Agriculture Boards / Undertakings / PSU Closing in 0 days TDR #43438853

Tender For Mill & Boiler House,Boiling House And Etp Fabrication And Erection Work, Welding Work On The Sides Of Trpf Rollers As Per Requirement. The Work Of Repairing The Worn Teeth Of Irc, Src And Can Carrier Sprockets By Welding As Per Requirement. R

Issued by Boards / Undertakings / PSU · sarsawa, Uttar Pradesh
Tender Value
40 Lakhs
Estimated cost
Bid Submission
10 Jun 2024
0 days left
EMD
1 Lakhs
Bank guarantee accepted
Document Fee
250
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
sarsawa → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available

Project Description

tender for MILL & BOILER HOUSE,BOILING HOUSE AND ETP FABRICATION AND ERECTION WORK, Welding work on the sides of TRPF rollers as per requirement. The work of repairing the worn teeth of IRC, SRC and can carrier sprockets by welding as per requirement. Removing the weak and damaged side plate of IRC Gali and replacing it with a new plate of 08/10 mm given and giving a satisfactory leak proof trial. Removing the weak and damaged bottom plate of IRC Gali and replacing it with a new plate of OB/10 mm given and giving a satisfactory leak proof trial. The work of fixing the broken teeth of the pressure shoot of the mill and repairing the worn teeth and making them high facing. The can carrier was tilted from the upper side, its channels were heated, straightened and aligned to complete the work. Repair by opening the old pressure chute on the mill and completely replacing the corroded part. and assembling the damaged part of the SS plate by welding it properly. And the work of fitting it on the mill and giving it a satisfactory trial. On the work of straightening old plates of different sizes The work of removing the stressed boot of IRC and SRC and making it from new plate of 08 to 10 mm, installing it at its place and giving trial. Replacement of worn out runners of Cane Carrier, SRC and IRC with 8 x 65 mm or 10 x 65 mm pellet iron and repair/replacement of weak guide lines. The work of making a platform by straightening the old plates of different sizes. The work of cutting out old railing and making new railing by straightening the old protruding pieces. The work of cutting and removing the corroded juice tanks of the Mill House and installing them at the same place along with fittings after fabrication from the given new MS plate of 08 mm. The work of making cover of mill bearing by bending the weak 6 mm MS plate protruding from the cane carrier. Cutting and removing all the corroded and damaged plates and angles on the can carrier and installing the given 6/8 mm MS plate by bending it and giving a satisfactory trial by installing new angles. Replacement of melted side plate and top plate of Chopper, Leveler, Fibrizer with 6/8/10/12 mm plate. Making new racks of SRC as per drawing. Making new racks of IRC as per drawing. Welding work on the sides of TRPF rollers as per requirement. Repairing TRPF rollers by welding/high phasing. Cut crown pinion of mill house/crown pinion of TRPF Welding as per instructions/drawings. Replacement of 40/50 mm size square bar/rail on can unloader. Remodeling and trial fitting of SRC and can carrier neck guides of mill house. Replacing the corroded side plate of DSM screen with 8/10 mm plate and repairing the mesh and closing its side and top gaps. Repairing and high-facing broken and worn claws of can unloaders. Cutting section grooving as per guidelines on mill roller. Dhonali suits of Mill No. 01, 02, 03, whose plates have completely melted, should be removed, made new as per the drawing from the given plate, made adjustable and given trial in a satisfactory manner. To remove the worn out cover of TRPF installed on the mill so as to make and fit a new cover using the plate given as per the drawing/ sample. List of works to be done on Boiler House (Lot-2) Remove the worn runner of main bagasse carrier, bagasse elevator and return bagasse carrier and replace it with 08165/10150 mm flat iron and clean the welding part with a grinder and give it a satisfactory trial. Cutting and removing the worn bottom plate of main bagasse carrier, bagasse elevator and return bagasse carrier and replacing it with the given 6/8/10 mm plate and giving a satisfactory trial by cleaning the welding part with a grinder. Cutting and removing the worn side plate of main bagasse carrier, bagasse elevator and return bagasse carrier and replacing it with the given 6/8/10 mm plate and giving a satisfactory trial by cleaning the welding part with a grinder. To repair the worn out sprockets of main bagasse carrier, bagasse elevator and return bagasse carrier by Bhunsar welding etc. of the respective drawings and give them a satisfactory trial. Cutting out the damaged guides of main bagasse carrier, bagasse elevator and return bagasse carrier and installing new ones in place and giving satisfactory trials. Cutting out the damaged boot of Man Baggage Carrier, Baggage Elevator and Return Baggage Carrier, making new one at its place and giving satisfactory trial. Cutting out damaged and weak runner boxes of main bagasse carrier, bagasse elevator and return bagasse carrier and installing a new runner box at the same place using the channel and angle given by MS and doing complete alignment and strengthening and satisfactory Giving trial properly. Issues with main bagasse carrier, bagasse elevator and return bagasse carrier and straightening and strengthening of damaged runner box and complete alignment and satisfactory trials. Cutting out damaged and weak shields of Man Baggas Carrier and installing new ones along with gear shaft system from the given plate and giving satisfactory trials. Cutting and removing the weak and sore part of the bagasse feeding chute installed in all three boilers and installing a new one from the given plate and repairing the related shaft and gear. The casings of ID fan and FD fan of the boiler have become extremely weak and damaged. Cutting out the weak part and installing a new one from 6/8 mm plate as per the instructions, strengthening it and giving a leak proof trial in a satisfactory manner. To give satisfactory trial by completely strengthening the ducting of ID and FD fans. Fit the spare feed pump available on the boiler by making a bed on the foundation along with the motor, completely aligning it and giving a satisfactory trial by making related connections etc. Removing the damaged dampers between the ID fan and chimney of the boiler and fitting the dampers as per instructions and giving a satisfactory trial. Removing the damaged dampers fitted in the FD draft of the boiler and fitting the dampers as per instructions and giving satisfactory trials. Removing the weak, side, bottom and upper plates around the air heater of Boiler No. 3 by cutting them and making new ones from the given 6/8 mm plate and installing them in place and giving a satisfactory trial by doing leak proof welding. To give satisfactory trial by completely strengthening the plates of the air heater. Removing the weak and damaged plate around the economizer and installing a new plate on its back. To give satisfactory trial by completely strengthening the plates of economizer. Cutting out the weak part of the ash chamber of boiler no. 03 and installing a new one from the given plate and giving a satisfactory trial. In the boiler house, after making a fitting for the pump and motor, fitting the pump and motor and giving it a trial. (up-to-20 HP) Make a bed for the pump and motor in the boiler house, fit the pump and motor and give it a trial. (21 HP to 75 HP) Dismantling and installing new columns, beam channels, angles etc. in the boiler house. Installation of 22 size manhole with blind in boiler house. Cutting and removing the weak and damaged plate of the casing of bagasse slow fan and installing a new plate in place. Give a satisfactory trial by welding the leak To give satisfactory trial by fitting the casted flap and beam in the wall of the boiler as per the instructions to stop the turn of the first row of pluswetting grade wise system of boiler no. 03. Removing the old shoot blower installed in the superheater of Boiler No. 02 and fitting the new motorized shoot blower provided and giving it a satisfactory trial. List of works to be done on Clarification, Evaporator and Dryer House (Lot-3) Removal of old and corroded quad condenser/juice heater condenser/syrup bottle and replacement of 8/10 mm M.S. Make it from the plate and do all the connections etc. and give it a trial. Making the hopper trough from the given plate, strengthening it by angle and giving satisfactory trials. Removing the intermediate coolers of film type sulfur furnace and making new ones from the given pipe/plate and giving trial. Installing and trialling the supplied pipes or making new ones to the sublimation pies of Satvik Time Sulfur Furnaces. Removal of melted plate of Umbrella in Quad Body/Vapor Cell/Semi-Canner and repairing with the provided plate and giving trial. Removal of quad body/vapour cell/umbrella of semi-circulator and 6/8 mm. of M.S. Make a new plate and install it and give it a trial. Removing the saveall from the neck of the quad body/semicasener and 8/10 mm. of M.S. Make a new plate and install it and give it a trial. Removing the gully plate of the saveall of a quad flood/semi-quadrant and repairing it by installing the given plate and giving it trial. Removing the filter bottle and 8/10 mm M.S. of the vacuum filter. Make a new filtration bottle from the plate and install it and give it a trial by making all the connections etc. Repair of filter bottles of vacuum filter by removing the gully plate and replacing it with the given plate. To do and give trial. Removing the gully plate of the vacuum filter tray and repairing it by installing the given plate. Cutting and removing the shells from the lime slaker installed at the lime station and replacing them with new ones from the plates given and giving them trial. Making the melter from a new 8/10 mm plate of Satvik Sulfur Furnace and giving a satisfactory trial by installing steam coil in it. Cutting out the melted coil inside the melters of Satvik Sulfur Furnace and fitting a new one and giving a satisfactory trial by doing hydraulic testing. Removing the gully plate of the condensers of the vacuum filter and installing a new plate, repairing it and giving it a trial. Cutting and removing the gully plate of square melter of film type sulfur furnace and making it with the given 10 mm new plate. Making a new coil by cutting the damaged/weak steam coil installed in the film tin sulfur melter and giving a satisfactory trial by doing hydraulic testing. Removing the condensers of the vacuum filter and installing new ones from 8/10 mm plate. Removing the gully plate of SO2 chamber inside the coolers of Satvik Sulfur Furnace and repairing it with the given plate, giving trial by installing cooling pipe etc. Remodeling and installing SO2 chamber inside the coolers of Satvik Sulfur Furnace and giving it trial. Removal of old corroded line at Sulfur Furnace station and work of tightening joints and bolts by installing new seamless/MS lime along with flanges. After cutting the stool of juice sulphiter shell and replacing it with 8/10 mm plate given to the partially weak part and reassembling the school and giving a satisfactory trial. Replacement of weak shell top and bottom of sulphated juice receiving tank located below juice sulphiter and making connections of related pipe lines. The work of strengthening the overhead tank located in Vyalling House through the given 100 mm channel/angle. Welding of 3 to 4 inch wide ring for strengthening on the vapor pipeline of quad and pan. Removal of weakened roof of quad body by cutting and given 12 mm. Make it from a plate and give it a trial. Cutting out the weak part of semi-condenser/vapor cell/quad flood cell and replacing it with the given 10/12 mm. Installing the plate by bending it and giving satisfactory leak proof trial. 1000 mm distance from body no. 4 to condenser of new/old quad set. Removal of weak vapor pipe of Dhaya and given 10 mm. Fold the key plate and put it in place and give satisfactory leak proof trial. Removing the weak part of the exhaust pipe line going from the superheater to the semi-condenser / vapor shell, replacing it with a new 800 mm pipe line made from the given 8/10 mm plate and giving a satisfactory trial. Cutting out the melted partition plates of the top and bottom headers of the juice heater and replacing them with the given 8/10 mm. Installing the key plate and making arrangements to fit the rubber strip in it and giving satisfactory trial. Installing spots and strengthening the vapor shell/semicondenser/umbrella fitted in the quad body and giving satisfactory trials. Removing the gully tray of the vacuum filter and 8/10 mm. Make a new plate and install it and give a satisfactory trial. Removing the corroded plate form at the top and bottom of the juice heater and making a new one and strengthening the related structure. Removing the corroded plate form at the bottom and top of the quad and making a new one from the given plate and getting the structure related to it stranded. Removing weak intermediate/first vapor/second vapor pipes of quad bodies and B/10 mm. From plate 670 mm. Make a new one and give it a satisfactory trial. Removal of faulty jet heater installed on continuous machines and installation of new one and giving satisfactory trial. Removal and replacement of gutters around crystallizers, pan stations and machines. Hopper 1.5 m x 1.5 m tuff 5 mm. Make a new key plate by riveting it with 10 mm plate and give it a trial by installing connecting rod. Replacement of cover of Conti machines by making new one from 6/8 mm plate. Making the hopper trough from the given plate, strengthening it at an angle and giving satisfactory trials. After checking the spray pipe installed on the molasses tank, replacing the neck pipe and after checking and cleaning the holes of the pipe, put it in place and give it a trial. Remove the plate of mud mixture formed on the vacuum filter and repair it with the new plate provided. Removing the screw conveyor inside the mixer and installing a new one using the new plate and pipe provided and giving it a trial. Removing the gully plate of the filtration tank below the vacuum filter and repairing it by installing the given plate and giving it a trial. Cutting out the trays of the compartments of the clarifier and replacing them with the given 6 mm. Make a new plate and install it and give a satisfactory trial. The trays of the third compartments of the clarifier are cut off to remove rotten buds and the given 6 mm. Make a new plate and install it and give a satisfactory trial. Cutting and removing the weak plate of juice and liquor box of clarifier and installing it with a new plate and making all the connections. Patching the weak shell of the bunning chamber of the film type sulfur furnace with the given plate up to a length of approximately 5 feet from the bottom and giving a satisfactory trial. Fixing the weak and corroded platforms of both the vacuum filters with new replacement plates. Cutting out the weak lump of syrup sulphite and installing a new one from the given MS plate and giving a satisfactory trial. Removing the SO2 chamber inside the last cooler of the film type sulfur furnace and making a new one from the given 10 mm MS plate and making all the connections. Removing the melted clear juice bottle near the clear juice pumps and replacing it with the new plate provided and making all the connections. Removing all the rotten mud scrapers inside the cattle clarifier and fitting the given plate and belt as per the size and giving satisfactory trial. Strengthening the weak part of the central shaft by making a ring from the plate given to the central shaft inside the clarifier. Removing the weak mud-boot plate of each compartment inside the clarifier by coating it and installing the new plate provided. Removing the brass tubes from the second body of Evaporator Set-A and storing them in the store. (Heating surface 540 m square) Removing the calendry of the second body of Evaporator Set A and keeping it in the scrap yard and fitting the new calendria of 540 meter square heating surface and installing all the pipe lines, valves, accessories in place and giving satisfactory trial. Molding and expanding 42X45X2000 mm SS tubes in the second body of Evaporator Set A (540 meter square heating surface) and giving satisfactory hydraulic testing at 5 kg/cm square. Replacement of side plates of A/B Heavys run off tank rectangle with new plates of 06 mm and bottom plate. To give a satisfactory trial by changing the new plate of MM and making connections etc. To give satisfactory trial by replacing the weak side plate/bottom of magma mixture under the Conti machines with a new plate of OB MM. Cutting out the corroded rectangular tank of the maceration tank and fitting it using the given 8/10 mm clean plate and giving a satisfactory trial. The weak side plate/bottom of the pug mill located above the continuous machines and batch type machines has to be replaced with the new plate provided by MM to give a satisfactory trial. To give satisfactory trials by replacing the shoots of continuous machines with the given 5 mm plate. Removal of old conical and square tanks of maceration tank by cutting them. Removing the bottom of the raw juice rectangular tank and making it from the given 8/10 mm new plate and giving a satisfactory trial. Fixing Roddy Melters broken arm and giving a satisfactory trial. Dismantling and fabricating 900 mm bands, erecting them and giving satisfactory trials. Dismantling and fabricating 1100 mm bands, erecting them and giving satisfactory trials. Cutting out the agitator fitted on the vacuum filter and installing a new agitator at the given angle and channel etc. and giving a satisfactory trial. Replacement of the shell and nipple of the secondary burner of Satvik Sulfur Furnace. Cutting and removing the shell plate of the weak foaming chamber of the clarifier and preparing new shell from the given plate 6/8 mm, installing it and giving trial. (a) Dismantling old columns, beam channels etc. (b) Making and installing new columns, beam channels etc. Dismantling of old round, square tanks/vessels in clarification and centrifugal house. Making round, square tanks/vessels from 8/10 mm plate in clarification and centrifugal house. Removing the old collapsed platform and installing a new platform in its place. Installation of blind with manhole of 16 inch/18 inch size. Making a kit for the pump and fitting the pump and motor and giving it a trial up to 20 H.P. Making a bed for the pump, fitting the pump and motor and giving it a trial from 21 HP to 75 HP. Make beds of 02 high flow pumps of 4/6 inch on the molasses tank and give satisfactory trials by connecting the section and delivery line of molasses. Dismantling of old round, square tanks/vessels and the given plate 8/10 mm. Prepare from and give a satisfactory trial. The entire condenser pipe line (4 diameter) going from the boiling house to the boiler. etc.) by cutting them near the old vapor shell and keeping them at a safe place and making headers by installing valves on these 8 etc. 4 lines and taking the delivery line of header 01 etc. pipe to Vayalar feather water tank and strengthening the pipeline of Tax Providing satisfactory leak proof trial. Pan, Injection, Crystallizer and E.T.P. List of works to be done on (Lot-4) Remove the saveall from the pans and replace them with new 6/8 mm plates. Removing the pans gully and damaged weak vapor pipe located on the pan floor using 1100 mm length per meter and installing a new one from the given plate and giving it a trial. Removing the pans gully and damaged weak vapor pipe located in the pan floor using 900 mm length per meter and installing a new one from the given plate and giving it a trial. The old tail pipe of the condensers should be removed and replaced with stainless steel/M.S. Fit the tail pipe as per instructions (10/12 inch size). Making suction pipes of injection and cooling tower spray pumps and making and installing mesh as per instructions. Removal of melted shell plate of pans and replacing it with 10/12 mm M.S. Installing the plate and giving trial. Removing the steam coil of the molasses tank/molasses condenser and installing a new coil. Removing the umbrella fitted on the pan and replacing the given 6/8 mm. Make a new plate and give it a trial. Cutting out the neck/circular part of the pan and replacing it with the given 10/12 mm. of M.S. Installing the plate by bending it, welding it inside and outside and giving it a trial by filling it with water. Strengthening the pans shell and roof with new angles/channels provided by removing old angles/channels. Repairing the suction pipes of injection spray pumps with mesh. The neck of the dome at the upper part of the pan and the weak shell and bottom cone parts were cut off and replaced with 10/12 mm. By folding it from MS plate and installing it After doing satisfactory welding and giving trial. Cutting and removing the street spout of Pan Ambela and erecting it by installing a new channel and angle. Patching the old and worn out plates at various places with new plates given in place of them. Straightening old worn out plates of different sizes. Making stairs of different sizes and placing them at designated places. Dismantling old columns, beam channels etc. and installing new ones. Dismantling of old round and square tanks/vessels. Making round, square tanks/vessels from 8/10 mm plate. Removing the old collapsed platform and installing a new platform in its place. Pan floor manhole installation with 20 / 22 blind Replacement of weak cutta lines, condensed lines, syrup lines and molasses lines. Remove the old NR V (12 inches) of injection pump no. 2 and 4 and replace it with 10 mm as per instructions. Making a new NRV from the plate and installing it. C. Cutting out the broken arm of Mono Vertical Crystallizer and giving satisfactory trials by making the given arm. Leak proofing the leakage water coil of C Mono Vertical Crystallizer and giving satisfactory trials at hydraulic pressure of 50 PSI. 790 mm through injection header located in pan floor. Removing the neck and damaged part of length 15 m and fitting a new one from the given plate and giving a satisfactory trial by fitting the respective removed connections/nipples. To remove the old calendria of 45 ton Samata pan installed in the Mill Committee by ones own resources and keep it in the designated place/scrap yard and to install the new 45 ton calendria available in the can yard/store of the Mill Committee in place of the removed calendria and all the Installing pipelines, valves and making changes in staging as per requirement and giving satisfactory trials. Welding the leakage bottom saucer of Pan No. 02 from inside and outside and making satisfactory leakage proof welding by installing ribs etc. Removing the brass/SS tubes of the pan and storing them in the store. Expand the new brass/SS tubes of the pan given by the mill committee by placing them in calandria and give a satisfactory trial by conducting calandria hydraulic testing at a pressure of 04 kg per cm square. 01 number of old Molasses tank installed at PAN station, measuring length 3 meter, width 2 meter and height 2 meter, to be taxed by straightening the old plates taken out from the pan and quad pans and making them as per the above size with new plates and To give a satisfactory trial. Cut the weak bottom shoe of the pan and replace it with a new bottom shoe provided or fabricated from the given 16 mm plate and give a satisfactory trial by installing all the pipe line connections etc. and Katta discharge valve. The corroded side plates of the Molassis station located at Pan Station are being modified to new plates and the corroded bottom angle is being replaced with the new plates provided and giving a satisfactory trial. Repairing broken and damaged systems of crystallizers. After removing the worm wheel of the crystallizer, making a bed and installing the new planetary gear box provided and giving a satisfactory trial. Replace the worn out side plate and bottom half of the crystallizer by replacing it with a new one from the provided plate and give it a trial. Cutting out the damaged shafts and arms of crystallizers and preparing them with new pipes and angle channels and giving satisfactory trials. Strengthening the weak side covers and weak cells of the crystallizer by providing support through the channels and angles provided. Pan floor established syrup/melt/A light/A heavy/B heavy/C light/C. Removing the melted plate of heavy tanks by cutting it and installing the given plate by making it from 6/8 mm plate. Removing the melted and damaged part of the side plate (front and back) of the vacuum crystallizer located on the pan floor and installing a new one from the given plate 12/16 mm and giving a satisfactory trial by welding the respective disconnected connections and nipples. Removing the melted and damaged part of the shell of the vacuum crystallizer located on the pan floor and installing a new one from the given plate 10/12 mm and giving a satisfactory trial by welding the respective disconnected connections and nipples. Removing the old cutover valve on the pan and replacing it with a pneumatic cutover valve and giving a satisfactory trial. Removing the old discharge valve on the pan and replacing it with a pneumatic discharge valve and giving a satisfactory trial. Replacing the weak pipe line of ETP with the given pipe line and giving satisfactory trial. Providing satisfactory trials by laying the pipeline from ETPs lagoon to UGR. Replacement of weak connections of ETP pumps. Replacement of air line nipple and pipe line of read diffuser in aeration tank. Dismantling and fabricating 900 mm bands, erecting them and giving satisfactory trials. Dismantling and fabricating 1100 mm bands, erecting them and giving satisfactory trials.

BOQ

Name of Work: MILL & BOILER HOUSE,BOILING HOUSE AND ETP FABRICATION AND ERECTION WORK
Sl. No. Item Description
1fey gkWÅl ij djk;s tkus oky dk;Z dk fooj.k ¼ykV&1½
2Vh0vkj0ih0,Q0 ds jksyjksa dh lkbZM esa vko\";drkuqlkj osfYMax djus dk dk;ZA
3vkbZ0vkj0lh0] ,l0vkj0lh0 ,oa dsu dSfj;j ds LizksfdV~l ds f?kls gq;snkarks dks vko\";drkuqlkj osfYMax djds fjis;j djus dk dk;ZA
4vkbZ0vkj0lh0 dh xyh detksj ,oa {kfrxzLr lkbZM IysV dks dkVdj gVkuk ,oa nh x;h 08@10 ,e0,e0 dh ubZ IysV ls u;k cukdj yxkuk ,oa yhd izqQ larks\"ktud Vªk;y nsukA
5vkbZ0vkj0lh0 dh xyh detksj ,oa {kfrxzLr ckWVe IysV dks dkVdj gVkuk ,oa nh x;h 08@10 ,e0,e0 dh ubZ IysV ls u;k cukdj yxkuk ,oa yhd izqQ larks\"ktud Vªk;y nsukA
6fey ds izs\"kj \"kwV ds VwVs nkarks dks yxkuk rFkk f?kls gq;s nkarks dks fjis;j dj gkMZ Qsflax djus dk dk;ZA
7dsu dSfj;j Åij dh lkbZM ls >qd x;k Fkk] mlds pSuyksa dks xeZ djds lh/kk djuk o ,ykbZesUV dj dk;Z dks iw.kZ djkukA
8fey ij yxs iqjkus izs\"kj \"kwV dks [kksydj xys gq;s Hkkx dks iw.kZ :i ls cnyuk ejEer djuk rFkk ,l0,l0 IysV ds {kfrxzLr Hkkx dks lgh izdkj osfYMax djds vlsEcy djus rFkk fey ij fQV djds larks\"ktud :i ls Vªk;y nsus dk dk;ZA
9iqjkuh fudyh gqbZ fofHkUu lkbZtksa dh IysVks dks lh/kk djus dk dk;Z ij
10vkbZ0vkj0lh0 ,oa ,l0vkj0lh0 ds cys gq;s cwV dks gVkuk ,oa 08 ls 10 ,e0,e0 dh ubZ IysV ls cukdj ;FkkLFkku ij yxkus rFkk Vªk;y nsus dk dk;ZA
11dsu dSfj;j] ,l0vkj0lh0 ,oa vkbZ0vkj0lh0 ds xys@f?kls gq;s juj dks 8 x 65 ,e0,e0 ;k 10 x 65 ,e0,e0 dh ¶ysV vkW;ju ls cnyuk rFkk detksj xkbZM ykbZu dks fjis;j@cnyukA
12iqjkuh fudyh gqbZ fofHkUu lkbZt dh IysVks dks lh/kk dj IysVQkeZ cukus dk dk;ZA
13iqjkuh jsfyax dks dkVdj fudkyuk ,oa iqjkus fudys gq;s ikbZiksa dks lh/kk dj u;k jsfyax cukus dk dk;ZA
14fey gkWÅl ds xys gq;s twl VSadks dks dkVdj gVkuk ,oa nh xbZ 08 ,e0,e0 dh ubZ ,e0,l0 IysV ls QSczhds\"ku djds ;FkkLFkku ij fQfVaXl lfgr yxkus dk dk;ZA
15dsu dSfj;j dh fudyh gq;h detksj 06 ,e0,e0 dh ,e0,l0 IysV dks eksM+dj fey fc;fjaxks ds doj cukus dk dk;ZA
16dsu dSfj;j ij yxh leLr xyh ,oa {kfrxzLr IysVksa ,oa ,afxy dks dkVdj gVkuk rFkk nh xbZ 6@8 ,e0,e0 dh ,e0,l0 IysV dks eksMdj yxkuk ,oa u;s ,afxy yxkdj larks\"ktud Vªk;y nsukA
17pkWij] ysoyj] QkbczkbZtj dh xyh gbZ lkbZM IysV rFkk VkWi IysV dks 6@8@10@12 ,e0,e0 dh IysV ls cnyukA
18,l0vkj0lh0 ds u, jSd] MªkbZax ds vuqlkj cukukA
19vkbZ0vkj0lh0 ds u, jSd] MªkbZax ds vuqlkj cukukA
20Vh0vkj0ih0,Q0 ds jksyjksa dh lkbZM esa vko\";drkuqlkj osfYMax djus dk dk;ZA
21Vh0vkj0ih0,Q0 ds jksyjksa dks osfYMax@gkMZQsflax djds fjis;j djukA
22fey gkWÅl dsdVs gq, Økmu fifu;u@Vh0vkj0ih0,Q ds Økmu fifu;u dks funsZ\"kkuqlkj@ MªkbZax ds vuqlkj osfYMax djukA
23dsu vuyksMj ij 40@50 ,e0,e0 lkbZt dh Ldok;j ckj@jsy dks cnyukA
24fey gkWÅl ds ,l0vkj0lh0 ,oa dSu dSfj;j ds xys gq, xkbZMksa dks u;k cukdj yxkuk ,oa Vªk;y nsuk
25Mh0,l0,e0 LØhu dh xyh gqbZ lkbZM IysV dks 8@10 ,e0,e0 dh IysV ls cnyuk rFkk tkyh dks lgh djuk rFkk blds lkbZM ,oa VkWi xSi dks HkukA
26dsu vuyksMjks ds VwVs o f?kls iatks dh ejEer djuk rFkk mudh gkMZQsflax djuk
27fey jksyjks ij fn\"kk&funsZ\"kkuqlkj lsD\"ku xzqfoaxa dkVukA
28fey ua0&01] 02] 03 ds Mksukyh lwV] ftudh IysV lM&xy xbZ gS] mudks gVkdj nh xbZ IysV ls MªkbZax ds vuqlkj u, cukdj ,MtsLVcy cukuk rFkk larks\"ktud
29fey ij yxs Vh0vkj0ih0,Q0 ds xys gq, doj dks fudkyuk rkfd MªkbZax@lSEiqy ds vuqlkj nh xbZ IysV ds }kjk u, doj cukdj fQV djukA
30Cok;yj gkWÅl ij djk;s tkus okys dk;ksZ dh lqph ¼ykV&2½
31eSu cSxkl dSfj;j] cSxkl ,yhosVj ,oa fjVuZ cSxkl dSfj;j ds f?kls juj dks fudkydj mlds LFkku ij 08X65@10X50 ,e0,e0 dh ¶ySV vk;ju yxkuk rFkk oSfYMax okys Hkkx dks xzkbZ.Mj ls lkQ djds larks\"ktud
32eSu cSxkl dSfj;j] cSxkl ,yhosVj ,oa fjVuZ cSxkl dSfj;j dh f?klh gqbZ ckWVe IysV dks dkVdj gVkuk rFkk mlds LFkku ij nh xbZ 6@8@10 ,e0,e0 dh IysV yxkuk rFkk osSfYMax okys Hkkx dks xzkbZ.Mj okys Hkksx dks lkQ djdsss larks\"ktud
33eSu cSxkl dSfj;j] cSxkl ,yhosVj ,oa fjVuZ cSxkl dSfj;j dh f?klh gqbZ lkbZM IysV dks dkVdj gVkuk rFkk mlds LFkku ij nh xbZ 6@8@10 ,e0,e0 dh IysV yxkuk rFkk osSfYMax okys Hkkx dks xzkbZ.Mj okys Hkksx dks lkQ djdsss larks\"ktud
34eSu cSxkl dSfj;j] cSxkl ,yhosVj ,oa fjVuZ cSxkl dSfj;j ds f?kls LizksdsV~l dks lEcfU/kr MªkbZx ds vqulkj oSfYMax vkfn dj fjis;j djuk rFkk larks\"ktud
35eSu cSxkl dSfj;j] cSxkl ,yhosVj ,oa fjVuZ cSxkl dSfj;j ds {kfrxzLr xkbZMks dks dkVdj fudkyuk rFkk ;FkkLFkku u;k cukdj yxkuk ,oa larks\"ktud
36eSu cSxkl dSfj;j] cSxkl ,yhosVj ,oa fjVuZ cSxkl dSfj;j ds {kfrxzLr cwV dks dkVdj fudkyuk rFkk ;FkkLFkku u;k cukdj yxkuk ,oa larks\"ktud
37eSu cSxkl dSfj;j] cSxkl ,yhosVj ,oa fjVuZ cSxkl dSfj;j ds {kfrxzLr ,oa txg&txg ls eqMs ,oa detksj juj ckWDl dks dkVdj fudkyuk rFkk ;FkkLFkku fn;s x;s ,e0,l dss pSuy ,oa ,axy }kjk u;k juj ckWDl cukdj yxkuk ,oa iw.kZ :i ls ,ykbZesaV ,oa LVªSUFkfuax djuk rFkk larks\"ktud
38eSu cSxkl dSfj;j] cSxkl ,yhosVj ,oa fjVuZ cSxkl dSfj;j ds eqM+s ,oa {kfrxzLr juj ckWDl dks lh/kk djuk rFkk LVªsUFkfuax djuk ,oa iw.kZ :i ls ,ykbZaesaV dj larks\"ktud
39eSu cSxkl dSfj;j] ds {kfrxzzLr ,oa detksj Mkyks dks dkVdj fudkyuk rFkk nh xbZ IysV ls fx;j \"kk¶V flLVe lfgr u;k cukdj yxkuk ,oa larks\"ktud Vªk;y nsukA
40rhuks Cok;yj esa yxs cSxkl fQfMax \"kwV ds detksj o xys Hkkx dks dkVdj gVkuk rFkk nh xbZ IysV ls u;k cukdj yxkuk rFkk lEcfU/kr \"kk¶V o fx;j dh fjis;fjax djukA
41Cok;yj ds vkbZ0Mh0 Qsu o ,Q0Mh0 Qsuks dh dsflax tks vR;f/kd detksj o {kfrxzLr gks xbZ gSaA ftlds detksj Hkkx dks dkVdj gVkuk rFkk funsZ\"kkuqlkj 6@8 ,e0,e0 dh IysV ls u;k cukdj yxkuk] LVªSUFkfuax djuk ,oa larks\"ktud
42vkbZ0Mh0 o ,Q0Mh0 Qsu dh MfDVax dh iw.kZ :Ik ls LVªSUFkfuax dj larks\"ktud Vªk;y nsukA
43Cok;yj ij miyCèk Lis;j QhM iEi dks eksVj lfgr Qkm.Ms\"ku ij cSM cukdj iw.kZ :i ls ,ykbZuesaV dj QhV djuk rFkk lEcfUèkr dusD\"ku vkfn dj larks\"ktud Vªk;y nsuk A
44Cok;yj ds vkbZ0Mh0 Qsu vksj pheuh ds chp Msest gq;s MsEilZ dks dkVdj fudkyuk rFkk funs\"kkuqlkj MsEilZ dh fQfVax djuk o larks\"ktud <+ax ls Vªk;y nsukA
45Cok;yj ds ,Q0Mh0 Mªk¶V esa yxs Msest gq;s MsEilZ dks dkVdj fudkyuk rFkk funsZ\"kkuqlkj MsEilZ dh fQfVax djuk o larks\"ktud <+ax ls Vªk;y nsukA
46Cok;yj ua0&3 ds ,;j ghVj dh pkjks rjQ dh detksj] lkbZM] ckWVe o vij IYsVks dks dkVdj gVkuk rFkk nh xbZ 6@8 ,e0,e0 dh IysV ls u;k cukdj ;FkkLFkku yxkuk rFkk yhd izqQ osfYMaxdj larks\"ktud Vªk;y nsuk
47,;j ghVj dh IysVks dh iw.kZ :Ik ls LVªSUFkfuax dj larks\"ktud Vªk;y nsukA
48bDuksekbZtj ds pkjksa vkSj dh detksj ,oa {kfrxzLr IysV dks dkVdj gVkuk rFkk mlds Lfkku ij nh xbZ ubZ IysV yxkukA
49bDuksekbZtj dh IysVksa dh iw.kZ :i ls LVªsUFkfuax dj larks\"ktud Vªk;y nsukA
50Cok;yj ua0&03 ds ,s\"k pSEcj ds detksj Hkkx dks dkVdj fudkyuk rFkk nh xbZ IysV ls u;k cukdj yxkuk rFkk larks\"ktud Vªk;y nsukA
51Cok;yj gkWÅl esa iEi ,oa eksVj ds fy;s cSM cukdj iEi vkSj eksVj fQV djds Vªk;y nsukA ¼vi&Vw&20 ,p0ih0½
52Cok;yj gkWÅl esa iEi ,oa eksVj ds fy;s cSM cukdj iEi vkSj eksVj fQV djds Vªk;y nsukA ¼21 ,p0ih0 ls 75 ,p0ih0½
53Cok;yj g‚Ål esa iqjkus d‚ye] che pSSuy] ,axy vkfn dks fMlesUVfyax djuk ,oa u;s yxkukA
54Cok;yj g‚Ål esa 22** lkbZt ds esugksy e; CykbZ.M ds yxkuk A
55cSxkl Lyks Qsu ds dsflax dh detksj ,oa {kfrxzLr IysV dks dkVdj gVkuk rFkk nh xbZ IysV dks ;FkkLFkku u;k cukdj yxkukA yhd dks osfYMax dj larks\"ktud Vªk;y nsuk
56Cok;yj ua0&03 ds IylosfVax xzsMokj flLVe dh igyh iafDr dh ckjh dks jksdus ds fy;s dkfLVax djk;s x;s ¶ysi ,oa che dks Cok;yj dh nhokj esa funsZ\"kkuqlkj QhV djdj larks\"ktud Vªk;y nsukA
57Cok;yj ua0&02 ds lqijghVj esa yxs iqjkus \"kwV Cyksoj dks cgkj fudkyuk rFkk fn;s x;s u;s eksVjkbZTM \"kwV Cyksoj dks fQV djds larks\"ktud
58DysjhfQds\"ku] boksiksjsVj ,oa Mªk;j gkWÅl ij gksus okys dk;ksZ dh lqph ¼ykV&3½
59iqjkuh ,oa xyh gqbZ DokM dUMulsV@twl ghVj dUMulsV@ lhji cksry dks gVkuk ,oa 8@10 ,e,e dh ,e-,l- IysV ls cukdj leLr dusD\"ku bR;kfn djds Vªk;y nsukA
60nh xbZ IysV ls gkWij VªQ dks cukuk] ,axy }kjk LVªSUFkfuax djuk ,oa lUrks\"ktud
61fQYe VkbZi lYQj Qjusl ds bUVjehfM;sV dwyjksa dks gVkuk rFkk fn;s x;s ikbZi@IysV ls u;k cukdj yxkuk rFkk Vªk;y nsukA
62lkfRod VkbZi lYQj Qjuslksa ds lCyhes\"ku ikbZiksa dks nh xbZ ikbzi vFkok u;k cukdj yxkuk rFkk Vªk;y nsuk A
63DokM ckMh@osij lSy@lsehdsluj esa vEcszyk dh xyh gqbZ IysV dks gVkuk rFkk nh xbZ IysV ls fjis;j djuk rFkk Vªk;y nsukA
64DokM ckMh@osij lSy@lsehdsluj ds vEcszyk dks gVkuk rFkk 6@8 ,e-,e- dh ,e-,l- IysV ls u;k cukdj yxkuk rFkk Vªk;y nsukA
65DokM ckMh@lsehdsluj ds xys lsovkWy dks gVkuk rFkk 8@10 ,e-,e- dh ,e-,l- IysV ls u;k cukdj yxkuk rFkk Vªk;ynsukA
66DokM ckMh@lsehdsluj ds lsovkWy dh xyh IysV dks gVkuk rFkk nh xbZ IysV yxkdj fjis;j djuk rFkk Vªk;y nsukA
67oSD;we fQYVj dh xyh fQYVªsV cksry dks gVkuk rFkk 8@10 ,e,e dh ,e-,l- IysV ls ubZ fQYVªsV cksry cukdj yxkuk rFkk leLr dusD\"ku bR;kfn djds Vªk;y nsukA
68oSD;we fQYVj dh fQYVªsV cksryksa dh xyh IysV dks gVkdj nh xbZ IysV yxkdj fjis;j djuk rFkk Vªk;y nsukA
69oSD;we fQYVj dh Vªs dh xyh IysV dks gVkuk rFkk nh xbZ IysV yxkdj fjis;j djukA
70pwuk LVs\"ku ij yxs ykbZe Lysdj ds xys \"kSyksa dks dkVdj gVkuk ,oa muds LFkku ij nh xbZ IysV ls u;k cukuk ,oa Vªk;y nsukA
71lkfRod lYQj Qjusl dh 8@10 ,e,e dh ubZ IysV ls esYVj dks cukuk rFkk mlesa LVhe DokbZy dks yxkdj lUrks\"ktud Vªk;y nsukA
72lkfRod lYQj Qjusl ds esYVjksa ds vUnj yxh] xyh gq;h Dok;y dks dkVdj fudkyuk rFkk u;h cukdj fQV djuk ,oa gkbZMªksfyd VsfLVx djds larks\"ktud Vªk;y nsukA
73oSD;we fQYVj ds dUMsUljksa dh xyh IysV dks gVkdj ubZ IysV yxkdj fjis;j djuk rFkk Vªk;y nsukA
74fQYe VkbZi lYQj Qjusl ds pkSdj esYVj dh xyh IysV dks dkVdj gVkuk ,oa nh x;h 10 ,e0,e0 u;h IysV ls cukukA
75fQYe VkbZu lYQj ds esYVj esa yxh gq;h {kfrxzLr@detksj LVhe DokbZy dks dkVdj u;h DokbZy cukuk ,oa gkbZMªksfyd VsfLVax djds lUrks\"ktud Vªk;y nsukA
76oSD;we fQYVj ds dUMsUljksadks gVkuk rFkk 8@10 ,e,e dh IysV ls u;k cukdj yxkukA
77lkfRod lYQj Qjusl ds dwyjksa ds vUnj SO2psEcj dh xyh IysV dks gVkdj nh xbZ IysV ls fjis;j djuk] dwfyax ikbZi vkfn yxkdj Vªk;y nsukA
78lkfRod lYQj Qjusl ds dwyjksa ds vUnj SO2psEcj dks u;k cukdj yxkuk rFkk Vªk;y nsukA
79lYQj Qjusl LVs\"ku ij iqjkuh xyh gqbZ ykbZu dks gVkuk ,oa nh gqbZ ubZ fleysl@,e0,l0 ykbZe dks ¶ySUt lfgr yxkdj TokbaV ,oa cksYV VkbZV djus dk dk;Z
80twl lYQkbZVj ds \"kSy dks LVwy dks dkVdj vkaf\"kd detksj fgLls dks fn xbZ 8@10 ,e0,e0 dh IysV ls cnyuk ,oa Lvwy dks iqu% tksMdj larks\"ktud Vªk;y nsukA
81twl lYQkbZVj ds uhps fLFkr lYQkbZVsM twl fjflfoax VSad ds detksj \"kSy VkWi ,oa ckWVe dks cnyuk rFkk lEcfU/kr ikbZi ykbZu ds dusD\"ku djuk
82Cok;fyax gkWÅl esa fLFkr vksoj gsM VSad dh nh xbZ 100 ,e0,e0 ds pSuy@,axy ls LVªSUFkfuax djus dk dk;ZA
83DokM ,oa iSu ds osij ikbZi ykbZu ij LVSªUFkfuax ds fy;s 3 ls 4 bap pkSM+k fjax yxkdj oSfYMax djukA
84DokM ckWMh dh detksj iM+ xbZ Nr dks dkVdj gVkuk ,oa nh xbZ 12 ,e-,e- dh IysV ls cukdj yxkuk rFkk Vªk;y nsukA
85lsehds\"kuj@osij lSy@DokM ckMh dh lSy ds detksj Hkkx dks dkVdj fudkyuk rFkk mldss LFkku ij nh x;h 10@12,e-,e- IysV dks eksMdj yxkuk ,oa lUrks\"ktud yhd izqQ Vªk;y nsukA
86u;s@iqjkus DokM lSV dh ckWMh ua0&4 ls dUMsU\"kj rd dh 1000,e-,e- Mk;k dh detksj osij ikbZi dks gVkuk rFkk nh x;h 10 ,e-,e- dh IysV dks eksMdj ;FkkLFkku yxkuk ,oa lUrks\"ktud yhd izqQ Vªk;y nsukA
87Mh lqqijghVj ls lsehds\"kuj@osij \"kSy dks tkus okyh,DtkLV ikbZi ykbu ds detksj Hkkx dks gVkuk mlds LFkku ij nh x;h 8@10 ,e0,e0 dh IysV ls u;h ikbZi ykbZu 800 ,e0,e0 Mk;k dh cukdj yxkuk ,oa larks\"ktud Vªk;y nsukA
88twl ghVj ds VkWi ,oa ckWVe gSMj dh xyh gqbZ ikVhZ\"ku IysVks dks dkVdj fudkyuk rFkk mlds LFkku ij nh x;h 8@10 ,e-,e- dh IysV dksyxkuk rFkk mlesa jcj LVªhi dks fQV djus dk vjsUtesUV djuk ,oa lUrks\"ktud Vªk;y nsukA
89osij \"kSy@lsehds\"kuj@DokM ckWMh esa yxs vEcszyk esa LiksV yxkuk ,oaLVsUFkfuax djuk rFkk lUrks\"ktud Vªk;y nsukA
90oSD;we fQYVj dh xyh Vªs dks fudkyuk rFkk 8@10 ,e-,e- dh IysV ls u;k cukdj yxkuk ,oa lUrks\"ktd Vªk;y nsukA
91twl ghVj ds mij ,oa uhps ds xys gq;s IysV QkeZ dks fudkydj u;k cukuk rFkk bls lEcfU/kr LVªsDpj dh LVsªfUFkax djkuk
92DokM ds uhps ,oa mij ds xys gq;s IysV QkeZ dks gVkdj nh x;h IysV ls u;k cukuk rFkk blls lEcfU/kr LVsªsDpj dks LVªsfUFkax djkukA
93DokM ckfM;ksa ds detksj bUVjehfM,V@ izFke osij@f}rh; osij ikbZi dks fudkyuk rFkk 8@10 ,e-,e- dh IysV ls Mk;k 670 ,e-,e- dh ubZ cukdj yxkuk ,oa larks\"ktud Vªk;y nsukA
94dUVhfu;wl e\"khuksa ij yxs [kjkc VªktsV ghVj dks gVkuk rFkk u;k cukdj yxkuk ,oa lUrks\"ktud Vªk;y nsukA
95fdzLVykbZtj] iSu LVs\"ku ,oa e\"khuksa ds xys xVj dks gVkuk ,oa u;k cukdj yxkukA
96gkWij dk 1-5 eh0 x 1-5 eh0 VªQ 5 ,e-,e- dh IysV dks 10 ,e,e dh IysV ls fjfoV djds u;k cukuk ,oa dusfDVax jkWM yxkdj Vªk;y nsukA
97dksUVh0 e\"khuksa ds doj dks 6@8 ,e,e dh IysV ls u;k cukdj cnyuk
98nh xbZ IysV ls gkWij VªQ dks cukuk] ,axy }kjk LVªSUFkfuax djuk ,oa lUrks\"ktud
99eksykfll Vsad ij yxs Lisz ikbZi dks pSd djds] xys ikbZi dks cnyuk rFkk ikbZi ds Nsn dks pSd djds lkQ djus ds mijkUr txg ij yxkuk ,oa Vªk;y nsukA
100oSD;we fQYVj ij cus eM feDpj dh xyh IysV gVkdj nh x;h ubZ IysV ls fjis;j djukA
101eM feDpj ds vUnj xys LØw dUos;j dks gVkuk rFkk nh x;h ubZ IysV ,oa ikbZi ls u;k cukdj yxkuk o Vªk;y nsukA
102oSD;we fQYVj ds uhps yxs fQYVªsV VSad dh xyh IysV gVkuk rFkk nh x;h IysV yxkdj fjis;j djuk o Vªk;y nsukA
103DysjhQk;j ds dEikVZesUVksa dh Vsªdks dkVdj gVkuk rFkk nh x;h 6 ,e-,e- IysV ls u;k cukdj yxkuk ,oa larks\"ktud Vªk;y nsukA
104DysjhQk;j ds r`rh; dEikVZesUVksa dh Vsª xyh gq;h dfy;ksa dks dkVdj gVkuk rFkk nh x;h 6 ,e-,e- IysV ls u;k cukdj yxkuk ,oa larks\"ktud Vªk;y nsukA
105DysjhQk;j ds twl ,oa eM fon~ Mªk;y ckDl dh detksj IysV dks dkVdj gVkuk ,oa nh ubZ IysV ls cukdj yxkuk rFkk leLr dusD\"ku djukA
106fQYe VkbZi lYQj Qjusl ds cfuax pSecj ds detksj \"kSy dks yxHkx uhps ls 5 fQV yEckbZ rd nh x;h IysV ls iSp djkuk rFkk larks\"ktud Vªk;y nsukA
107nksuksa oSD;e fQYVj ds detksj ,oa xys gq;s IysVQkeZ dks nh x;h IysV ls u;k cukxj yxkukA
108lhji lYQkbZV ds detksj \"kSy dks dkVdj gVkuk rFkk nh x;h ,e-,l IysV ls u;k cukdj yxkuk ,oa larks\"ktud Vªk;y nsukA
109fQYe VkbZi lYQj Qjusl ds vk[kjh dwyj ds vUnj ,l0vks0Vw0 pSEcj dks gVkuk rFkk nh x;h 10 ,e0,e0 dh ,e0,l0 IysV ls u;k cukdj yxkuk rFkk leLr dusD\"ku djukA
110Dyh;j twl iEiksa ds ikl yxh xyh gqbZ Dyh;j twl dh cksry dks gVkuk rFkk nh x;h ubZ IysV ls cukdj yxkuk rFkk leLr dusD\"ku djukA
111Mksj DysfjQk;j ds vUnj leLr lM+s&xys eM~ LØSij dks dkVdj gVkuk rFkk fn;s x;s IysV ,oa cSYV dks lkbZt ds vuqlkj cukdj yxkuk rFkk larks\"ktud Vªk;y nsukA
112DysjhQk;j ds vUnj yxh lsUVªy \"kk¶V dks nh xbZ IysV ls fjax cukdj lsUVªy \"kk¶V ds detksj fgLls esa LVªsUFkfuax djukA
113DyhjhQk;j ds vUnj cus izR;sd dEikVZesaV ds detksj eM&cwV dh IYsV dks dksVdj gVkuk rFkk nh xbZ ubZ IysV yxkukA
114boksiksjsVj lsV&, dh f}rh; ckWMh ls czkl V~;wcksa dks fudkydj LVksj esa tek djukA ¼ghfVax ljQsl 540 eh0 Ldok;j½
115boksiksjsVj lsV , dh f}rh; ckWMh dh dySf.Mª;k dks gVkdj LØSi ;kMZesa j[kuk rFkk 540 ehVj LDok ghfVx ljQsl dh ubZ dySf.Mª;kdks yxkdj fQV djuk rFkk leLr ikbZi ykbZu] okYoksa] ,lkslhjht dks ;FkkLFkku yxkuk ,oa lUrks\"ktud Vªk;y nsukA
116boksiksjsVj lsV , dh f}rh; ckWMh ¼540 ehVj Ldok ghfVax ljQsl½ esa 42X45X2000 ,e0,e0 dh ,l0,l0 V~;wCkksa dks Mkyuk rFkk ,DliSUM djuk ,oa 5 ds0th0@lseh0 Ldok ij lUrks\"ktud gkbZMªksfyd VsfLVax nsukA
117,@ch0 gSoh dh ju vkQ VSd vk;drkdj Vadh dh lkbZM IysVksa dks 06 ,e0,e0 dh U;h IysV ls cnyuk ,oa ckVe IysV 8 ,e0,e0 dh u;h IysV cnydj dusD\"ku bR;kfn dj lUrks\"ktud Vªk;y nsukA
118dksUVh0 e\"khuksa ds uhps eSXek feDpj dh detksj lkbZM IysV@ckWVe dks 08 ,e0,e0 dh ubZ IysV ls cnydj lUrks\"ktud Vªk;y nsukA
119eS\"khjs\"ku VSad dh xyh gq;h vk;drkdkj Vadh dks dkVdj gVkuk rFkk nh x;h 8@10 ,e0,e0 dh U;h IysV ls cukdj yxkuk ,oa lUrks\"ktud Vªk;y nsukA
120dkWUVhU;w,l e\"khuks ,oa cSp VkbZi e\"khuks ds Åij fLFkr ixfey dh detksj lkbZM IysV@ckWVe dks 8 ,e0,e0 dh nh xbZ ubZ IysV ls cnydj larks\"ktud Vªk;y nsukA
121dkWUVhU;w,l e\"khuksa ds \"kwV dks fn;s x;s 5 ,e0,e0 dh IysV ls cnydj larks\"ktud Vªk;y nsukA
122eS\"khjs\"ku VSad dh iqjkuh dksfudy ,oa pkdkSj Vadh dks dkVdj gVkukA
123jkW twl vk;drkdkj Vadh dh ckWVe dks dkVdj gVkuk ,oa nh x;h 8@10 ,e0,e0 u;h IysV ls cukdj lUrks\"ktud Vªk;y nsukA
124jksMh eSYVj dh vkeZ dh VwVs gq;s Hkkx dks yxkuk rFkk lUrks\"ktud Vªk;y nsuk
125900 ,e0,e0 ds cS.M fMLesUVy dj QSfczdsV ,oa bjSD\"ku dj yxkuk ,oa larks\"ktud Vªk;y nsukA
1261100 ,e0,e0 ds cS.M fMLesUVy dj QSfczdsV ,oa bjSD\"ku dj yxkuk ,oa larks\"ktud Vªk;y nsukA
127oSD;we fQYVj ij yxs ,thVsVj dks dkVdj ckgj fudkyuk ,oa fn;s x;s ,axy ,oa pSuy vkfn yxkdj u;k ,ftVsVj cukdj yxkuk rFkk larks\"ktud Vªk;y nsukA
128lkfRod lYQj Qjusl ds lsdsUMªh cuZj ds \"kSy dks ,oa blds fufiy dks cnyukA
129DysjhQk;j ds detksj Qksfeax pSEcj ds \"kSy dh IysV dks dkVdj gVkuk ,oa nh xbZ IysV 6@8 ,e0,e0 ls u;s \"kSy rS;kj dj yxkuk ,oa Vªk;y nsukA
130¼v½& iqjkus dkWye] che pSuy vkfn dks fMlesUVfyax djukA¼c½& ubZ dkWye] che pSuy vkfn cukdj yxkuk ¼
131DysjhfQds\"ku ,oa lsUVh¶;wxy gkÅl esa iqjkus xksy] pkSdksj Vsad@ oSflYl dh fMlesUVfyax djuk
132DysjhfQds\"ku ,oa lsUVh¶;wxy gkÅla esa xksy] pkSdksj Vsad@ oSflYl 8@10 ,e,e IysV ls cukuk
133iqjkus xys gq;s IysVQkeZ dks gVkuk rFkk mlds LFkku ij u;k IysVQkeZ cukdj yxkukA
13416bap@18bap lkbZt ds esugksy e; CykbZ.M ds yxkukA
135iEi ds fy;s cSM cukdj iEi vkSj eksVj fQV djds Vªk;y nsuk vi&Vw 20 ,p-ih-
136iEi ds fy;s cSM cukdj iEi vkSj eksVj fQV djds Vªk;y nsuk 21 ,p-ih- ls 75 ,p-ih- rd
137eksykfll Vsad ij 4@6 bap Mk;k ds 02 gkbZ¶yks iEiksa ds csM cukuk rFkk eksykfll dh lSD\"ku ,oa fMyhojh ykbZu dks tksMdj lUrks\"ktud Vªk;y nsuksA
138iqjkus xksy] pkSdksj Vsad@ oSflYl dh fMlesUVfyax djuk rFkknh xbZ IysV 8@10 ,e-,e- ls rS;kj dj lUrks\"ktud Vªk;y nsukA
139Cok;fyax gkWÅl ls Cok;yj rd tkus okyh leLr dUMulsV ikbZi ykbZu ¼4** Mk;k 8 vnn½ dks iqjkus osij \"kSy ds ikl dkVdj lqjf{kr LFkku ij j[kuk ,oa bu 8 vnn 4** dh ykbZu ij okYo yxkdj gSMj cukuk rFkk gSMj dh fMyhojh ykbZu 01 vnn 8** ikbZi dks Cok;yj QhM okVj VSad rd ys tkuk ,oa 8** dh ikbZi ykbZu dh LVªSUFkfuax dj larks\"ktud yhd izqQ Vªk;y nsukA
140iSu] batsD\"ku] fØLVykbZtj ,oa bZ-Vh-ih- ij djk;s tkus okys dk;ksZ dh lqph ¼ykV&4½
141iSuksa ds xys lsovkWy dks gVkdj 6@8 ,e,e IysV ls u;k cukdj yxkukA
142iSu ¶yksj fLFkr iSu dh xyh ,oa {kfrxzLr detksj osij ikbZi Mk;k 1100 ,e,e] yEckbZ izfr ehVj dkss gVkuk rFkk nh xbZ IysV ls u;k cukdj yxkuk ,oa Vªk;y nsukA
143iSu ¶yksj fLFkr iSu dh xyh ,oa {kfrxzLr detksj osij ikbZi Mk;k 900 ,e,e] yEckbZ izfr ehVj dkss gVkuk rFkk nh xbZ IysV ls u;k cukdj yxkuk ,oa Vªk;y nsukA
144dUMsUljksa ds iqjkus yxs Vsy ikbZi dks gVkdj LVsuySl LVhy@,e-,l- ds Vsy ikbZi funsZ\"kkuqlkj yxkuk ¼8@10@12 bap lkbZt½A
145bUtsD\"ku] dwfyax VkWoj Lisz iEiksa ds lD\"ku ikbZi cukuk rFkktkyh funsZ\"kkuqlkj cukdj yxkukA
146iSuksa dh xyh gqbZ \"kSy IysV dks gVkuk rFkk mldh txg 10@12 ,e,e dh ,e-,l- IysV dks yxkuk rFkk Vªk;y nsukA
147eksykfll Vsad@eksykfll DUMhluj dh xyh LVhe DokbZy dks fudkyuk rFkk ubZ DokbZy cukdj yxkukA
148iSu ij yxs gq;s vEcjsyk dks gVkuk rFkk nh x;h 6@8 ,e-,e- dh IysV ls u;k cukdj yxkuk ,aoa Vªk;y nsukA
149iSu ds xys dksu@o`Urkdkj Hkkx dks dkVdj gVkuk rFkk mlds LFkku ij nh x;h 10@12 ,e-,e- dh ,e-,l- IysV dks eksM dj yxkuk] vUnj o ckgj oSfYMx dj rFkk ikuh Hkj Vªk;y nsukA
150iSu ds \"kSy ,oa Nrksa ls iqjkus xys ,fxya@pSuyksa dks gVkdj fn;s x;s u;s ,afxy@pSuyksa ls LVsªFkfuax djukA
151bUtsD\"ku Lisz iEiksa ds lD\"ku ikbZiksa dks tkyh lfgr fjis;j djukA
152iSu ds mijh Hkkx esa yxs Mkse ds xys o detksj \"kSy o ckWVe dksu ds Hkkx dkVdj gVuk mlds LFkku ij nh x;h 10@12 ,e-,e- dh ,e-,l IysV ls eksMdj cukdj yxkuk rFkk lUrks\"ktud oSfYMax dj Vªk;y nsukA
153iSu vEcsyk dh xyh LiksZV dks dkVdj gVkuk o u;k pSuy ,oa ,fXy yxkdj LVSfUFkax djukA
154fofHkUu LFkkuksa ij iqjkuh ,oa xyh gqbZ IysV ds LFkku ij nh xbZ ubZ IysV ls iSfpax djuk A
155iqjkuh fudyh gqbZ fofHkUu lkbZtksa dh IysVksa dks lh/kk djukA
156fofHkUu lkbZt dh lh<+h;ksa dks cukdj funsZf\"kr LFkku ij yxkukA
157iqjkus dkWye] che pSuy vkfn dks fMlesUVfyax djuk ,oa u;s yxkukA
158iqjkus xksy] pkSdksj Vsad@ oSflYl dh fMlesUVfyax djukA
159xksy] pkSdksj Vsad@ oSflYl 8@10 ,e,e IysV ls cukukA
160iqjkus xys gq;s IysVQkeZ dks gVkuk rFkk mlds LFkku ij u;k IysVQkeZ cukdj yxkukA
161iSu ¶yksj fLFkr esugksy 20**@22** e; CykbZ.M lfgr yxkuk
162detksj dV~Vk ykbZu] dUMu\"ksV ykbZu] lhji ykbZu vkSj eksyslsl ykbZuksa dks cnyukA
163batSD\"ku iEi ua0 2 ,oa 4 dh iqjkuh ,u-vkj-oh-¼12 bap½ dks gVkdj funsZ\"kkuqlkj 10 ,e-,e- IysV ls u;h ,u-vkj-oh- cukdj yxkukA
164lh eksuks ofVZdy fØLVykbZtj dh VwVh gqbZ vkeZ dks dkVdj fudkyuk o nh xbZ vkeZ cukdj lUrks\"ktud Vªk;y nsukA
165lh eksuks ofVZdy fØLVykbZtj dh yhdst okVj DokbZy dks yhd izqQ djuk ,oa 50 ih0,l0vkbZ0 dss gkbZMªksfyd izs\"kj ij larks\"ktud Vªk;y nsukA
166iSu ¶yksj fLFkr batsD\"ku gSMj Mk;k 790 ,e-,e- yEckbZ 15 eh0 ds xys ,oa {kfrxzLr fgLls dks gVkuk rFkk nh x;h IysV ls u;k cukdj yxkuk ,oa lEcfU/kr gVk;s x;s dusD\"ku@fuIiy yxkdj lUrks\"ktud Vªk;y nsukA
167fey lfefr esa LFkkfir 45 Vu {kerk ds iSu dh iqjkuh dySf.Mª;k dks vius la\"kk/kuksa }kjk gVkuk rFkk funsZf\"kr LFkku@LØSi ;kMZ esa j[kuk rFkk fey lfefr ds dsu ;kMZ@LVksj esa miyC/k u;h dySf.Mª;k 45 Vu dks gVk;h x;h dySf.Mª;k ds LFkku ij LFkkfir djuk ,oa leLr ikbZi ykbZuksa] okYoksa dks yxkuk rFkk vko\";drkuqlkj LVsftax esa ifjorZu dj larks\"ktud Vªk;y nsukA
168iSu ua0&02 dh yhdst ckWVe lkslj dks vUnj ,oa ckgj ls osfYMax djuk ,oa jhc bR;kfn yxkdj yhdst izqQ larks\"ktud osfYMax djukA
169iSu dhczkl@,l0,l0 V~;wcksa dks fudkydj LVksj esa tek djukA
170fey lfefr }kjk nh x;hiSu dh czkl@,l0,l0 u;h V~;wcksa dks dySf.Mª;k esa yxkdj ,DlisUM djuk ,oa 04 ds0th0 izfr lS0eh0 Ldok ds isz\"kj ij dySSf.Mª;k gkbZMªksfyd VSfLVx djkdj lUrks\"ktud Vªk;y nsuksA
171iSu LVs\"ku ij yxh eksykfll dh xyh iqjkuh Vadh lkbZt yEckbZ 3 ehVj] pkSMkbZ 2 ehVj rFkk mpkbZ 2 ehVj dh 01 vnn dks iSu ,oa DokM dh ckWfM;ksa ls fudyh gqbZ iqjkuh IysVksa dks lh/kk dj ,oa ubZ IysVksa ls mijksDr lkbZt ds vuqlkj cukdj dj yxkuk rFkk larks\"ktud Vªk;y nsukA
172iSu ds detksj ckVe \"kkslj dkVdj mlds LFkku ij nh xbZ u;h ckWVe \"kkslj vFkok nh gqbZ 16 ,e0,e0 dh IysV ls QSczhdsV dj yxkuk o leLr ikbZi ykbZu dusD\"ku bR;kfn rFkk dV~Vk fMLpktZ okYo dks yxkdj larks\"ktud Vªk;y nsukA
173iSu LVs\"ku ij fLFkr eksykfll LVs\"ku dh xyh gqbZ lkbZM IysVks dks nh xbZ ubZ IysVksa dks eksM dj u;k cukuk rFkk xys gq;s ckWVe dks.k dks nh xbZ ubZ IysV ls cnydj larks\"ktud Vªk;y nsukA
174fdzLVykbZtjks ds xys ,oa {kfrxzLr flLVe dh ejEer djukA
175fØLVykbZtj ds oeZ Oghy dks gVkdj fn;s x;s u;s IysusVjh fx;j ckDl dks cSM cukdj yxkuk ,oa larks\"ktud Vªk;y nsukA
176fdzLVykbZt+j ds lM+s xys lkbZM IysV ,oa ckWVe gkWQ dks nh xbZ IysV ls u;k yxkdj cnyuk ,oa Vªk;y nsukA
177fØLVkykbZtjksa dh {kfrxzLr \"kk¶V ,oa vkeZ dks dkVdj ckgj fudkyuk rFkk ubZ ikbZi ,oa ,afxy pSuy ls rS;kj djuk rFkk larks\"ktud Vªk;y nsukA
178fØLVykbZtjks ds detksj lkbZM doj ,oa detksj lSy dks fn;s x;s pSuy ,oa ,afxy ls liksVZ yxkdj LVªsFkfuax djukA
179iSu ¶yksj LFkkfir flji@eSYV@, ykbZV@ , gSoh@ch gSoh@lh ykbZV@ lh1 gSoh Vafd;ksa dh xyh gqbZ IysV dks dkVdj gVkuk ,oa fn;s IysV 6@8 ,e0,e0 dh IysV ls cukdj yxkukA
180iSu ¶yksj fLFkr oSD;we fØLVykbZtj ds lkbZM IysV ¼QjUV ,oa cSd½ ds xys ,oa {kfrxzLr fgLls dks gVkuk rFkk nh x;h IysV 12@16 ,e0,e0 ls u;k cukdj yxkuk ,oa lEcfU/kr dkVs x;s dusD\"ku ,oa fuEiy dks oSfYMax djds lUrks\"ktud Vªk;y nsukA
181iSu ¶yksj fLFkr oSD;we fØLVykbZtj ds \"kSy ds xys ,oa {kfrxzLr fgLls dks gVkuk rFkk nh x;h IysV 10@12 ,e0,e0 ls u;k cukdj yxkuk ,oa lEcfU/kr dkVs x;s dusD\"ku ,oa fuEiy dks oSfYMax djds lUrks\"ktud Vªk;y nsukA
182iSu ij yxs iqjkus dVvksoj okYo dks dkVdj gVkuk rFkk blds LFkku ij U;weSVªhd dVvksoj okYo dks yxkdj larks\"ktud Vªk;y nsukA
183iSu ij yxs iqjkus fMLpktZ okYo dks dkVdj gVkuk rFkk blds LFkku ij U;weSVªhd fMLpktZ okYo dks yxkdj larks\"ktud Vªk;y nsukA
184bZ0Vh0ih0 dh detksj ikbZi ykbZu dks nh xbZ ikbZi ykbZu ls cnyuk ,oa lUrks\"ktud Vªk;y nsukA
185bZ0Vh0ih0 ds ySxwu ls ;w0th0vkj0 rd ikbZi ykbZu dks yxkdj lUrks\"ktud Vªk;y nsukA
186bZ0Vh0ih0 ds iEiksa ds detksj cSM dk cnyuk A
187,bZjs\"ku VSad esa iMh fM¶;w\"kj dh ,;j ykbZu fufIiy ,oa ikbZi ykbZu dks cnyukA
188900 ,e0,e0 ds cS.M fMLesUVy dj QSfczdsV ,oa bjSD\"ku dj yxkuk ,oa larks\"ktud Vªk;y nsukA
1891100 ,e0,e0 ds cS.M fMLesUVy dj QSfczdsV ,oa bjSD\"ku dj yxkuk ,oa larks\"ktud Vªk;y nsukA

AI Tender Summary

OUR REF NO 43438853
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 40 Lakhs
LAST DATE 10-06-2024
Authority
Authority Name Kisan Co-Oprative Sugar Mills Ltd
Work Description tender for MILL & BOILER HOUSE,BOILING HOUSE AND ETP FABRICATION AND ERECTION WORK, Welding work on the sides of TRPF rollers as per requirement. The work of repairing the worn teeth of IRC, SRC and can carrier sprockets by welding as per requirement. Removing the weak and damaged side plate of IRC Gali and replacing it with a new plate of 08/10 mm given and giving a satisfactory leak proof trial. Removing the weak and damaged bottom plate of IRC Gali and replacing it with a new plate of OB/10 mm given and giving a satisfactory leak proof trial. The work of fixing the broken teeth of the pressure shoot of the mill and repairing the worn teeth and making them high facing. The can carrier was tilted from the upper side, its channels were heated, straightened and aligned to complete the work. Repair by opening the old pressure chute on the mill and completely replacing the corroded part. and assembling the damaged part of the SS plate by welding it properly. And the work of fitting it on the mill and giving it a satisfactory trial. On the work of straightening old plates of different sizes The work of removing the stressed boot of IRC and SRC and making it from new plate of 08 to 10 mm, installing it at its place and giving trial. Replacement of worn out runners of Cane Carrier, SRC and IRC with 8 x 65 mm or 10 x 65 mm pellet iron and repair/replacement of weak guide lines. The work of making a platform by straightening the old plates of different sizes. The work of cutting out old railing and making new railing by straightening the old protruding pieces. The work of cutting and removing the corroded juice tanks of the Mill House and installing them at the same place along with fittings after fabrication from the given new MS plate of 08 mm. The work of making cover of mill bearing by bending the weak 6 mm MS plate protruding from the cane carrier. Cutting and removing all the corroded and damaged plates and angles on the can carrier and installing the given 6/8 mm MS plate by bending it and giving a satisfactory trial by installing new angles. Replacement of melted side plate and top plate of Chopper, Leveler, Fibrizer with 6/8/10/12 mm plate. Making new racks of SRC as per drawing. Making new racks of IRC as per drawing. Welding work on the sides of TRPF rollers as per requirement. Repairing TRPF rollers by welding/high phasing. Cut crown pinion of mill house/crown pinion of TRPF Welding as per instructions/drawings. Replacement of 40/50 mm size square bar/rail on can unloader. Remodeling and trial fitting of SRC and can carrier neck guides of mill house. Replacing the corroded side plate of DSM screen with 8/10 mm plate and repairing the mesh and closing its side and top gaps. Repairing and high-facing broken and worn claws of can unloaders. Cutting section grooving as per guidelines on mill roller. Dhonali suits of Mill No. 01, 02, 03, whose plates have completely melted, should be removed, made new as per the drawing from the given plate, made adjustable and given trial in a satisfactory manner. To remove the worn out cover of TRPF installed on the mill so as to make and fit a new cover using the plate given as per the drawing/ sample. List of works to be done on Boiler House (Lot-2) Remove the worn runner of main bagasse carrier, bagasse elevator and return bagasse carrier and replace it with 08165/10150 mm flat iron and clean the welding part with a grinder and give it a satisfactory trial. Cutting and removing the worn bottom plate of main bagasse carrier, bagasse elevator and return bagasse carrier and replacing it with the given 6/8/10 mm plate and giving a satisfactory trial by cleaning the welding part with a grinder. Cutting and removing the worn side plate of main bagasse carrier, bagasse elevator and return bagasse carrier and replacing it with the given 6/8/10 mm plate and giving a satisfactory trial by cleaning the welding part with a grinder. To repair the worn out sprockets of main bagasse carrier, bagasse elevator and return bagasse carrier by Bhunsar welding etc. of the respective drawings and give them a satisfactory trial. Cutting out the damaged guides of main bagasse carrier, bagasse elevator and return bagasse carrier and installing new ones in place and giving satisfactory trials. Cutting out the damaged boot of Man Baggage Carrier, Baggage Elevator and Return Baggage Carrier, making new one at its place and giving satisfactory trial. Cutting out damaged and weak runner boxes of main bagasse carrier, bagasse elevator and return bagasse carrier and installing a new runner box at the same place using the channel and angle given by MS and doing complete alignment and strengthening and satisfactory Giving trial properly. Issues with main bagasse carrier, bagasse elevator and return bagasse carrier and straightening and strengthening of damaged runner box and complete alignment and satisfactory trials. Cutting out damaged and weak shields of Man Baggas Carrier and installing new ones along with gear shaft system from the given plate and giving satisfactory trials. Cutting and removing the weak and sore part of the bagasse feeding chute installed in all three boilers and installing a new one from the given plate and repairing the related shaft and gear. The casings of ID fan and FD fan of the boiler have become extremely weak and damaged. Cutting out the weak part and installing a new one from 6/8 mm plate as per the instructions, strengthening it and giving a leak proof trial in a satisfactory manner. To give satisfactory trial by completely strengthening the ducting of ID and FD fans. Fit the spare feed pump available on the boiler by making a bed on the foundation along with the motor, completely aligning it and giving a satisfactory trial by making related connections etc. Removing the damaged dampers between the ID fan and chimney of the boiler and fitting the dampers as per instructions and giving a satisfactory trial. Removing the damaged dampers fitted in the FD draft of the boiler and fitting the dampers as per instructions and giving satisfactory trials. Removing the weak, side, bottom and upper plates around the air heater of Boiler No. 3 by cutting them and making new ones from the given 6/8 mm plate and installing them in place and giving a satisfactory trial by doing leak proof welding. To give satisfactory trial by completely strengthening the plates of the air heater. Removing the weak and damaged plate around the economizer and installing a new plate on its back. To give satisfactory trial by completely strengthening the plates of economizer. Cutting out the weak part of the ash chamber of boiler no. 03 and installing a new one from the given plate and giving a satisfactory trial. In the boiler house, after making a fitting for the pump and motor, fitting the pump and motor and giving it a trial. (up-to-20 HP) Make a bed for the pump and motor in the boiler house, fit the pump and motor and give it a trial. (21 HP to 75 HP) Dismantling and installing new columns, beam channels, angles etc. in the boiler house. Installation of 22 size manhole with blind in boiler house. Cutting and removing the weak and damaged plate of the casing of bagasse slow fan and installing a new plate in place. Give a satisfactory trial by welding the leak To give satisfactory trial by fitting the casted flap and beam in the wall of the boiler as per the instructions to stop the turn of the first row of pluswetting grade wise system of boiler no. 03. Removing the old shoot blower installed in the superheater of Boiler No. 02 and fitting the new motorized shoot blower provided and giving it a satisfactory trial. List of works to be done on Clarification, Evaporator and Dryer House (Lot-3) Removal of old and corroded quad condenser/juice heater condenser/syrup bottle and replacement of 8/10 mm M.S. Make it from the plate and do all the connections etc. and give it a trial. Making the hopper trough from the given plate, strengthening it by angle and giving satisfactory trials. Removing the intermediate coolers of film type sulfur furnace and making new ones from the given pipe/plate and giving trial. Installing and trialling the supplied pipes or making new ones to the sublimation pies of Satvik Time Sulfur Furnaces. Removal of melted plate of Umbrella in Quad Body/Vapor Cell/Semi-Canner and repairing with the provided plate and giving trial. Removal of quad body/vapour cell/umbrella of semi-circulator and 6/8 mm. of M.S. Make a new plate and install it and give it a trial. Removing the saveall from the neck of the quad body/semicasener and 8/10 mm. of M.S. Make a new plate and install it and give it a trial. Removing the gully plate of the saveall of a quad flood/semi-quadrant and repairing it by installing the given plate and giving it trial. Removing the filter bottle and 8/10 mm M.S. of the vacuum filter. Make a new filtration bottle from the plate and install it and give it a trial by making all the connections etc. Repair of filter bottles of vacuum filter by removing the gully plate and replacing it with the given plate. To do and give trial. Removing the gully plate of the vacuum filter tray and repairing it by installing the given plate. Cutting and removing the shells from the lime slaker installed at the lime station and replacing them with new ones from the plates given and giving them trial. Making the melter from a new 8/10 mm plate of Satvik Sulfur Furnace and giving a satisfactory trial by installing steam coil in it. Cutting out the melted coil inside the melters of Satvik Sulfur Furnace and fitting a new one and giving a satisfactory trial by doing hydraulic testing. Removing the gully plate of the condensers of the vacuum filter and installing a new plate, repairing it and giving it a trial. Cutting and removing the gully plate of square melter of film type sulfur furnace and making it with the given 10 mm new plate. Making a new coil by cutting the damaged/weak steam coil installed in the film tin sulfur melter and giving a satisfactory trial by doing hydraulic testing. Removing the condensers of the vacuum filter and installing new ones from 8/10 mm plate. Removing the gully plate of SO2 chamber inside the coolers of Satvik Sulfur Furnace and repairing it with the given plate, giving trial by installing cooling pipe etc. Remodeling and installing SO2 chamber inside the coolers of Satvik Sulfur Furnace and giving it trial. Removal of old corroded line at Sulfur Furnace station and work of tightening joints and bolts by installing new seamless/MS lime along with flanges. After cutting the stool of juice sulphiter shell and replacing it with 8/10 mm plate given to the partially weak part and reassembling the school and giving a satisfactory trial. Replacement of weak shell top and bottom of sulphated juice receiving tank located below juice sulphiter and making connections of related pipe lines. The work of strengthening the overhead tank located in Vyalling House through the given 100 mm channel/angle. Welding of 3 to 4 inch wide ring for strengthening on the vapor pipeline of quad and pan. Removal of weakened roof of quad body by cutting and given 12 mm. Make it from a plate and give it a trial. Cutting out the weak part of semi-condenser/vapor cell/quad flood cell and replacing it with the given 10/12 mm. Installing the plate by bending it and giving satisfactory leak proof trial. 1000 mm distance from body no. 4 to condenser of new/old quad set. Removal of weak vapor pipe of Dhaya and given 10 mm. Fold the key plate and put it in place and give satisfactory leak proof trial. Removing the weak part of the exhaust pipe line going from the superheater to the semi-condenser / vapor shell, replacing it with a new 800 mm pipe line made from the given 8/10 mm plate and giving a satisfactory trial. Cutting out the melted partition plates of the top and bottom headers of the juice heater and replacing them with the given 8/10 mm. Installing the key plate and making arrangements to fit the rubber strip in it and giving satisfactory trial. Installing spots and strengthening the vapor shell/semicondenser/umbrella fitted in the quad body and giving satisfactory trials. Removing the gully tray of the vacuum filter and 8/10 mm. Make a new plate and install it and give a satisfactory trial. Removing the corroded plate form at the top and bottom of the juice heater and making a new one and strengthening the related structure. Removing the corroded plate form at the bottom and top of the quad and making a new one from the given plate and getting the structure related to it stranded. Removing weak intermediate/first vapor/second vapor pipes of quad bodies and B/10 mm. From plate 670 mm. Make a new one and give it a satisfactory trial. Removal of faulty jet heater installed on continuous machines and installation of new one and giving satisfactory trial. Removal and replacement of gutters around crystallizers, pan stations and machines. Hopper 1.5 m x 1.5 m tuff 5 mm. Make a new key plate by riveting it with 10 mm plate and give it a trial by installing connecting rod. Replacement of cover of Conti machines by making new one from 6/8 mm plate. Making the hopper trough from the given plate, strengthening it at an angle and giving satisfactory trials. After checking the spray pipe installed on the molasses tank, replacing the neck pipe and after checking and cleaning the holes of the pipe, put it in place and give it a trial. Remove the plate of mud mixture formed on the vacuum filter and repair it with the new plate provided. Removing the screw conveyor inside the mixer and installing a new one using the new plate and pipe provided and giving it a trial. Removing the gully plate of the filtration tank below the vacuum filter and repairing it by installing the given plate and giving it a trial. Cutting out the trays of the compartments of the clarifier and replacing them with the given 6 mm. Make a new plate and install it and give a satisfactory trial. The trays of the third compartments of the clarifier are cut off to remove rotten buds and the given 6 mm. Make a new plate and install it and give a satisfactory trial. Cutting and removing the weak plate of juice and liquor box of clarifier and installing it with a new plate and making all the connections. Patching the weak shell of the bunning chamber of the film type sulfur furnace with the given plate up to a length of approximately 5 feet from the bottom and giving a satisfactory trial. Fixing the weak and corroded platforms of both the vacuum filters with new replacement plates. Cutting out the weak lump of syrup sulphite and installing a new one from the given MS plate and giving a satisfactory trial. Removing the SO2 chamber inside the last cooler of the film type sulfur furnace and making a new one from the given 10 mm MS plate and making all the connections. Removing the melted clear juice bottle near the clear juice pumps and replacing it with the new plate provided and making all the connections. Removing all the rotten mud scrapers inside the cattle clarifier and fitting the given plate and belt as per the size and giving satisfactory trial. Strengthening the weak part of the central shaft by making a ring from the plate given to the central shaft inside the clarifier. Removing the weak mud-boot plate of each compartment inside the clarifier by coating it and installing the new plate provided. Removing the brass tubes from the second body of Evaporator Set-A and storing them in the store. (Heating surface 540 m square) Removing the calendry of the second body of Evaporator Set A and keeping it in the scrap yard and fitting the new calendria of 540 meter square heating surface and installing all the pipe lines, valves, accessories in place and giving satisfactory trial. Molding and expanding 42X45X2000 mm SS tubes in the second body of Evaporator Set A (540 meter square heating surface) and giving satisfactory hydraulic testing at 5 kg/cm square. Replacement of side plates of A/B Heavys run off tank rectangle with new plates of 06 mm and bottom plate. To give a satisfactory trial by changing the new plate of MM and making connections etc. To give satisfactory trial by replacing the weak side plate/bottom of magma mixture under the Conti machines with a new plate of OB MM. Cutting out the corroded rectangular tank of the maceration tank and fitting it using the given 8/10 mm clean plate and giving a satisfactory trial. The weak side plate/bottom of the pug mill located above the continuous machines and batch type machines has to be replaced with the new plate provided by MM to give a satisfactory trial. To give satisfactory trials by replacing the shoots of continuous machines with the given 5 mm plate. Removal of old conical and square tanks of maceration tank by cutting them. Removing the bottom of the raw juice rectangular tank and making it from the given 8/10 mm new plate and giving a satisfactory trial. Fixing Roddy Melters broken arm and giving a satisfactory trial. Dismantling and fabricating 900 mm bands, erecting them and giving satisfactory trials. Dismantling and fabricating 1100 mm bands, erecting them and giving satisfactory trials. Cutting out the agitator fitted on the vacuum filter and installing a new agitator at the given angle and channel etc. and giving a satisfactory trial. Replacement of the shell and nipple of the secondary burner of Satvik Sulfur Furnace. Cutting and removing the shell plate of the weak foaming chamber of the clarifier and preparing new shell from the given plate 6/8 mm, installing it and giving trial. (a) Dismantling old columns, beam channels etc. (b) Making and installing new columns, beam channels etc. Dismantling of old round, square tanks/vessels in clarification and centrifugal house. Making round, square tanks/vessels from 8/10 mm plate in clarification and centrifugal house. Removing the old collapsed platform and installing a new platform in its place. Installation of blind with manhole of 16 inch/18 inch size. Making a kit for the pump and fitting the pump and motor and giving it a trial up to 20 H.P. Making a bed for the pump, fitting the pump and motor and giving it a trial from 21 HP to 75 HP. Make beds of 02 high flow pumps of 4/6 inch on the molasses tank and give satisfactory trials by connecting the section and delivery line of molasses. Dismantling of old round, square tanks/vessels and the given plate 8/10 mm. Prepare from and give a satisfactory trial. The entire condenser pipe line (4 diameter) going from the boiling house to the boiler. etc.) by cutting them near the old vapor shell and keeping them at a safe place and making headers by installing valves on these 8 etc. 4 lines and taking the delivery line of header 01 etc. pipe to Vayalar feather water tank and strengthening the pipeline of Tax Providing satisfactory leak proof trial. Pan, Injection, Crystallizer and E.T.P. List of works to be done on (Lot-4) Remove the saveall from the pans and replace them with new 6/8 mm plates. Removing the pans gully and damaged weak vapor pipe located on the pan floor using 1100 mm length per meter and installing a new one from the given plate and giving it a trial. Removing the pans gully and damaged weak vapor pipe located in the pan floor using 900 mm length per meter and installing a new one from the given plate and giving it a trial. The old tail pipe of the condensers should be removed and replaced with stainless steel/M.S. Fit the tail pipe as per instructions (10/12 inch size). Making suction pipes of injection and cooling tower spray pumps and making and installing mesh as per instructions. Removal of melted shell plate of pans and replacing it with 10/12 mm M.S. Installing the plate and giving trial. Removing the steam coil of the molasses tank/molasses condenser and installing a new coil. Removing the umbrella fitted on the pan and replacing the given 6/8 mm. Make a new plate and give it a trial. Cutting out the neck/circular part of the pan and replacing it with the given 10/12 mm. of M.S. Installing the plate by bending it, welding it inside and outside and giving it a trial by filling it with water. Strengthening the pans shell and roof with new angles/channels provided by removing old angles/channels. Repairing the suction pipes of injection spray pumps with mesh. The neck of the dome at the upper part of the pan and the weak shell and bottom cone parts were cut off and replaced with 10/12 mm. By folding it from MS plate and installing it After doing satisfactory welding and giving trial. Cutting and removing the street spout of Pan Ambela and erecting it by installing a new channel and angle. Patching the old and worn out plates at various places with new plates given in place of them. Straightening old worn out plates of different sizes. Making stairs of different sizes and placing them at designated places. Dismantling old columns, beam channels etc. and installing new ones. Dismantling of old round and square tanks/vessels. Making round, square tanks/vessels from 8/10 mm plate. Removing the old collapsed platform and installing a new platform in its place. Pan floor manhole installation with 20 / 22 blind Replacement of weak cutta lines, condensed lines, syrup lines and molasses lines. Remove the old NR V (12 inches) of injection pump no. 2 and 4 and replace it with 10 mm as per instructions. Making a new NRV from the plate and installing it. C. Cutting out the broken arm of Mono Vertical Crystallizer and giving satisfactory trials by making the given arm. Leak proofing the leakage water coil of C Mono Vertical Crystallizer and giving satisfactory trials at hydraulic pressure of 50 PSI. 790 mm through injection header located in pan floor. Removing the neck and damaged part of length 15 m and fitting a new one from the given plate and giving a satisfactory trial by fitting the respective removed connections/nipples. To remove the old calendria of 45 ton Samata pan installed in the Mill Committee by ones own resources and keep it in the designated place/scrap yard and to install the new 45 ton calendria available in the can yard/store of the Mill Committee in place of the removed calendria and all the Installing pipelines, valves and making changes in staging as per requirement and giving satisfactory trials. Welding the leakage bottom saucer of Pan No. 02 from inside and outside and making satisfactory leakage proof welding by installing ribs etc. Removing the brass/SS tubes of the pan and storing them in the store. Expand the new brass/SS tubes of the pan given by the mill committee by placing them in calandria and give a satisfactory trial by conducting calandria hydraulic testing at a pressure of 04 kg per cm square. 01 number of old Molasses tank installed at PAN station, measuring length 3 meter, width 2 meter and height 2 meter, to be taxed by straightening the old plates taken out from the pan and quad pans and making them as per the above size with new plates and To give a satisfactory trial. Cut the weak bottom shoe of the pan and replace it with a new bottom shoe provided or fabricated from the given 16 mm plate and give a satisfactory trial by installing all the pipe line connections etc. and Katta discharge valve. The corroded side plates of the Molassis station located at Pan Station are being modified to new plates and the corroded bottom angle is being replaced with the new plates provided and giving a satisfactory trial. Repairing broken and damaged systems of crystallizers. After removing the worm wheel of the crystallizer, making a bed and installing the new planetary gear box provided and giving a satisfactory trial. Replace the worn out side plate and bottom half of the crystallizer by replacing it with a new one from the provided plate and give it a trial. Cutting out the damaged shafts and arms of crystallizers and preparing them with new pipes and angle channels and giving satisfactory trials. Strengthening the weak side covers and weak cells of the crystallizer by providing support through the channels and angles provided. Pan floor established syrup/melt/A light/A heavy/B heavy/C light/C. Removing the melted plate of heavy tanks by cutting it and installing the given plate by making it from 6/8 mm plate. Removing the melted and damaged part of the side plate (front and back) of the vacuum crystallizer located on the pan floor and installing a new one from the given plate 12/16 mm and giving a satisfactory trial by welding the respective disconnected connections and nipples. Removing the melted and damaged part of the shell of the vacuum crystallizer located on the pan floor and installing a new one from the given plate 10/12 mm and giving a satisfactory trial by welding the respective disconnected connections and nipples. Removing the old cutover valve on the pan and replacing it with a pneumatic cutover valve and giving a satisfactory trial. Removing the old discharge valve on the pan and replacing it with a pneumatic discharge valve and giving a satisfactory trial. Replacing the weak pipe line of ETP with the given pipe line and giving satisfactory trial. Providing satisfactory trials by laying the pipeline from ETPs lagoon to UGR. Replacement of weak connections of ETP pumps. Replacement of air line nipple and pipe line of read diffuser in aeration tank. Dismantling and fabricating 900 mm bands, erecting them and giving satisfactory trials. Dismantling and fabricating 1100 mm bands, erecting them and giving satisfactory trials.
Basic Detail
Tender No FABRICATION WORK
Bidding Type Tender
Location
City sarsawa
State Uttar Pradesh
Key Dates
Publish Date 21 May 2024
Submission Date 10 Jun 2024
Open Date 11 Jun 2024
Finance
Tender Value 40 Lakhs
Tender Fee 250
EMD 1 Lakhs
Exemption Available
Document List
62089f44-740b-477e-bf22-7f726f2e90b6.html
BOQ_1597941.xls
Tendernotice_1.pdf
Tendernotice_2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

May 21, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Jun 10, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jun 11, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

62089f44-740b-477e-bf22-7f726f2e90b6.html

xls

BOQ_1597941.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender