Public Administrative Department Government Departments Closing in 0 days TDR #43542163

Tender For Fabrication And Erection (Major & General Jobs)

Issued by Government Departments · Ludhiana, Punjab
Tender Value
Ref. Documents
Estimated cost
Bid Submission
28 Jun 2024
0 days left
EMD
50000
Bank guarantee accepted
Document Fee
1
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Ludhiana → Punjab
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Fabrication And Erection (Major & General Jobs); 1 Replacement of worn out M.S. vertical supporting channels & side plate of final molasses storage tank with M.S Plate and channels. 2 Replacement of worn outRoofof final molasses storage tank with M.S Plate 4/5/6mm and Supporting Channel /Angle. 3 Dismantling ,fabrication & Erection of top MS plate of Pan Shell 4 Dismantling ,fabrication and erection of outer body shell of pan from MS plate 10mm/12mm 5 Strengthening of pan’s shell with angle and channels in round shape with MS angle 75x75mm and Dia 4.34 mtr. (3 rounds) 6 Strengthening of Evaporator shell with angle and channels in round shape with MS angle 75x75mm and Dia 2.80 mtr. (3 rounds) 7 Dismantling ,fabrication & Erection of Top cone below save –alof Evaporator 8 Dismantling, Fabrication, Erection of Complete Save all (existing design) of evaporators including top plate, inner and outer shell. 9 Dismantling, Fabrication, Erection of umbrella of save al Evaporators body as per existing design including all supporting. 10 Dismantling, Fabrication and erection ofQuad condensate tank/ Syrup Bottle including all connection. Approx. Size Dia509mmxlength 1800mm 11 Dismantling, Fabrication, Erection of Stirrer(Fan) of Aeration Tankat ETP as per existing Design including complete commissioning and trial 12 Dismantling, Fabrication, Erection of Hot water Weighing tank of water weighing scale. Dia 1.6 mtr x 1.5 height X cone 1 mtr length .The Erection work for this job will also include all connections which are dismantled during dismantling. 13 Dismantling, Fabrication, Erection of Mix juice Weighing tank of Juice weighing scale. Dia 2 mtr x 1.5 height X cone 1 mtr length .The Erection work for this job will also include all connections which are dismantled during dismantling. 14 Dismantling, fabrication & Erection of Juice feed boxes of juice heater double beat valve. The Erection work for this job will also include all connections which are dismantled during dismantling. 15 Dismantling, fabrication & Erection of absorption tower of Juice Sulphiter. The Erection work for this job will also include all connections which are dismantled during dismantling 16 Dismantling, Fabrication & Erection of worn out Stainer of Mix juice tank/ Sulphited Juice tank / Syrup Tank. 17 Dismantling, fabrication and Erection of the sulphur furnace with existing design (By 16 mm & 12mm MS plate) This work include dismantling and Erection of all connections, man hole, flanges etc of sulphur Furnace. 18 Dismantling, fabrication and Erection of Melter of Sulphur furnace as per Existing design. This work include dismantling and Erection of all connections, man hole, flanges etc. 19 Dismantling, fabrication and Erection of Scrubber of Sulphur furnace as per Existing design. This work include dismantling and Erection of all connections, man hole, flanges etc . 20 Dismantling, Fabrication & Erection of Dorr coils(Nipple/Flange/ reducer rates as per general fabrication, Erection Rates ) 21 Dismantling , Fabrication & erection of bottom of 2ndcompartment of dorr clarifier 22 Dismantling ,fabrication & erection of the outer shell of dorr clarifier 23 Dismantling , Fabrication & erection of top of top compartment. 24 Dismantling ,fabrication & erection of shell of foam chamber. 25 Dismantling, fabrication and Erection of Mud tank below RVF including all connections. 26 Dismantling, fabrication and Erection of worn out Heavy / Light Vacuum tank of RVF including all connections. 27 Fabrication & Erection of common juice heater pit tank with top cover and condensate pipe line along with partition plate for sealing in tank, fabrication, erection of bed for motor, fitting of pump, motor with suction and delivery lines inlcudling all connections 28 Fabrication & erection of coil of juice heater size 2” along with required connections from the juice heatershell 29 Dismantling ,fabrication & Erection Outer body shell of juice heater 30 Fabrication & Erection of commonvapourdistribution header after external catchersemi- kestner along with all necessary connections as per drawing 31 Fabrication & Erection of filter Juice Sealing Bottle of receiving pit for vacuum filter. The Erection work for this job will also include all connections which are dismantled during dismantling. 32 Dismantling fabrication and Erection of filtrate juice receiving pit tanks for vacuum filter. 33 Dismantling fabrication and Erection of filtrate juice receiving pit tanks for vacuum filter. 34 Dismantling, Fabrication & Erection of Bagacillo Cyclone. 35 Dismantling, Fabrication & Erection of Bagacillo Chute. 36 Dismantling, Fabrication & Erection of Bottom trough of Mud Mixer for RVF. 37 Dismantling, Fabrication & Erection of screw conveyor of Mud Mixer. 38 Dismantling, fabrication and Erection of MS vapour pipe of different sizes.Dia- 1050mm 39 Dia - 900mm 40 Dia - 720mm 41 Dia – 670mm 42 Dia – 520mm 43 Dia – 420mm 44 Dismantling, Fabrication & Erection Vapour/Exhaust pipe bend Dia900mm 45 Dia - 1050mm 46 Dia - 720mm 47 Dia – 620mm 48 Dia – 520mm 49 Dia – 420mm 50 Dismantling, fabrication and Erection of distance piece of MS vapour pipe length up to 1.5 mtr.Dia- 1050mm 51 Dia - 900mm , 52 Dia - 720mm 53 Dia – 620mm 54 Dia – 520mm 55 Dia – 420mm 56 Dismantling of MS/CI condenser cone of Pans 57 Fabrication of MS condenser cone ofPans 58 Erection of MS/CI condenser cone of Pans 59 Dismantling, Fabrication, Erection of umbrellas of pan save all as per existing design including all supporting. 60 Replacement of worn out portion of bottom, side plate & supporting angle/channel of syrup and molasses tank at Pan station . 61 Replacement of M.S bottomGutter of Crystallizer station and other factory units. 62 Replacement of worn out portion ofpan saucer. 63 Dismantling, fabrication and Erection of downtake of Pan from 10/12mm plate. 64 Replacement of Feed box of Pans including all connections. 65 Dismantling, fabrication and ErectionbottomDistributor of pans. 66 Dismantling, Fabrication & Erection of Worn out portion of molasses conditioner. This work includes dismantling and Erection of all connection pipes and their drive unit. 67 Dismantling, fabrication and Erection of worn out bottom portion of crystallizer 68 Dismantling, Fabrication and Erection of worn out portion of C-Vacuum Crystallizer. 69 Replacement of crystallizer arms along with supports from 75x75mm M.S angle.(1)Dismantling. 70 (2) Fabrication. 71 (3) Erection. 72 Dismantling, fabrication & Erection of cooling coils3” of Crystallizer including all connections. 73 Dismantling and Erection of MS branch pipes of spray pond. This work includes all connections of clusters. 74 Dismantling of CI/MS main pipeline spray pond 75 Dismantling fabrication & Erection of suction pipes of injection pumps with stainer. 76 Dismantling fabrication & Erection of suction pipes of Spray pumps with stainer. 77 Dismantling, Fabrication Erection of worn out Bottom half portion of A / B magma mixture including allconnections. 78 Dismantling, Fabrication and Erection of worn out Bottom half portion of A pug mill including all connections. 79 Dismantling, Fabrication and Erection of worn out A-Magma Mixture complete including all connections. 80 Dismantling, Fabrication and Erection of Sugar Melter Pump stainer Including all connections 81 Fabrication and Erection of Bed for pump and motor of Magma mixture along with suction and delivery pipe line connections, alignment of motor with pump etc. 82 Dismantling, fabrication and Erection of bottom discharge chute of continuous centrifugal machine 83 Dismantling, Fabrication and Erection of ammonia coils of pans from MS pipeDia 3”including all connection 84 Dismantling and Erection of Complete Calendria with Tube plate (Top and Bottom) of Pan No. 1st& 3rd including all connections ,dismantling & erection ofdistributor and ammoniapipe line 85 Fabrication and erection of Beds for Pump and Motor etc. 86 Dismantling and Erection of Crystallizer shaft including arms and all connections, Fittings. 87 Dismantling, Fabrication and Erection Cane cutter hoods from8-10mm thick plate with MS Angles etc. 88 Dismantling and Erection of Expansion joint of power turbine exhaust line. 89 Replacement of side plates of cane carrier chain/ RBC and trough of RBC / Bagasse elevator/ Cross RBC. 90 Replacement of channel and I-Beam of RBC/ Cane Carrier/ Bagasse Elevator/ Cross RBC Runner 91 Dismantling, fabrication erection of juice tray of mill No. 3 from SSplate 92 Dismantling, fabrication erection of juice tray of mill No. 3 from MS plate 93 Fabrication of screw conveyor of Mill House 94 Dismantling, Fabrication , Erection ofscrewconveyortrough ofMill house 95 Fabrication and erection of screw conveyor 96 Fabrication and erection of screw conveyor (APCD ) plant including motor and gear fitting 97 Replacement of Bush of crystallizer ‘s central shaftat drive end 98 Replacement of Bush of crystallizer ‘s central shaftatNon - drive end 99 Dismantling, fabrication erection of ash hopper of boiler (pyjamas) cone with chute bottom portion( cone tapper portion size 15” approximate) 100 Repair of rotary bagasse feeders of boilers1)Body 101 2) Rotor 102 Replacement of side plate 3mm/old ms plate of boiler (with MS plate & supporting angle/ flat) 103 Dismantling, fabrication & erection of worn out ducting of boiler & APCD including angle, channel, Flats& flanges 104 Distmantling fabrication and erection of top cone of scruuber of APCD plant 105 Dismantling, Fabrication & Erection damper of boiler ducting 106 Dismantling fabrication & erection of Expansion jointof boiler ducting (3.360 mtr x 1.260 mtr) 107 Replacement of MS gutter of APCD plant from wet scrubber to Ash Pits 108 Dismantling fabrication & erection of Damper of rotary Bagasse Feeder 109 Dismantling, fabrication & erection of worn out portion of ID and APCD fan casing 110 Replacement of sieve plates of APCD scrubber. This job also includes 10/12mm holes (324 holes per square ft.) drillingin plates 111 Baffle plates (MS flat 65 x 6mm) of demister in Wet Scrubber 112 Repair/ replacement of wornout portion of wet scrubber of Boiler No. 1 & 2 113 Replacement of G.I Sheet Gutter of factory building 114 Replacement of worn-out of M.S./ACC Runner of inter carrier, elevator, RBC , cross carrier & cane carrier chains 115 Fabrication and Erection of discharge bagasse chute between last mill and bagasse elevator 116 Part(B)General JobJuice heater/V.L.J.H. SS tubes 1) Dismantling 117 2) Fitting 118 3) Expansion 119 Semi kestner SS tubes 1) Dismantling 120 2) Fitting 121 3) Expansion 122 Quad bodies SS tubesQuad 1st to 4th 1) Dismantling 123 2) Fitting 124 3) Expansion 125 Pans SS/Brass tubesPan1st to 5th 1) Dismantling 126 2) Fittings 127 3) Expansion 128 Welding joints of water, juice, vapour and exhaust pipe lines of all sizes 129 MS Pipe line 1/2 to 12” dia1) Dismantling 130 2) Erection 131 SS Pipe line 1/2 to 12” dia1) Dismantling 132 2) Erection 133 CI Pipe line 1/2 to 12” dia1) Dismantling 134 2)Erection 135 CI Pipe line above 12” dia1)Dismantling 136 2)Erection 137 MS Pipe line above 12” dia from MS plate (other than vapour pipe of pan and quad)1)Dismantling 138 2)Fabrication 139 3)Erection 140 MS Bend upto 12” dia1)Dismantling 141 2)Fabrication 142 3)Erection 143 MS Bend above 12” dia from MS plate (other than V.P. pans & quad) 1)Dismantling 144 2)Fabrication 145 3)Erection 146 CI Bends sizes 1” to 12”1)Dismantling 147 2) Erection 148 Dismantling, Fabrication& Erection of M.S(all sizes)1) Tee, 149 2) Nipples, 150 3) Crosses 151 4) Reducers 152 5) Elbow 153 Dismantling, Fabrication& Erection of S.S(all sizes)1) Tee, 154 2) Nipples, 155 3) Crosses 156 4) Reducers 157 5) Flange 158 6) Elbow 159 7) Bend 160 Replacement of worn out MS Cone(all sizes) 161 MS Flanges(all sizes)1)Dismantling 162 2)Fabrication 163 3)Erection 164 Dismantling , fabrication and erection of Man Holes(all sizes) 165 1) Dismantling of platform. 166 2) Fabrication & Erection of platform 167 M.S. Tankhaving round & rectangular bottoms1)Dismantling 168 2)Fabrication 169 3)Erection 170 M.S. Tankhaving conical bottoms1)Dismantling 171 2)Fabrication 172 3)Erection 173 M.S Structure Trusses, Perlins, Columns & Beams (Factory Building)1)Dismantling 174 2)Fabrication 175 3)Erection 176 Strengthening/ replacement of L-bracket/support between column and beam of factory building structure 177 Platform railing from old pipe & angle 1) Dismantling 178 2) Erection 179 Electric panel ,DB and other machinery shed GI/ACC/MS sheet1)Dismantling 180 2) Fabrication 181 3) Erection 182 Patch work of any part of any equipment with 3mm to 10mm thick plate max. upto 1 sq meter 183 Dismantling of sluice valve/ angle valve/ N.R.V. 184 Erection of sluice valve/ angle valve/ N.R.V. ,Butterfly Valve 185 Replacement of Rail line of caneun-loaderwith 50mm square bar 186 Dismantling, Erection of complete calenderia including tube plates and all necessary connection of 4th body 187 Dismantling, Erection and Fabrication of So2 furnance cooling jacket. 188 Dimantling & fitting of syrup line from syrup sulphiter to pan station 189 Dismantling & fitting of Dorr clarifiers juice coils 190 Replacement of RVF agitator 191 Dismantling of pans old discharge valve and fitting of new butterfly valve 192 Separation of existing pug mill with shaft with each drive into two parts (fore worker & after worker) 193 Replacement of oil trough of crystallizer 194 Replacement of crystallizer massecuite gate 195 Dismantling of existing gear of crystallizer shaft drive & fitting of new planetary gear 196 Replacement of crystallizer shaft drive gear with new one

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 06-Jun-2024 CORRIGENDUM Date 19-Jun-2024
2 18-Jun-2024 CORRIGENDUM1 Date 28-Jun-2024

BOQ

Name of the Work: Fabrication and Erection (Major & General Jobs)
Sl. No. Item Description
1Replacement of worn out M.S. vertical supporting channels & side plate of final molasses storage tank with M.S Plate and channels.
2Replacement of worn outRoofof final molasses storage tank with M.S Plate 4/5/6mm and Supporting Channel /Angle.
3Dismantling ,fabrication & Erection of top MS plate of Pan Shell
4Dismantling ,fabrication and erection of outer body shell of pan from MS plate 10mm/12mm
5Strengthening of pan’s shell with angle and channels in round shape with MS angle 75x75mm and Dia 4.34 mtr. (3 rounds)
6Strengthening of Evaporator shell with angle and channels in round shape with MS angle 75x75mm and Dia 2.80 mtr. (3 rounds)
7Dismantling ,fabrication & Erection of Top cone below save –alof Evaporator
8Dismantling, Fabrication, Erection of Complete Save all (existing design) of evaporators including top plate, inner and outer shell.
9Dismantling, Fabrication, Erection of umbrella of save al Evaporators body as per existing design including all supporting.
10Dismantling, Fabrication and erection ofQuad condensate tank/ Syrup Bottle including all connection. Approx. Size Dia509mmxlength 1800mm
11Dismantling, Fabrication, Erection of Stirrer(Fan) of Aeration Tankat ETP as per existing Design including complete commissioning and trial
12Dismantling, Fabrication, Erection of Hot water Weighing tank of water weighing scale. Dia 1.6 mtr x 1.5 height X cone 1 mtr length .The Erection work for this job will also include all connections which are dismantled during dismantling.
13Dismantling, Fabrication, Erection of Mix juice Weighing tank of Juice weighing scale. Dia 2 mtr x 1.5 height X cone 1 mtr length .The Erection work for this job will also include all connections which are dismantled during dismantling.
14Dismantling, fabrication & Erection of Juice feed boxes of juice heater double beat valve. The Erection work for this job will also include all connections which are dismantled during dismantling.
15Dismantling, fabrication & Erection of absorption tower of Juice Sulphiter. The Erection work for this job will also include all connections which are dismantled during dismantling
16Dismantling, Fabrication & Erection of worn out Stainer of Mix juice tank/ Sulphited Juice tank / Syrup Tank.
17Dismantling, fabrication and Erection of the sulphur furnace with existing design (By 16 mm & 12mm MS plate) This work include dismantling and Erection of all connections, man hole, flanges etc of sulphur Furnace.
18Dismantling, fabrication and Erection of Melter of Sulphur furnace as per Existing design. This work include dismantling and Erection of all connections, man hole, flanges etc.
19Dismantling, fabrication and Erection of Scrubber of Sulphur furnace as per Existing design. This work include dismantling and Erection of all connections, man hole, flanges etc .
20Dismantling, Fabrication & Erection of Dorr coils(Nipple/Flange/ reducer rates as per general fabrication, Erection Rates )
21Dismantling , Fabrication & erection of bottom of 2ndcompartment of dorr clarifier
22Dismantling ,fabrication & erection of the outer shell of dorr clarifier
23Dismantling , Fabrication & erection of top of top compartment.
24Dismantling ,fabrication & erection of shell of foam chamber.
25Dismantling, fabrication and Erection of Mud tank below RVF including all connections.
26Dismantling, fabrication and Erection of worn out Heavy / Light Vacuum tank of RVF including all connections.
27Fabrication & Erection of common juice heater pit tank with top cover and condensate pipe line along with partition plate for sealing in tank, fabrication, erection of bed for motor, fitting of pump, motor with suction and delivery lines inlcudling all connections
28Fabrication & erection of coil of juice heater size 2” along with required connections from the juice heatershell
29Dismantling ,fabrication & Erection Outer body shell of juice heater
30Fabrication & Erection of commonvapourdistribution header after external catchersemi- kestner along with all necessary connections as per drawing
31Fabrication & Erection of filter Juice Sealing Bottle of receiving pit for vacuum filter. The Erection work for this job will also include all connections which are dismantled during dismantling.
32Dismantling fabrication and Erection of filtrate juice receiving pit tanks for vacuum filter.
33Dismantling fabrication and Erection of filtrate juice receiving pit tanks for vacuum filter.
34Dismantling, Fabrication & Erection of Bagacillo Cyclone.
35Dismantling, Fabrication & Erection of Bagacillo Chute.
36Dismantling, Fabrication & Erection of Bottom trough of Mud Mixer for RVF.
37Dismantling, Fabrication & Erection of screw conveyor of Mud Mixer.
38Dismantling, fabrication and Erection of MS vapour pipe of different sizes.Dia- 1050mm
39Dia - 900mm
40Dia - 720mm
41Dia – 670mm
42Dia – 520mm
43Dia – 420mm
44Dismantling, Fabrication & Erection Vapour/Exhaust pipe bend Dia900mm
45Dia - 1050mm
46Dia - 720mm
47Dia – 620mm
48Dia – 520mm
49Dia – 420mm
50Dismantling, fabrication and Erection of distance piece of MS vapour pipe length up to 1.5 mtr.Dia- 1050mm
51Dia - 900mm ,
52Dia - 720mm
53Dia – 620mm
54Dia – 520mm
55Dia – 420mm
56Dismantling of MS/CI condenser cone of Pans
57Fabrication of MS condenser cone ofPans
58Erection of MS/CI condenser cone of Pans
59Dismantling, Fabrication, Erection of umbrellas of pan save all as per existing design including all supporting.
60Replacement of worn out portion of bottom, side plate & supporting angle/channel of syrup and molasses tank at Pan station .
61Replacement of M.S bottomGutter of Crystallizer station and other factory units.
62Replacement of worn out portion ofpan saucer.
63Dismantling, fabrication and Erection of downtake of Pan from 10/12mm plate.
64Replacement of Feed box of Pans including all connections.
65Dismantling, fabrication and ErectionbottomDistributor of pans.
66Dismantling, Fabrication & Erection of Worn out portion of molasses conditioner. This work includes dismantling and Erection of all connection pipes and their drive unit.
67Dismantling, fabrication and Erection of worn out bottom portion of crystallizer
68Dismantling, Fabrication and Erection of worn out portion of C-Vacuum Crystallizer.
69Replacement of crystallizer arms along with supports from 75x75mm M.S angle.(1)Dismantling.
70(2) Fabrication.
71(3) Erection.
72Dismantling, fabrication & Erection of cooling coils3” of Crystallizer including all connections.
73Dismantling and Erection of MS branch pipes of spray pond. This work includes all connections of clusters.
74Dismantling of CI/MS main pipeline spray pond
75Dismantling fabrication & Erection of suction pipes of injection pumps with stainer.
76Dismantling fabrication & Erection of suction pipes of Spray pumps with stainer.
77Dismantling, Fabrication Erection of worn out Bottom half portion of A / B magma mixture including allconnections.
78Dismantling, Fabrication and Erection of worn out Bottom half portion of A pug mill including all connections.
79Dismantling, Fabrication and Erection of worn out A-Magma Mixture complete including all connections.
80Dismantling, Fabrication and Erection of Sugar Melter Pump stainer Including all connections
81Fabrication and Erection of Bed for pump and motor of Magma mixture along with suction and delivery pipe line connections, alignment of motor with pump etc.
82Dismantling, fabrication and Erection of bottom discharge chute of continuous centrifugal machine
83Dismantling, Fabrication and Erection of ammonia coils of pans from MS pipeDia 3”including all connection
84Dismantling and Erection of Complete Calendria with Tube plate (Top and Bottom) of Pan No. 1st& 3rd including all connections ,dismantling & erection ofdistributor and ammoniapipe line
85Fabrication and erection of Beds for Pump and Motor etc.
86Dismantling and Erection of Crystallizer shaft including arms and all connections, Fittings.
87Dismantling, Fabrication and Erection Cane cutter hoods from8-10mm thick plate with MS Angles etc.
88Dismantling and Erection of Expansion joint of power turbine exhaust line.
89Replacement of side plates of cane carrier chain/ RBC and trough of RBC / Bagasse elevator/ Cross RBC.
90Replacement of channel and I-Beam of RBC/ Cane Carrier/ Bagasse Elevator/ Cross RBC Runner
91Dismantling, fabrication erection of juice tray of mill No. 3 from SSplate
92Dismantling, fabrication erection of juice tray of mill No. 3 from MS plate
93Fabrication of screw conveyor of Mill House
94Dismantling, Fabrication , Erection ofscrewconveyortrough ofMill house
95Fabrication and erection of screw conveyor
96Fabrication and erection of screw conveyor (APCD ) plant including motor and gear fitting
97Replacement of Bush of crystallizer ‘s central shaftat drive end
98Replacement of Bush of crystallizer ‘s central shaftatNon - drive end
99Dismantling, fabrication erection of ash hopper of boiler (pyjamas) cone with chute bottom portion( cone tapper portion size 15” approximate)
100Repair of rotary bagasse feeders of boilers1)Body
1012) Rotor
102Replacement of side plate 3mm/old ms plate of boiler (with MS plate & supporting angle/ flat)
103Dismantling, fabrication & erection of worn out ducting of boiler & APCD including angle, channel, Flats& flanges
104Distmantling fabrication and erection of top cone of scruuber of APCD plant
105Dismantling, Fabrication & Erection damper of boiler ducting
106Dismantling fabrication & erection of Expansion jointof boiler ducting (3.360 mtr x 1.260 mtr)
107Replacement of MS gutter of APCD plant from wet scrubber to Ash Pits
108Dismantling fabrication & erection of Damper of rotary Bagasse Feeder
109Dismantling, fabrication & erection of worn out portion of ID and APCD fan casing
110Replacement of sieve plates of APCD scrubber. This job also includes 10/12mm holes (324 holes per square ft.) drillingin plates
111Baffle plates (MS flat 65 x 6mm) of demister in Wet Scrubber
112Repair/ replacement of wornout portion of wet scrubber of Boiler No. 1 & 2
113Replacement of G.I Sheet Gutter of factory building
114Replacement of worn-out of M.S./ACC Runner of inter carrier, elevator, RBC , cross carrier & cane carrier chains
115Fabrication and Erection of discharge bagasse chute between last mill and bagasse elevator
116Part(B)General JobJuice heater/V.L.J.H. SS tubes 1) Dismantling
1172) Fitting
1183) Expansion
119Semi kestner SS tubes 1) Dismantling
1202) Fitting
1213) Expansion
122Quad bodies SS tubesQuad 1st to 4th 1) Dismantling
1232) Fitting
1243) Expansion
125Pans SS/Brass tubesPan1st to 5th 1) Dismantling
1262) Fittings
1273) Expansion
128Welding joints of water, juice, vapour and exhaust pipe lines of all sizes
129MS Pipe line 1/2\" to 12” dia1) Dismantling
1302) Erection
131SS Pipe line 1/2\" to 12” dia1) Dismantling
1322) Erection
133CI Pipe line 1/2\" to 12” dia1) Dismantling
1342)Erection
135CI Pipe line above 12” dia1)Dismantling
1362)Erection
137MS Pipe line above 12” dia from MS plate (other than vapour pipe of pan and quad)1)Dismantling
1382)Fabrication
1393)Erection
140MS Bend upto 12” dia1)Dismantling
1412)Fabrication
1423)Erection
143MS Bend above 12” dia from MS plate (other than V.P. pans & quad) 1)Dismantling
1442)Fabrication
1453)Erection
146CI Bends sizes 1” to 12”1)Dismantling
1472) Erection
148Dismantling, Fabrication& Erection of M.S(all sizes)1) Tee,
1492) Nipples,
1503) Crosses
1514) Reducers
1525) Elbow
153Dismantling, Fabrication& Erection of S.S(all sizes)1) Tee,
1542) Nipples,
1553) Crosses
1564) Reducers
1575) Flange
1586) Elbow
1597) Bend
160Replacement of worn out MS Cone(all sizes)
161MS Flanges(all sizes)1)Dismantling
1622)Fabrication
1633)Erection
164Dismantling , fabrication and erection of Man Holes(all sizes)
1651) Dismantling of platform.
1662) Fabrication & Erection of platform
167M.S. Tankhaving round & rectangular bottoms1)Dismantling
1682)Fabrication
1693)Erection
170M.S. Tankhaving conical bottoms1)Dismantling
1712)Fabrication
1723)Erection
173M.S Structure Trusses, Perlins, Columns & Beams (Factory Building)1)Dismantling
1742)Fabrication
1753)Erection
176Strengthening/ replacement of L-bracket/support between column and beam of factory building structure
177Platform railing from old pipe & angle 1) Dismantling
1782) Erection
179Electric panel ,DB and other machinery shed GI/ACC/MS sheet1)Dismantling
1802) Fabrication
1813) Erection
182Patch work of any part of any equipment with 3mm to 10mm thick plate max. upto 1 sq meter
183Dismantling of sluice valve/ angle valve/ N.R.V.
184Erection of sluice valve/ angle valve/ N.R.V. ,Butterfly Valve
185Replacement of Rail line of caneun-loaderwith 50mm square bar
186Dismantling, Erection of complete calenderia including tube plates and all necessary connection of 4th body
187Dismantling, Erection and Fabrication of So2 furnance cooling jacket.
188Dimantling & fitting of syrup line from syrup sulphiter to pan station
189Dismantling & fitting of Dorr clarifier\"s juice coils
190Replacement of RVF agitator
191Dismantling of pan\"s old discharge valve and fitting of new butterfly valve
192Separation of existing pug mill with shaft with each drive into two parts (fore worker & after worker)
193Replacement of oil trough of crystallizer
194Replacement of crystallizer massecuite gate
195Dismantling of existing gear of crystallizer shaft drive & fitting of new planetary gear
196Replacement of crystallizer shaft drive gear with new one

AI Tender Summary

OUR REF NO 43542163
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 28-06-2024
Authority
Authority Name Department of Cooperation
Work Description Tender For Fabrication And Erection (Major & General Jobs); 1 Replacement of worn out M.S. vertical supporting channels & side plate of final molasses storage tank with M.S Plate and channels. 2 Replacement of worn outRoofof final molasses storage tank with M.S Plate 4/5/6mm and Supporting Channel /Angle. 3 Dismantling ,fabrication & Erection of top MS plate of Pan Shell 4 Dismantling ,fabrication and erection of outer body shell of pan from MS plate 10mm/12mm 5 Strengthening of pan’s shell with angle and channels in round shape with MS angle 75x75mm and Dia 4.34 mtr. (3 rounds) 6 Strengthening of Evaporator shell with angle and channels in round shape with MS angle 75x75mm and Dia 2.80 mtr. (3 rounds) 7 Dismantling ,fabrication & Erection of Top cone below save –alof Evaporator 8 Dismantling, Fabrication, Erection of Complete Save all (existing design) of evaporators including top plate, inner and outer shell. 9 Dismantling, Fabrication, Erection of umbrella of save al Evaporators body as per existing design including all supporting. 10 Dismantling, Fabrication and erection ofQuad condensate tank/ Syrup Bottle including all connection. Approx. Size Dia509mmxlength 1800mm 11 Dismantling, Fabrication, Erection of Stirrer(Fan) of Aeration Tankat ETP as per existing Design including complete commissioning and trial 12 Dismantling, Fabrication, Erection of Hot water Weighing tank of water weighing scale. Dia 1.6 mtr x 1.5 height X cone 1 mtr length .The Erection work for this job will also include all connections which are dismantled during dismantling. 13 Dismantling, Fabrication, Erection of Mix juice Weighing tank of Juice weighing scale. Dia 2 mtr x 1.5 height X cone 1 mtr length .The Erection work for this job will also include all connections which are dismantled during dismantling. 14 Dismantling, fabrication & Erection of Juice feed boxes of juice heater double beat valve. The Erection work for this job will also include all connections which are dismantled during dismantling. 15 Dismantling, fabrication & Erection of absorption tower of Juice Sulphiter. The Erection work for this job will also include all connections which are dismantled during dismantling 16 Dismantling, Fabrication & Erection of worn out Stainer of Mix juice tank/ Sulphited Juice tank / Syrup Tank. 17 Dismantling, fabrication and Erection of the sulphur furnace with existing design (By 16 mm & 12mm MS plate) This work include dismantling and Erection of all connections, man hole, flanges etc of sulphur Furnace. 18 Dismantling, fabrication and Erection of Melter of Sulphur furnace as per Existing design. This work include dismantling and Erection of all connections, man hole, flanges etc. 19 Dismantling, fabrication and Erection of Scrubber of Sulphur furnace as per Existing design. This work include dismantling and Erection of all connections, man hole, flanges etc . 20 Dismantling, Fabrication & Erection of Dorr coils(Nipple/Flange/ reducer rates as per general fabrication, Erection Rates ) 21 Dismantling , Fabrication & erection of bottom of 2ndcompartment of dorr clarifier 22 Dismantling ,fabrication & erection of the outer shell of dorr clarifier 23 Dismantling , Fabrication & erection of top of top compartment. 24 Dismantling ,fabrication & erection of shell of foam chamber. 25 Dismantling, fabrication and Erection of Mud tank below RVF including all connections. 26 Dismantling, fabrication and Erection of worn out Heavy / Light Vacuum tank of RVF including all connections. 27 Fabrication & Erection of common juice heater pit tank with top cover and condensate pipe line along with partition plate for sealing in tank, fabrication, erection of bed for motor, fitting of pump, motor with suction and delivery lines inlcudling all connections 28 Fabrication & erection of coil of juice heater size 2” along with required connections from the juice heatershell 29 Dismantling ,fabrication & Erection Outer body shell of juice heater 30 Fabrication & Erection of commonvapourdistribution header after external catchersemi- kestner along with all necessary connections as per drawing 31 Fabrication & Erection of filter Juice Sealing Bottle of receiving pit for vacuum filter. The Erection work for this job will also include all connections which are dismantled during dismantling. 32 Dismantling fabrication and Erection of filtrate juice receiving pit tanks for vacuum filter. 33 Dismantling fabrication and Erection of filtrate juice receiving pit tanks for vacuum filter. 34 Dismantling, Fabrication & Erection of Bagacillo Cyclone. 35 Dismantling, Fabrication & Erection of Bagacillo Chute. 36 Dismantling, Fabrication & Erection of Bottom trough of Mud Mixer for RVF. 37 Dismantling, Fabrication & Erection of screw conveyor of Mud Mixer. 38 Dismantling, fabrication and Erection of MS vapour pipe of different sizes.Dia- 1050mm 39 Dia - 900mm 40 Dia - 720mm 41 Dia – 670mm 42 Dia – 520mm 43 Dia – 420mm 44 Dismantling, Fabrication & Erection Vapour/Exhaust pipe bend Dia900mm 45 Dia - 1050mm 46 Dia - 720mm 47 Dia – 620mm 48 Dia – 520mm 49 Dia – 420mm 50 Dismantling, fabrication and Erection of distance piece of MS vapour pipe length up to 1.5 mtr.Dia- 1050mm 51 Dia - 900mm , 52 Dia - 720mm 53 Dia – 620mm 54 Dia – 520mm 55 Dia – 420mm 56 Dismantling of MS/CI condenser cone of Pans 57 Fabrication of MS condenser cone ofPans 58 Erection of MS/CI condenser cone of Pans 59 Dismantling, Fabrication, Erection of umbrellas of pan save all as per existing design including all supporting. 60 Replacement of worn out portion of bottom, side plate & supporting angle/channel of syrup and molasses tank at Pan station . 61 Replacement of M.S bottomGutter of Crystallizer station and other factory units. 62 Replacement of worn out portion ofpan saucer. 63 Dismantling, fabrication and Erection of downtake of Pan from 10/12mm plate. 64 Replacement of Feed box of Pans including all connections. 65 Dismantling, fabrication and ErectionbottomDistributor of pans. 66 Dismantling, Fabrication & Erection of Worn out portion of molasses conditioner. This work includes dismantling and Erection of all connection pipes and their drive unit. 67 Dismantling, fabrication and Erection of worn out bottom portion of crystallizer 68 Dismantling, Fabrication and Erection of worn out portion of C-Vacuum Crystallizer. 69 Replacement of crystallizer arms along with supports from 75x75mm M.S angle.(1)Dismantling. 70 (2) Fabrication. 71 (3) Erection. 72 Dismantling, fabrication & Erection of cooling coils3” of Crystallizer including all connections. 73 Dismantling and Erection of MS branch pipes of spray pond. This work includes all connections of clusters. 74 Dismantling of CI/MS main pipeline spray pond 75 Dismantling fabrication & Erection of suction pipes of injection pumps with stainer. 76 Dismantling fabrication & Erection of suction pipes of Spray pumps with stainer. 77 Dismantling, Fabrication Erection of worn out Bottom half portion of A / B magma mixture including allconnections. 78 Dismantling, Fabrication and Erection of worn out Bottom half portion of A pug mill including all connections. 79 Dismantling, Fabrication and Erection of worn out A-Magma Mixture complete including all connections. 80 Dismantling, Fabrication and Erection of Sugar Melter Pump stainer Including all connections 81 Fabrication and Erection of Bed for pump and motor of Magma mixture along with suction and delivery pipe line connections, alignment of motor with pump etc. 82 Dismantling, fabrication and Erection of bottom discharge chute of continuous centrifugal machine 83 Dismantling, Fabrication and Erection of ammonia coils of pans from MS pipeDia 3”including all connection 84 Dismantling and Erection of Complete Calendria with Tube plate (Top and Bottom) of Pan No. 1st& 3rd including all connections ,dismantling & erection ofdistributor and ammoniapipe line 85 Fabrication and erection of Beds for Pump and Motor etc. 86 Dismantling and Erection of Crystallizer shaft including arms and all connections, Fittings. 87 Dismantling, Fabrication and Erection Cane cutter hoods from8-10mm thick plate with MS Angles etc. 88 Dismantling and Erection of Expansion joint of power turbine exhaust line. 89 Replacement of side plates of cane carrier chain/ RBC and trough of RBC / Bagasse elevator/ Cross RBC. 90 Replacement of channel and I-Beam of RBC/ Cane Carrier/ Bagasse Elevator/ Cross RBC Runner 91 Dismantling, fabrication erection of juice tray of mill No. 3 from SSplate 92 Dismantling, fabrication erection of juice tray of mill No. 3 from MS plate 93 Fabrication of screw conveyor of Mill House 94 Dismantling, Fabrication , Erection ofscrewconveyortrough ofMill house 95 Fabrication and erection of screw conveyor 96 Fabrication and erection of screw conveyor (APCD ) plant including motor and gear fitting 97 Replacement of Bush of crystallizer ‘s central shaftat drive end 98 Replacement of Bush of crystallizer ‘s central shaftatNon - drive end 99 Dismantling, fabrication erection of ash hopper of boiler (pyjamas) cone with chute bottom portion( cone tapper portion size 15” approximate) 100 Repair of rotary bagasse feeders of boilers1)Body 101 2) Rotor 102 Replacement of side plate 3mm/old ms plate of boiler (with MS plate & supporting angle/ flat) 103 Dismantling, fabrication & erection of worn out ducting of boiler & APCD including angle, channel, Flats& flanges 104 Distmantling fabrication and erection of top cone of scruuber of APCD plant 105 Dismantling, Fabrication & Erection damper of boiler ducting 106 Dismantling fabrication & erection of Expansion jointof boiler ducting (3.360 mtr x 1.260 mtr) 107 Replacement of MS gutter of APCD plant from wet scrubber to Ash Pits 108 Dismantling fabrication & erection of Damper of rotary Bagasse Feeder 109 Dismantling, fabrication & erection of worn out portion of ID and APCD fan casing 110 Replacement of sieve plates of APCD scrubber. This job also includes 10/12mm holes (324 holes per square ft.) drillingin plates 111 Baffle plates (MS flat 65 x 6mm) of demister in Wet Scrubber 112 Repair/ replacement of wornout portion of wet scrubber of Boiler No. 1 & 2 113 Replacement of G.I Sheet Gutter of factory building 114 Replacement of worn-out of M.S./ACC Runner of inter carrier, elevator, RBC , cross carrier & cane carrier chains 115 Fabrication and Erection of discharge bagasse chute between last mill and bagasse elevator 116 Part(B)General JobJuice heater/V.L.J.H. SS tubes 1) Dismantling 117 2) Fitting 118 3) Expansion 119 Semi kestner SS tubes 1) Dismantling 120 2) Fitting 121 3) Expansion 122 Quad bodies SS tubesQuad 1st to 4th 1) Dismantling 123 2) Fitting 124 3) Expansion 125 Pans SS/Brass tubesPan1st to 5th 1) Dismantling 126 2) Fittings 127 3) Expansion 128 Welding joints of water, juice, vapour and exhaust pipe lines of all sizes 129 MS Pipe line 1/2 to 12” dia1) Dismantling 130 2) Erection 131 SS Pipe line 1/2 to 12” dia1) Dismantling 132 2) Erection 133 CI Pipe line 1/2 to 12” dia1) Dismantling 134 2)Erection 135 CI Pipe line above 12” dia1)Dismantling 136 2)Erection 137 MS Pipe line above 12” dia from MS plate (other than vapour pipe of pan and quad)1)Dismantling 138 2)Fabrication 139 3)Erection 140 MS Bend upto 12” dia1)Dismantling 141 2)Fabrication 142 3)Erection 143 MS Bend above 12” dia from MS plate (other than V.P. pans & quad) 1)Dismantling 144 2)Fabrication 145 3)Erection 146 CI Bends sizes 1” to 12”1)Dismantling 147 2) Erection 148 Dismantling, Fabrication& Erection of M.S(all sizes)1) Tee, 149 2) Nipples, 150 3) Crosses 151 4) Reducers 152 5) Elbow 153 Dismantling, Fabrication& Erection of S.S(all sizes)1) Tee, 154 2) Nipples, 155 3) Crosses 156 4) Reducers 157 5) Flange 158 6) Elbow 159 7) Bend 160 Replacement of worn out MS Cone(all sizes) 161 MS Flanges(all sizes)1)Dismantling 162 2)Fabrication 163 3)Erection 164 Dismantling , fabrication and erection of Man Holes(all sizes) 165 1) Dismantling of platform. 166 2) Fabrication & Erection of platform 167 M.S. Tankhaving round & rectangular bottoms1)Dismantling 168 2)Fabrication 169 3)Erection 170 M.S. Tankhaving conical bottoms1)Dismantling 171 2)Fabrication 172 3)Erection 173 M.S Structure Trusses, Perlins, Columns & Beams (Factory Building)1)Dismantling 174 2)Fabrication 175 3)Erection 176 Strengthening/ replacement of L-bracket/support between column and beam of factory building structure 177 Platform railing from old pipe & angle 1) Dismantling 178 2) Erection 179 Electric panel ,DB and other machinery shed GI/ACC/MS sheet1)Dismantling 180 2) Fabrication 181 3) Erection 182 Patch work of any part of any equipment with 3mm to 10mm thick plate max. upto 1 sq meter 183 Dismantling of sluice valve/ angle valve/ N.R.V. 184 Erection of sluice valve/ angle valve/ N.R.V. ,Butterfly Valve 185 Replacement of Rail line of caneun-loaderwith 50mm square bar 186 Dismantling, Erection of complete calenderia including tube plates and all necessary connection of 4th body 187 Dismantling, Erection and Fabrication of So2 furnance cooling jacket. 188 Dimantling & fitting of syrup line from syrup sulphiter to pan station 189 Dismantling & fitting of Dorr clarifiers juice coils 190 Replacement of RVF agitator 191 Dismantling of pans old discharge valve and fitting of new butterfly valve 192 Separation of existing pug mill with shaft with each drive into two parts (fore worker & after worker) 193 Replacement of oil trough of crystallizer 194 Replacement of crystallizer massecuite gate 195 Dismantling of existing gear of crystallizer shaft drive & fitting of new planetary gear 196 Replacement of crystallizer shaft drive gear with new one
Basic Detail
Tender No MAJOR AND GENERAL JOBS
Bidding Type Tender
Location
City Ludhiana
State Punjab
Key Dates
Publish Date 18 Jun 2024
Submission Date 28 Jun 2024
Open Date 28 Jun 2024
Finance
Tender Value Ref. Documents
Tender Fee 1
EMD 50000
Exemption Not Available
Document List
d28e1d45-1373-4e5d-a84d-855715a37fda.html
BOQ_248531.xls
DNIT.pdf
TechnicalBid.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 18, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Jun 19, 2024
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 28, 2024
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 28, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jun 28, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

d28e1d45-1373-4e5d-a84d-855715a37fda.html

xls

BOQ_248531.xls

pdf

DNIT.pdf

xls

TechnicalBid.xls

pdf

Tendernotice_1.pdf

Disclaimer