}

Tender For Annual Electrical Maintenance Works At Captive Power Plant, Hwp, Manuguru During The Period 2024-25., Bhadradri Kothagudem-Telangana

Heavey Water Board-HWB has published Tender For Annual Electrical Maintenance Works At Captive Power Plant, Hwp, Manuguru During The Period 2024-25.. Submission Date for this Tender is 15-06-2024. Electrical Maintenance Tenders in Bhadradri Kothagudem Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

43450064
Corrigendum : Tender For Annual Electrical Maintenance Works At Captive Power Plant, Hwp, Manuguru During The Period 2024-25.
Open Tender
Indian
Telangana
Bhadradri Kothagudem
15-06-2024

Tender Details

Tender For Annual Electrical Maintenance Works At Captive Power Plant, Hwp, Manuguru During The Period 2024-25.; 1 Preventive Maintenance of circuit breakers of following voltage level and type: 2 220kV SF6 3 33 kV VCB 4 11 kV VCB 5 415V ACB 6 Preventive maintenance of 220kV Isolators 7 Preventive maintenance of 220kV switchyard bay marshalling box 8 Preventive maintenance of switchgear panel of following voltage level: 9 33kV 10 11kV 11 415V 12 Preventive Maintenance of transformers of following rating: 13 220/33kV, 40MVA 14 33/11kV, 40MVA 15 33/6.6kV, 16MVA 16 11/6.6kV, 8MVA 17 Below 8MVA 18 Oil topup in transformers of following rating: 19 8MVA and above 20 8MVA and below 21 Replacement/Drying of Silica Gel of transformer 22 Arresting of oil leak from transformer of following rating: 23 220/33kV, 40MVA 24 33/11kV, 40MVA 25 33/6.6kV, 16MVA 26 11/6.6kV, 8MVA 27 Below 8MVA 28 Transformer oil sample collection and testing(for BDV) as per relevant Indian standard. BDV kit will be provided by department 29 Disconnection of power cables from transformer(rated 40 MVA) terminals(after opening terminal box cover) for the purpose of measuring of IR value and subsequent connection and closing of terminal boxes. Measurement of IR value covered in other item. 30 Disconnection of ground connection from transformer(rated 40 MVA) neutral terminals for the purpose of measuring of IR value and subsequent connection. Removal and reconnection of any other ground connections in the circuit are also covered in this item. Measurement of IR value covered in other item. 31 Disconnection of power cables from transformer(rated between 8MVA and 40MVA) terminals(after opening terminal box cover)/bus bar terminals for the purpose of measuring of IR value and subsequent connection and closing of terminal boxes. Measurement of IR value covered in other item 32 Disconnection of ground connections from transformer(rated between 8MVA and 40 MVA) neutral terminals for the purpose of measuring of IR value and subsequent connection. Removal and reconnection of any other ground connections in the circuit are also covered in this item. Measurement of IR value covered in other item. 33 Disconnection of power cables from transformer(rated 8 MVA and less) terminals(after opening terminal box cover) for the purpose of measuring of IR value and subsequent connection and closing of terminal boxes. Measurement of IR value covered in other item. 34 Disconnection of ground connections from transformer(rated 8MVA and less) neutral terminals for the purpose of measuring of IR value and subsequent connection. Removal and reconnection of any other ground connections in the circuit are also covered in this item. Measurement of IR value covered in other item. 35 Removal of existing Oil Temperature indicator/Winding temperature indicator of transformer and replacing it with spare by proper mounting. Connection and disconnection of indicator terminals from marshalling box is in the scope of contractor 36 Measurement of Insulation resistance value/ Polarisation index value of transformer winding/power cable/circuit breaker/bus bar/motor etc. 37 Measurement of dielectric disspitation factor/Capacitance value of insulations of 220kV CT/PT/transformer/OIP bushing 38 Troubleshooting of control/protective/power circuits of 220kV circuit breaker/ 220kV isolator/ 220/33kV 40MVA transformer/220kV CT/220kV PT etc. 39 Troubleshooting of control/protective/power circuits of 33kV switchgear/33kV breakers/33kV-11kV-6.6kV voltage level transformers etc. 40 Troubleshooting of control/protective/power circuits of 6.6kV-415V voltage level transformer/6.6kV motor etc. 41 Troubleshooting of control/protective/power circuits of 415V circuit breaker/ 415V transformer/ 415V switchgear/ 415V motor etc. 42 Troubleshooting of control/protective circuits of 220V DC/48V/24V DC system 43 Installing semaphore switch/ Annunciator/ Ammeter/ Voltmeter/ Energy meter/ Synchronising selector switch/Protective relay/Selector switch/Indication lamp/contactor/overload/MCB/fuse holder/TPN switch etc by cutting the panel door to suitable size, proper mounting as per instructions of EIC and proper terminations of wires with lugs 44 Replacement of fuse holder/MCB/semaphore switch/ Annunciator/ Ammeter/ Voltmeter/ Energy meter/ Synchronising selector switch/Protective relay/Selector switch/Indication lamp/contactor/overload/TPN switch etc with spare and proper terminations of wires same as before 45 Improvement of IR value to satisfactory value(as directed by EIC) of 33kV outgoing cubicle by hot air blowing/ heating with luminaires etc. 46 Improvement of IR value of 415V motor to satisfactory value(as directed by EIC) by hot air blowing in terminal box/ heating with luminaires etc. 47 Preventive Maintenance of HT motor 48 Condition monitoring of HT motor 49 Improvement of IR value of 6.6kV motor to satisfactory value(as directed by EIC) by hot air blowing in terminal box/ heating with lumiaires etc. 50 Preventive Maintenance of LT motor and its module 51 Condition monitoring of LT motor 52 Temporary power supply connection / disconnection at different location (material collection from plant store and safe return to plant in contractor scope) 53 Condition monitoring of LT module 54 Shifting of CTs/PTs/LT motors/Control transformers/testing kits etc. from DPS store/E-U store to site/site to store when required 55 Removal of connection of 220KV overhead conductors from OIP bushings for testing of bushings and re-termination after completion of testing 56 Pre-monsoon checks of transformers as per checklist 57 Disconnection of cables from motors/overhead lines/TBs etc. for troubleshooting etc. and reconnecting after completion of troubleshooting 58 Supply of paint and painting of the surface of cable tray/panel/motor/exhaust fan etc. Minimum quantity of synthetic enamel smoke grey paint to be supplied:15 litres 59 Preparation of various documents in system as per technical specifications 60 Supply of 1.5V AA cells as and when required, Make: Duracell 61 Supply of 9V cells as and when required, Make: Duracell 62 Puncture Repair of cargo loader tyre as and when required as per technical specifications 63 Installation of quarter turn locks(Zinc die casting body, steel cam, chrome plating) including supply of lock with key for electrical panel of following dimensions:Panel cut-out:22mm dia.(approx.) as per sample. Grip length upto 100mm as per sample. 64 De-dusting of modules/panels, Segregation of spares/scrap in section stores etc. 65 Fabrication, painting(one coat each of red oxide and synthetic enamel grey) of support angles/transformer control cabinet canopy/cable tray canopy/neutral grounding resistor enclosure etc. including supply, cutting, welding of MS sheet/plate/angle of required thickness, required GI nuts, bolts, plain and spring washers and fixing at site as per technical specifications. Supply of red oxide and synthetic enamel grey paint is also in the scope of contractor

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 01-Jun-2024 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 08-06-2024
2 08-Jun-2024 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 15-06-2024

Key Value

Document Fees
Refer document
EMD
INR 40480.0 /-
Tender Value
INR 20.24 Lakhs /-

BOQ Items

Name of Work: Annual Electrical Maintenance Works at Captive Power Plant, HWP, Manuguru during the period 2024-25.
Sl. No. Item Description
1Preventive Maintenance of circuit breakers of following voltage level and type:
2220kV SF6
333 kV VCB
411 kV VCB
5415V ACB
6Preventive maintenance of 220kV Isolators
7Preventive maintenance of 220kV switchyard bay marshalling box
8Preventive maintenance of switchgear panel of following voltage level:
933kV
1011kV
11415V
12Preventive Maintenance of transformers of following rating:
13220/33kV, 40MVA
1433/11kV, 40MVA
1533/6.6kV, 16MVA
1611/6.6kV, 8MVA
17Below 8MVA
18Oil topup in transformers of following rating:
198MVA and above
208MVA and below
21Replacement/Drying of Silica Gel of transformer
22Arresting of oil leak from transformer of following rating:
23220/33kV, 40MVA
2433/11kV, 40MVA
2533/6.6kV, 16MVA
2611/6.6kV, 8MVA
27Below 8MVA
28Transformer oil sample collection and testing(for BDV) as per relevant Indian standard. BDV kit will be provided by department
29Disconnection of power cables from transformer(rated 40 MVA) terminals(after opening terminal box cover) for the purpose of measuring of IR value and subsequent connection and closing of terminal boxes. Measurement of IR value covered in other item.
30Disconnection of ground connection from transformer(rated 40 MVA) neutral terminals for the purpose of measuring of IR value and subsequent connection. Removal and reconnection of any other ground connections in the circuit are also covered in this item. Measurement of IR value covered in other item.
31Disconnection of power cables from transformer(rated between 8MVA and 40MVA) terminals(after opening terminal box cover)/bus bar terminals for the purpose of measuring of IR value and subsequent connection and closing of terminal boxes. Measurement of IR value covered in other item
32Disconnection of ground connections from transformer(rated between 8MVA and 40 MVA) neutral terminals for the purpose of measuring of IR value and subsequent connection. Removal and reconnection of any other ground connections in the circuit are also covered in this item. Measurement of IR value covered in other item.
33Disconnection of power cables from transformer(rated 8 MVA and less) terminals(after opening terminal box cover) for the purpose of measuring of IR value and subsequent connection and closing of terminal boxes. Measurement of IR value covered in other item.
34Disconnection of ground connections from transformer(rated 8MVA and less) neutral terminals for the purpose of measuring of IR value and subsequent connection. Removal and reconnection of any other ground connections in the circuit are also covered in this item. Measurement of IR value covered in other item.
35Removal of existing Oil Temperature indicator/Winding temperature indicator of transformer and replacing it with spare by proper mounting. Connection and disconnection of indicator terminals from marshalling box is in the scope of contractor
36Measurement of Insulation resistance value/ Polarisation index value of transformer winding/power cable/circuit breaker/bus bar/motor etc.
37Measurement of dielectric disspitation factor/Capacitance value of insulations of 220kV CT/PT/transformer/OIP bushing
38Troubleshooting of control/protective/power circuits of 220kV circuit breaker/ 220kV isolator/ 220/33kV 40MVA transformer/220kV CT/220kV PT etc.
39Troubleshooting of control/protective/power circuits of 33kV switchgear/33kV breakers/33kV-11kV-6.6kV voltage level transformers etc.
40Troubleshooting of control/protective/power circuits of 6.6kV-415V voltage level transformer/6.6kV motor etc.
41Troubleshooting of control/protective/power circuits of 415V circuit breaker/ 415V transformer/ 415V switchgear/ 415V motor etc.
42Troubleshooting of control/protective circuits of 220V DC/48V/24V DC system
43Installing semaphore switch/ Annunciator/ Ammeter/ Voltmeter/ Energy meter/ Synchronising selector switch/Protective relay/Selector switch/Indication lamp/contactor/overload/MCB/fuse holder/TPN switch etc by cutting the panel door to suitable size, proper mounting as per instructions of EIC and proper terminations of wires with lugs
44Replacement of fuse holder/MCB/semaphore switch/ Annunciator/ Ammeter/ Voltmeter/ Energy meter/ Synchronising selector switch/Protective relay/Selector switch/Indication lamp/contactor/overload/TPN switch etc with spare and proper terminations of wires same as before
45Improvement of IR value to satisfactory value(as directed by EIC) of 33kV outgoing cubicle by hot air blowing/ heating with luminaires etc.
46Improvement of IR value of 415V motor to satisfactory value(as directed by EIC) by hot air blowing in terminal box/ heating with luminaires etc.
47Preventive Maintenance of HT motor
48Condition monitoring of HT motor
49Improvement of IR value of 6.6kV motor to satisfactory value(as directed by EIC) by hot air blowing in terminal box/ heating with lumiaires etc.
50Preventive Maintenance of LT motor and its module
51Condition monitoring of LT motor
52Temporary power supply connection / disconnection at different location (material collection from plant store and safe return to plant in contractor scope)
53Condition monitoring of LT module
54Shifting of CTs/PTs/LT motors/Control transformers/testing kits etc. from DPS store/E-U store to site/site to store when required
55Removal of connection of 220KV overhead conductors from OIP bushings for testing of bushings and re-termination after completion of testing
56Pre-monsoon checks of transformers as per checklist
57Disconnection of cables from motors/overhead lines/TBs etc. for troubleshooting etc. and reconnecting after completion of troubleshooting
58Supply of paint and painting of the surface of cable tray/panel/motor/exhaust fan etc. Minimum quantity of synthetic enamel smoke grey paint to be supplied:15 litres
59Preparation of various documents in system as per technical specifications
60Supply of 1.5V AA cells as and when required, Make: Duracell
61Supply of 9V cells as and when required, Make: Duracell
62Puncture Repair of cargo loader tyre as and when required as per technical specifications
63Installation of quarter turn locks(Zinc die casting body, steel cam, chrome plating) including supply of lock with key for electrical panel of following dimensions:Panel cut-out:22mm dia.(approx.) as per sample. Grip length upto 100mm as per sample.
64De-dusting of modules/panels, Segregation of spares/scrap in section stores etc.
65Fabrication, painting(one coat each of red oxide and synthetic enamel grey) of support angles/transformer control cabinet canopy/cable tray canopy/neutral grounding resistor enclosure etc. including supply, cutting, welding of MS sheet/plate/angle of required thickness, required GI nuts, bolts, plain and spring washers and fixing at site as per technical specifications. Supply of red oxide and synthetic enamel grey paint is also in the scope of contractor
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail