}

Tender For Electrical Works On Contact Basis In 2024- 25, rohtak-Haryana

Haryana Sugar Federation has published Tender For Electrical Works On Contact Basis In 2024- 25. Submission Date for this Tender is 10-06-2024. Electrical Maintenance Tenders in rohtak Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

43513527
Tender For Electrical Works On Contact Basis In 2024- 25
Open Tender
Indian
Haryana
Rohtak
10-06-2024

Tender Details

Tender For Electrical works on contact basis in 2024- 25- L.T.Cable lying at air ( a) 1.5 mm2 to 6 mm2 2 (b) 10 mm2 to 35 mm2 3 (c )50 mm2 to 95 mm2 4 (d )120 mm2 to 240 mm2 5 (e)300 mm2 to 400 mm2 6 H.T Cable lying at air ( a) 150 mm2 to 250 mm2 7 (b) 250 mm2 to 300 mm2 8 L.T cable lying at underground existing/newTrenches complete with all necessary Connection, including digging & filling (a) 1.5 mm2 to 6 mm2 9 (b) 10 mm2 to 35 mm2 10 (c )50 mm2 to 95 mm2 11 (d )120 mm2 to 240 mm2 12 (e)300 mm2 to 400 mm2 13 Lug crimping LT(a) 1.5 mm2 to 6 mm2 14 (b)10 mm2 to 35 mm2 15 (c)50 mm2 to 95 mm2 16 (d)120 mm2 to 240 mm2 17 (e)300 m2 to 400 m2 18 Lug crimping HT ( 11 kv) ( a) 150 mm2 to 250 mm2 19 (b) 250 mm2 to 300 mm2 20 Dismantling of LT cables from underground cable trench.a)- 1.5 mm2 to 6 mm2 21 (b) 10 mm2 to 35 mm2 22 (c )50 mm2 to 95 mm2 23 (d )120 mm2 to 240 mm2 24 (e)300 mm2 to 400 mm2 25 Dismantling of LT cables from cable tray above ground.a)- 1.5 mm2 to 6 mm2 26 (b) 10 mm2 to 35 mm2 27 (c )50 mm2 to 95 mm2 28 (d )120 mm2 to 240 mm2 29 (e)300 mm2 to 400 mm2 30 Fabrication of Panel shed with colour coated G.I perforated sheets with materialper sq.ft. 31 Fabrication of motor shed per sq.ft. 32 Fabrication & erection of pole with old material digging & necessary earth filling complete in all respect per ft. 33 Erection and commissioning of new earthing pit with material G.I plate earthing. 34 Erection and commissioning of new earthing pit with materialCopper plate earthing. 35 H.T cable 3C x 240 mm2and 3C x 300 mm2 HT kit filling with material (Raychem & 3M). 36 Testing and recharging of old earthing pit complete in all respect. 37 Fabrication of cable tray with old material. (i) Up to 50mm width 38 Fabrication of cable tray with old material. (ii) 50-100mm width 39 Fabrication of cable tray with old material. (iii) 200-250mm width 40 Erection of cable tray and installation. (i) upto 50mm width 41 Erection of cable tray and installation. (ii)50-100mm width 42 Erection of cable tray and installation. (iii) 200-250mm width 43 LT panel shifting work 44 Painting of 16MVA transformer. 45 Painting of 3MVA transformer. 46 Painting of ESP tranformer. 47 Painting of MCC and PCC panels. 48 Painting of various sizes of motors 49 H.T panels shifting. 50 Dismantling of HT cables from underground cable trench. (i) 150-240 sqmm 51 Dismantling of HT cables from underground cable trench. (ii) 300 sqmm 52 Dismantling of HT cables from cable tray above ground. (i) 150-240 sqmm 53 Dismantling of HT cables from cable tray above ground. (ii) 300 sqmm 54 Electrical wiring at rooms and offices in plants (per square feet area) 55 Installation & Dismantling of lightening arrestor 33KV 56 Installation & Dismantling of line isolator33KV 57 Installation & Dismantling of bus bas of 33KV 58 Installation & dismantling of earthling isolator 33KV 59 Dismantling of old electrical panel shed. 60 Painting of bus bar duct box 61 Installation of new ACB 600-800AMP 62 Installation of new ACB 800-1000AMP 63 Installation of new ACB 1000-2000AMP 64 Installation of new ACB 2000-4000AMP 65 Dismantling of old ACB 600-800 AMP 66 Dismantling of old ACB 800-1000 AMP 67 Dismantling of old ACB 1000-2000 AMP 68 Cleaning& tightness of L.T panels i.e modification and tighten of bus bar, cleaning and changing of insulator, removal of rusted nut bolts and changing of new nuts bolts complete in all respect. 69 Cleaning& tightness of H.T panels i.e modification and tighten of bus bar, cleaning and changing of insulator, removal of rusted nut bolts and changing of new nuts bolts complete in all respect. 70 Painting and cleaning of C.T and P.T of 33KV 71 Dismantling and installing of 11KV C. T. and P.T 72 Dismantling and installing of 33KV C. T. and P.T 73 Erection, commissioning and repairing of 11KV transformers ducting’s 74 Shifting and installation of electrical motors1 HP to 20 HP 75 Shifting and installation of electrical motors25 HP to 50 HP 76 Shifting and installation of electrical motors60 HP to 100 HP 77 Shifting and installation of electrical motors120 HP to 150 HP 78 Shifting and installation of electrical motors200 HP to 300 HP 79 Shifting and installation of electrical motors320 HP to 400 HP 80 Dismantling and shifting of old/damaged lighting poles 81 Installation of new lighting poles including digging, filling complete in all respect. 82 Installation & connect of LED street light on lighting poles 50 watt to 100 watt 83 Dismantling of LED street light from on lighting poles 50 watt to 100 watt. 84 Installation and connection of plant HPSV and HPMV lights at various houses 150watt. 85 Installation and connection of plant HPSV and HPMV lights at various houses 250watt. 86 Installation and connection of plant HPSV and HPMV lights at various houses 400watt. 87 Dismantling of plant HPSV and HPMV lights at various houses 150 watt 88 Dismantling of plant HPSV and HPMV lights at various houses 250 watt 89 Dismantling of plant HPSV and HPMV lights at various houses 400 watt 90 Fabrication and erection of electrical panels box

Key Value

Document Fees
INR 100 /-
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail