}

Bids Are Invited For Undertaking Icgs Sarthak Erdd As Per Enclosed Scope Of Work - Description Of Defect Underwater Work Package (Underwater Area - 1180 Sq Mtr And Boot Top Area- 310 Sq Mtr) Total Area- 1490 Sq Mtr Remove, Clean, Examine And Refit All C, South Goa-Goa

Statutory Bodies & Commissions/Committees has published Bids Are Invited For Undertaking Icgs Sarthak Erdd As Per Enclosed Scope Of Work - Description Of Defect Underwater Work Package (Underwater Area - 1180 Sq Mtr And Boot Top Area- 310 Sq Mtr) Total Area- 1490 Sq Mtr Remove, Clean, Examine And Refit All C. Submission Date for this Tender is 14-06-2024. Commercial Marine Vehicle Tenders in South Goa Goa. Bidders can get complete Tender details and download the document.




Tender Notice

43512034
Corrigendum : Bids Are Invited For Undertaking Icgs Sarthak Erdd As Per Enclosed Scope Of Work - Description Of Defect Underwater Work Package (Underwater Area - 1180 Sq Mtr And Boot Top Area- 310 Sq Mtr) Total Area- 1490 Sq Mtr Remove, Clean, Examine And Refit All C
Open Tender
Indian
Goa
South Goa
14-06-2024

Tender Details

Bids Are Invited For Undertaking Icgs Sarthak Erdd As Per Enclosed Scope Of Work - DESCRIPTION OF DEFECT UNDERWATER WORK PACKAGE (UNDERWATER AREA - 1180 SQ MTR AND BOOT TOP AREA- 310 SQ MTR) TOTAL AREA- 1490 SQ MTR Remove, clean, examine and refit all chest gratings (Qty-24 Nos). Clean sea tube inlet and sea chest area. Paint to be applied on sea tubes and grating as per CGBR-382 (Issue-2). Paint and Material – Yard supply. Paint Make – M/s Akzo Nobel. The details of Sea Tubes/ Sea Chest are as follows :- Ser Description (a) DD Emergency Fire Pump Suction (b) Gear Box Driven SW Cooling Pump Suction (P) (c) Ext Fi-Fi Pump Suction (P) (d) GB Standby (Motor driven) SW Pump Suction (P) (e) FW Generator Port (WHR) suction (f) Bilge & Ballast Pump no. 1 Suction (S) (g) Main DG no. 1 SW Cooling Pump Suction (S) (h) Main DG no. 2 SW Cooling Pump Suction (S) (j) Fire Main & Sprinkling Pump no. 1 Suction (S) (k) ME (P) SW Cooling Pump Sea Chest Suction (l) GB Standby (Motor driven) SW Pump Suction (S) (m) Ext Fi-Fi Pump Suction (S) (n) Bilge & Ballast Pump no. 2 Suction (P) (p) Fire Main & Sprinkling Pump no. 2 Suction (P) (q) GB Driven SW Cooling Pump Suction (S) (r) FW Generator Stbd (WHR) Suction (s) Main DG no. 3 SW Cooling Pump Suction (P) (t) Main DG no. 4 SW Cooling Pump Suction (P) (u) ME (S) SW Cooling Pump Sea Chest Suction (v) AC & Ref. Cooling Pump no. 1 Suction (w) AC & Ref. Cooling Pump no. 2 Suction (x) FW Generator RO Type no. 1 Suction (y) FW Generator RO Type no. 2 Suction (z) Magazine Compt Flooding Ultrasonic survey including hammer test/ visual survey of underwater hull & boot top area including all U/W appendages (100 % visual and endoscopy of all sea tubes) is to be carried out in presence of class surveyor, CGRPT, SS and Yard Reps paying particular attention to hull plating, shafts and brackets, rope guards, eddy plates, sea chest, both side draught marking and plating below machinery compartments. Area deteriorated beyond permissible limit is to be cropped and renewed as per surveyor’s recommendations. firm to cater 1500 UTG points and 05 tons (approx.) steel (ABS Grade B) renewal including all strengthening members and associated fittings in the area. Pressure test of tanks is to be carried out, in case steel renewal is undertaken in tanks area. Yard to provide 07 copies of survey report, UTG report (in tabular and sketch format with adequate quality of presentation and accuracy of information) endorsed by class surveyor and details of steel renewal. Class surveyor to be involved for all plate fit-up survey and final survey inspection for each underwater steel renewal location. Weld seam inspection and NDT as recommended by class is to be undertaken for underwater hull steel renewed plates. De-gutting/ re-gutting and in-way job including insulation/ lagging renewal to be included. Steel Grade – Mild Steel ABS Grade B, Thickness of steel – 12 mm/10 mm, Material and Steel – Yard Supply. All inway jobs included. UTG Underwater storm valves (Dia- 65 mm) to be overhauled, pressure tested (3.5 Kg/cm2) and painting with 02 coats (one coat primer and one coat paint as per existing colour coding) to be carried out. Position of indicating gear of underwater storm valves to be adjusted to agree with position of valves when shut. All securing studs to be lightly tapped with a hammer and if any of those dislodges, all studs in the same area to be renewed. Packing gasket between flanges to be renewed as per sample. All inway job included. Material – Yard supply. The location of underwater storm valves are as follows:- Ser Location Qty (a) Baggage Room 01 No. (b) FER 02 Nos (c) AMR 01 No (d) Fin Stabilizer 01 No (e) AER 01 No (Insulated) (f) Wine Store 01 No (g) Ward Room Store 01 No (h) Record room 01 No (j) Provision Store 01 No (Insulated) (k) Victualing Store 01 No (l) Electronic store 01 No Total = 12 Nos Prepare surface area (entire under water hull and boot top areas including all U/W appendages) to SA 2.5 by abrasive shot blasting/hydro blasting as per Annexure-3D of CGBR-382 (Issue-2). Carry out touch up paint scheme as per CGBR-382 (Issue-2) using airless spray machine in presence of paint manufacturer (Akzo Nobel) representative. Underwater hull exposed to bare metal to be repaired by scraping the surrounding coating back to a sound feathering edge followed by shot blasting to SA 2.5 and touching up with full paint scheme. Surfaces prior to application of painting, temperature/ humidity/ paint preparation are to be certified by paint rep. DFT to be achieved post completion of painting and same to be certified by paint representative. Total underwater area – 1180 sq mtr, Boot top area – 310 sq mtr. Paint scheme - M/s Akzo Nobel, Paint – Yard supply. The details of touch-up paint requirement for underwater area and boot top area is as follows:- Paint Primer Interguard 269 EGA 088/A Red Intertuf 262 KHA 304/A Black Intertuf 262 KHA 303/A Red Interguard 263 FAJ 034/A Light Grey Interswift 6800 HS BMA 688 Brown Interswift 6800 HS BMA 684 Red Interswift 6800 HS Black * Mixing and Cleaning Thinner @5% of total paint – GTA 220 Mixing and Cleaning Thinner @5% of total paint – GTA 007 All sacrificial anodes consumed more than 50% to be replaced i.a.w para 16 of CGO-21/2020:- (a) Aluminum Alloy Anode (NCML MK-III) - 14 Nos (b) Aluminium Alloy Anode (NCML MK-VI) - 08 Nos (c) Anode (Type-A) - 28 Nos The location of Anodes are as follows :- Ser Description Aluminum Alloy Anode (NCML MK-III) (a) Skeg (b) Fin (c) Bow Thruster Aluminium Alloy Anode (NCML MK-VI) (a) Rudder Anode (Type-A/ Type-B) (a) DD Emergency Fire Pump Suction (b) GB Driven SW Cooling Pump Suction (P) (c) Ext Fi-Fi Pump Suction (P) (d) GB Standby (motor driven) SW Pump Suction (P) (e) FW Generator Port (WHR) Suction (f) Bilge & Ballast Pump No. 1 Suction (S) (g) Main DG No. 1 SW Cooling Pump Suction (S) (h) Main DG No. 2 SW Cooling Pump Suction (S) (j) Fire Main & Sprinkling Pump No. 1 Suction (S) (k) Port ME SW Cooling Pump Sea Chest Suction (l) GB Driven SW Cooling Pump Suction (S) (m) Ext. Fi-Fi Pump Suction (S) (n) Bilge & Ballast Pump No. 2 Suction (P) (p) Fire Main & Sprinkling Pump No. 2 Suction (P) (q) GB Standby (Motor Driven) SW Pump Suction (S) (r) FW Generator Stbd (WHR) Suction (s) Main DG No. 3 SW Cooling Pump Suction (P) (t) Main DG No. 4 SW Cooling Pump Suction (P) (u) Stbd ME SW Cooling Pump Sea Chest Suction (v) AC Plant & Cooling Pump No. 1 Suction (w) AC Plant & Cooling Pump No. 2 Suction (x) FW Generator R/O Type No. 1 Suction (y) FW Generator R/O Type No. 2 Suction (z) Magazine Compartment Flooding Total: 28 Nos (Type-A: 24 nos and Type-B: 04 Nos) UNDERWATER PACKAGE CPP & SHAFTING (MAKE- WARTSILA, MODEL-SP/000976. PH1-OMM), QTY-02PAC FIRM: M/S WARTSILA INDIA, MUMBAI Remove eddy plates, eddy cone and rope guards to facilitate access, inspection and measurement of shaft bush and bearing clearances. All eddy plates and rope guards are to be cleaned, painted and fitted back on completion of inspection and measurement of clearances. All fasteners and lock wires to be renewed. Duly vetted report by CGRPT staff/ OEM / Class surveyor to be submitted. All in way jobs included. Bush and bearing clearance readings of aft Port and Stbd stern tubes, both intermediate brackets and both ‘A’ brackets are to be checked and recorded with the shafts in varied position. Render report giving comparative assessment of clearance readings w.r.t. initial readings. Report is to be duly vetted by CGRPT staff/ OEM / class surveyor. All in way jobs included. BOW THRUSTER (MAKE- M/S DTG, TYPE- TUNNEL THRUSTER, MODEL- DT0400), QTY-01OEM: M/S DUTCH TRUSTER GROUP BV, NETHERLAND Measure tip clearance of all blades. Render report giving comparative assessment of clearance readings w.r.t. initial readings. Report to be duly vetted by CGRPT staff/ OEM/ class surveyor. Yard to submit class recommendations. SEA CHEST VALVES Overhaul and pressure test following sea chest valves (Test Pressure: 10 bar). Painting to be carried out with primer and black colour. Hose test of all valves to be undertaken in association with class surveyor post refitment. Material & Paint – Yard Supply Ser Description Size Type Qty (a) Main Engine Sea chest 250mm SDNR 02 Nos (b) Main DG Sea chest 65mm SDNR 04 Nos (c) Gear boxes Sea chest 80mm SDNR 04 Nos (d) Fi-Fi Pump Sea chest 300mm Butterfly 02 Nos (e) AC condenser pump sea chest 200mm SDNR 02 Nos (f) Fire & Sprinkling pump Sea chest 125mm SDNR 02 Nos (g) Bilge & Ballast pump Sea chest 125mm SDNR 02 Nos (h) Emergency Fire pump Sea chest 80mm SDNR 01 Nos (j) WHR Plant sea chest 80mm SDNR 02 Nos (k) RO plant sea chest 40mm SDNR 02 Nos TOTAL 23 Nos MAGAZINE FLOODING VALVE Magazine flooding valve (Size- 100 mm, Type – SDNR, Qty -01 No, Material- Gun metal) to be removed and overhauled. Worn out parts to be replaced. Post overhauling, flooding valve to be pressure tested up to 6 Bar and painted with primer and black colour. Operation of valve through rod gear mechanism to be proved after fitment and hose test to be undertaken in association with class surveyor. Material & Paint – Yard Supply. OVERBOARD VALVES Overhaul and pressure test following sea chest valves (Test Pressure: 10 bar). Painting to be carried out with primer and black colour. Hose test of all valves to be undertaken in association with class surveyor post re-fitment. Material & Paint – Yard Supply (33nos) Ser Description Size Type Qty (a) Main Engine 200mm SDNR 02 Nos (b) Main DG 65mm SDNR 04 Nos (c) Gear boxes 65mm SDNR 04 Nos (d) Fi-Fi Pump 65mm Butterfly 02 Nos (e) AC condenser pump 125mm SDNR 02 Nos (f) Fire & Sprinkling pump 32mm SDNR 02 Nos (g) Bilge pump 80mm SDNR 02 Nos (h) Ballast pump 100mm SDNR 02 Nos (j) Emergency Fire pump 80mm SDNR 01 Nos (k) WHR Plant 80mm SDNR 02 Nos (l) RO plant 40mm SDNR 02 Nos (m) Ref plant 50mm SDNR 01 No (n) Fixed Eductor system 100mm SDNR 05 Nos (p) Fin Stabilizer 32mm SDNR 02 Nos Total Quantity : 1

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 06-06-2024 14-06-2024

Key Value

Document Fees
Refer document
EMD
INR 600000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail