| 1 | Detail of Work |
| 2 | Repairing of Tripping Mechanisum system including replacement of tripping & Operating Coil And Relay. |
| 3 | Providing and fixing of charging gerari & non retun bearing |
| 4 | Replacement of Jack and Lever Brass Bush |
| 5 | Water level Earthing with connected 6 swg copper with funnel |
| 6 | Replacement of Operating /Charging Motor |
| 7 | Servicing of All machenical Parts. |
| 8 | Providing and fixing of Damage nut bolt proper. |
| 9 | Rebinding of 2.5x2 core 4 core 6 core sq mm PVC copper wire, lugs and damage burnt wiring and servising wiring re wiring of control pannel |
| 10 | Safely Carriage of 25 KVA T/F from ESC, SRE to Site of work including loading & unloading at both ends. |
| 11 | Safely carriage of Line Material (Except PCC Pole/Weasel conductor)ESC SRE to site of works through privet vehicle including loading and unloading at both ends. (Distance 0 to 25 K.M.) |
| 12 | Safe installation of 25 KVA T/F on the D/P with complete fittings including making connections and commissioning. |
| 13 | Safely carriage of AB Cable size 3x95 from ESC SRE to site of work including loading and unloading at both ends. |
| 14 | Grouting of stay rods by digging of pits in block 600x600x300 MM & cementconcreting in ratio 1:4:8 with cement, sand and brick ballast and nozzling of stay wire 7/10 SWG and fitting the same on the pole including fixing of stay insulator in stay wire. |
| 15 | Laying, lifting, stringing, sagging jump ring & binding of AB cable size 3x95 sq.mm |
| 16 | Earthing Rod |
| 17 | Providing of Suspenstion Clamp |
| 18 | Providing of PRC Clamp |
| 19 | Providing of I hook |
| 20 | Providing of Dead & Clamp |
| 21 | Safely carriage of Fuse set from ESC SRE to site of work including loading and unloading at both ends. |
| 22 | Safely Installation of Fuse set and making connection properly |
| 23 | Removal of Control cable scrap from site of work to ESC SRE to including loading and unloading at both ends. |
| 24 | Safely removal of 33 KV VCB, Control Pannel from site of work to ESC Sre including loading and unloading at both ends. |
| 25 | Safely Carriage of 33 KV Control pannel for Single T/F from ESC SRE to Site of work including loading and unloading at both ends. |
| 26 | Safely Installation of 33 KV Control Pannelfor Single T/F and making connection properly. |
| 27 | Laying of Control Cable size 4x2.5 sq.mm |
| 28 | Laying of Control Cable size 2x2.5 sq.mm |
| 29 | Safely carriage of 33 KV VCB from ESC SRE to site of work including loading and loading at both ends. |
| 30 | Safely Installation of 33 KV VCB and making connection properly to C&R pannel through Control cable. |
| 31 | Laying, lifting, Stringing, sagging jumpring & binding of Dog Conductor for 33 KV Line as per RESPO specification including complete. |
| 32 | water level Earthing of VCB (1 No body & 1 No. neutral earthing) by boring of till water level minimum 60 Ft deep & fixing of G.I pipe 11/2\" Dia (Jindal Class B) and connecting with G.I. Strip of size 50x6 mm and copper strip at bottom of G.I pipe to the T/F providing of required charcoal & salt in the pipe |
| 33 | Safely removal of 33 KV old & damge CT from site of work to ESC Sre including loading and unloading at both ends. |
| 34 | Safely carriage of 33 KV CT from ESC SRE to site of work including loading and unloading at both ends. |
| 35 | Safely installation of 33 KV CT properly and making connection to C&R Pannel. |
| 36 | Providing of Lug |