Tender For 2000152127-14 Inch Ci Pipe Line Replacement-1 Km 00152127 20 10 10 Erection & Fabrication of Pipe 14,280 INM Email : K.Pardhasaradhi@ext.amns.in Contact : Name : K Pardhasaradhi Item Details : Sl. No Ser code Service Description Uom Qty Rate Amount 1 3007182 Erection and Fabrication of CI push on underground pipeline INM 14,280 SCOPE OF WORK: AMNS Water required to operate the plant is being taken from GVMC through a 14 pipeline through a stretch of 8 km from NSTL and is being dumped in the reservoir having a volume of 36,000 M3 capacity, daily GVMC water consumption per plant will be appx 1,000 M3 per day. based on the plant requirement. Recently VPA and Railways have carried out few upliftment at the back side of the pellet plant due to which few unseen damages have been happened to the pipeline, repair of the same has been taken up on exigency basis to meet plant requirement. A. Proposal: - Going further, VPA is carrying out the development in and around the port area where our pipeline is passing underneath the developed yards. To avoid the envisaged breakdown of the water line due to the increase in the load on the ground. to replace the GVMC line to a stretch of 1 km from the feeding point to AMNS towards NSTL side. • Installation <(>&<)> removal of the 14-inch new CI Pipeline a stretch of 1 km stretch at AMNS Visakhapatnam. Note: Vendor Should have a Field survey along with M/S AMNS Executive before submission of the Bid Scope of work Civil: - • Centerline Survey of existing line <(>&<)> survey of proposed line placement. • Site preparation for carrying out civil and piping activities. • The vendor should perform the field detection of the ROW with Pipe detector to ensure. • Trenching and Excavation required for installation of new line. • Back filling of the pipe line trench after getting clearance from M/S AMNS executive • Supply and spreading soft soil before laying of the pipe lines.as per AMNS engineer in charge. • The trench shall be excavated to such depth as, required to provide the minimum cover and the pipeline configuration as specified. The pipeline profile of the crossing shall be followed as accurately as possible. Before laying, the trench shall be cleaned and leveled. The trench shall be subject to inspection by M/s- AMNS before installation of the pipe line. • Trenching shall include all excavation, whether by trenching machine, back-hoe, power shovel, by hand, by blasting or by other methods which may be necessary to prepare a trench for the pipe with the minimum cover between top of pipe and immediate ground level as set forth in this specification. • Execution of civil work required at road, canal, drain, nala, utility and minor water course crossings by conventional method including installation of carrier pipe inside casing pipe at cased crossings wherever required is under contractor scope, restoration of the same is also under contractor scope. • The Contractor should mobilize all the necessary infrastructure required for the project such as Excavator, tractors and other earth Page 2 of 3 ArcelorMittal Nippon Steel India Limited AM/NS PELLETS VIZAG Near Flyover, Scindia Road,Visakhapatnam,530004,Andhra Pradesh,India GSTIN 37AAACE1741P1ZG PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000113868 Date 31.05.2024 Submission Date 09.06.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ null Sravan Lanka Contact Email sravan.lanka@ext.amns.in MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details moving equipment as per the execution requirement. • The contractor should provide All earth moving equipment’s of recommended year of manufacturing should not be earlier than 2018 and must be in good operating condition (Proof of the Year of Mfg <(>&<)> insurance related documents has to be submitted to Engineer in charge. • Dewatering with necessary equipment is under vendor scope. • Surplus excavated material should be shifted 2 KM from plant, necessary equipment is also vendor scope. Scope of work for Pipe Line Mechanical: - • Field survey of the total stretch and listing out the BOM required <(>&<)> Bends required for execution. • Shifting raw material like CI pipe line and pipe fittings from AMNS storage yard to execution place. • The Contractor should mobilize all the necessary infrastructure required for the project such as Hydra, trailers and other lifting equipment as per the execution requirement. • preparation of the spool pieces where ever required is under vendor scope. • Field joint of the pipe lines based on laying plan. • Vendor should provided all consumables like special gums, cement bags gasket ring joint for installation of pipeline. • For casing pipe usage at crossings, insulators <(>&<)> end shields to be used. • Retrieval of old line after successful commissioning of new GVMC pipeline. • Shifting of retrieved old lines to PS-II location. HSE • Safety PPEs like Helmet, shoe, glasses, gloves, safety belts are in the contractor scope. • Daily Safety toolbox talk to be conducted by the respective contractor. • Its mandatory to give ID card and job skill type designation to the workers. • An engineer, Safety officer and supervisor not less than 4 years’ experience to be appointed till completion of the job. • Safety if the prime concern and responsibility any deviation in safety will leads to termination of the contract. • All workers should go with industrial training and only after that gate pass will be issued. • All workers should have entered through scrum system. • Risk assessment on job at site to be before executing the erection activity. • Vendor is responsible for making the erection plan/method study in coordination with M/S AMNS in charge. The document to be approved by safety officer and M/s AMNS in charge, only then the clearance will be provided with necessary comments for inclusion. • Daily activity to be started only after receiving the approved permit from the respective engineer. • M/s AMNS Safety officer is having right to hold the activity at time if at all any unsafe condition is noticed. • Medical Test <(>&<)> scrum entry mandatory. • All the activities that are executed under the contract should come under the HIRA and SOP Bank of M/S AMNS <(>&<)> the team working need to attend training programs to become well-versed with the procedures <(>&<)> then need to be deployed for field activities, after wards based on site safety review, the team must attend safety training programs (minimum requirement is 10 man-days/ Fortnight). • Job safety analysis will be carried out and documented by M/S AMNS, and the same is to be strictly adhered while carrying out execution. • FATALITY PREVENTION STANDARD GUIDELINES(FPS standard ) need to be followed. • Any violence in safety will lead to penalize of Rs. 5% to 10% of order value for first 2 warnings <(>&<)> 3rd time will be leads to termination Page 3 of 3 ArcelorMittal Nippon Steel India Limited AM/NS PELLETS VIZAG Near Flyover, Scindia Road,Visakhapatnam,530004,Andhra Pradesh,India GSTIN 37AAACE1741P1ZG PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000113868 Date 31.05.2024 Submission Date 09.06.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ null Sravan Lanka Contact Email sravan.lanka@ext.amns.in MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details and closing of the work order. • The vendor should deploy one qualified Safety officer and one site in charge, (having more than 5 years’ experience) along with relevant experienced manpower with required skill levels to meet the company standards (Competency will be checked <(>&<)> certified by AMNS executive). • Qualified Safety officer deployment is must and if the not deployed a amount of INR 35,000/- will be deducted on monthly basis. • Safety is mandatory and prime if any deviation noticed will be penalised with INR 25000/- and if 3 times it repeats will leads to closer of the order. • Only industrial plug tops are allowed. • Safety nets to be used where necessary. • Job to be carried out as per the Job safety analysis. AMNS scope • Pipelines with pipe fittings. • Power <(>&<)> construction water. • Any types of RCC pedest