 Dismantling, fabrication and erection of agitator arms of juice sulphitor/dry seed crystallizer / vacuum crystallizer. 212 Replacement of ribbon type stirrer of air cooled crystallizer. 213 Crystallizer central shaft with Ribbon:a) Dismantling 214 b) Fabrication 215 c) Erection 216 Dismantling, fabrication and erection of condensate bottle big size(from 1.5mtr to 2.0mtr) 217 Dismantling, fabrication and erection of condensate bottle big size(from 1.0mtr to 1.5mtr) 218 Dismantling, Fabrication & Erection of segment of pan shell 219 Dismantling, Fabrication and erection of complete pan shell including sight glass, Man hole, provision of key sample, vacuum gauge, ammonia pipes, glass washing pipe, cold water lineconnections and other accessories connectedto body shell, Umbrella including welding of M.S. angles for supports etc., top taper cone including connections of washing steam pipes etc., save all including J-pipes etc, vapour pipe outletnipple of save all, Feed pipe connections etc. 220 Vacuum crystallizer / Dry seed crystallizer (i) Dismantling, fabrication & erection of complete shell ( including side plates ) along with dismantling, erection & alignment of complete drive system 221 Dismantling, fabrication & erection of complete shell ( excluding vertical side plates ) 222 Worm and worm wheel, Gland housing of Crystallizers: a)Dismantling and erection of existing worm and worm wheel, gear box, motor and alignment work of worm and worm wheel, gear box and motor for satisfactory trial. 223 b) Dismantling and erection of gland housing of crystallizer shaft. 224 S.S Bend/TEE/reducer/Nipple/crossa) Dismantling 225 b)Fabrication 226 c)Erection 227 Dismantling, Fabrication & erection of Manhole with neck flange cover 16 to 24 dia. 228 Cutting & strengthening of old material 229 Dismantling, Fabrication & erection of worn out feeding Header of pans 230 Dismantling, fabrication & erection of central tube with cooling coil (shaft) for water cooled crystallizer-40 tons 231 a) Dismantling, Fabrication & erection of cooling pipe coil in the crystallizermadefrom 4” dia pipe 232 b) Patch work of crystallizer cooling shaft 233 Coilsa)Fabricationof coil 234 b)Dismantling & erection of coils 235 Dismantling of existing condenser including their venture, tail pipe, bend etc. and thereafterinstallation ofefficient single entry new condensers including fabrication / erection of venture, tail pipe & bends etc. Fabrication and erection of base frame and other associated fabrication & erection jobs. 236 Dismantling, Fabrication & erection of M.S.Gutters. 237 Replacement of C.I. Cone (venture)of Multijet condenser 238 Dismantling C/F Machine including water, steam connection and discharge chute 239 Dismantling and erection of sugar grader of side plate including modification of structure. 240 Hoppersa) Dismantling, fabrication & erection of Deck piece & alignments of Hopper 241 b) Dismantling, fabrication & erection of Hopper piece from Deck piece to end of Hopper 242 c) Dismantling, Fabrication & erection of Hopper piece from Deck piece to start of Hopper including Multi trays. 243 d) Dismantling, Fabrication & erection of Hopper complete with deck piece and multi tray for hot/cold air blower. 244 Magma Mixera) Dismantling of magma mixer including shaft / arms / drive etc. 245 b) Fabrication of magma mixer including shaft / arms / drive etc. 246 c) Erection of magma mixer including shaft / arms / drive etc. 247 Dismantling, fabrication & erection of molasses gutter for centrifugal machines 248 Dismantling and erection of existing syrup/ molasses/ magma pipe lines for their internal/external cleaning. 249 For spray Pond a) Fabrication of SS pipe line up to 12” dia from 4 mm thick Ss plate 250 b) Fabrication of SS cluster for fitting 2” sized pipes with nozzles ( as fitted in existing clusters) . 251 c) Threading in 2” dia SS pipe line for fitting nozzles

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 06-06-2024 Corrigendum date Date 13-06-2024

Key Value

Document Fees
Refer document
EMD
INR 50000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail