Procurement Of Cng Booster Compressor Procurement Of Cng Booster Compressor (2 Years Arc) , 400 Scmhelectric Motor Driven Cng Booster Compressors , Design,Engineering,Manufacturing,Supply (Including Packaging And Forwarding, Insurance, Handling, Loading And Unloading At Port And Delivery & Unloading Atclients Store / Site Of Skid Mounted 22 Kw Electric Motor Driven Hydraulic Cng Compressor Package Of Average 400 Sm3 / Hr Capacity At Suction Pressure Of 30 Kg/Cm2 And Discharge Pressure 255 Kg/Cm2 (Variable Suction Pressure Range 30 To 200 Kg/Cm2) The Package Shall Be Inclusive Of: A)String Test Of Complete Compressor Package With Air/Nitrogen Along With Electric Motor And Accessories At Packagers Factory. B) Special Tools & Tackles (List And Price Of Each Tools And Tackles To Be Furnished By The Bidder Separately In Price Bid) C) Design,Engineering, Manufacturing,Supply (Including Packaging And Forwarding, Insurance, Handling And Unloading At Clients Store /Siteof Air Compressor Of Capacity Approx 1.5 Kw, Discharge Pressure Approx 7 Kg/Cm2g , Min 100 Water Litre Air Receiver And Air Dryer Along With All Accessories And Auxiliaries. Location-Wise (Tentative) Quantities: Cachar, Hailakandi & Karimganj Ga- 5 Nos. Kamrup & Kamrup Metropolitan Ga- 11 Nos. Stores/Sites: Silchar And Guwahati , Unit Inland Transportation Upto Delivery Location And Other Costs Incidental To Delivery Of Goods , Installation, Commissioning, Testing (Item No 2.0 Of Mr) , Installation, Commissioning & Field Performance Test Of Compressor Package Including Air Compressor System At Site (Item No 2.1 Of Mr) , Totalamount For Supply,Freight,Installation,Testing & Commissioning (Inclusive Of Taxes) Based On Quoted Price , Services For Operations(Item No 3.0 Of Mr) , Operation Charges For 1St Year I.E. During Warranty Period For 2 Nos Shifts(Each Shift Of 8Hrs) For Cachar, Hailakandi & Karimganj Ga (5 Machines X 12 Months X 2 Shifts = 120 Machine Shift Months) Note: The Quoted Rate For One Machine Shift Month Must Be Equal To Or More Than 0.50% Of Rateof Item No. 1.1 Quoted By The Bidder. , Operation Charges For 2Nd Year For 2Nos Shift (Each Shift Of 8Hrs) For Cachar, Hailakandi & Karimganj Ga (5 Machines X 12 Months X 2 Shifts = 120 Machine Shift Months) Note: The Quoted Rate For One Machine Shift Month Must Be Equal To Or More Than 0.55% Of Rateof Item No. 1.1 Quoted By The Bidder. , Operation Charges For 3Rd Year For 2Nos Shift (Each Shift Of 8Hrs) For Cachar, Hailakandi & Karimganj Ga (5 Machines X 12 Months X 2 Shifts = 120 Machine Shift Months) Note: The Quoted Rate For One Machine Shift Month Must Be Equal To Or More Than 0.61% Of Rateof Item No. 1.1 Quoted By The Bidder. , Operation Charges For 4Thyear For 2Nos Shift (Each Shift Of 8Hrs)For Cachar, Hailakandi & Karimganj Ga (5 Machines X 12 Months X 2 Shifts = 120 Machine Shift Months) Note: The Quoted Rate For One Machine Shift Month Must Be Equal To Or More Than 0.67% Of Rateof Item No. 1.1 Quoted By The Bidder. , Operation Charges For 1St Year I.E. During Warranty Period For 2 Nos Shifts(Each Shift Of 8Hrs) For Kamrup & Kamrup Metropolitan Ga (11 Machines X 12 Months X 2 Shifts = 264 Machine Shift Months) Note: The Quoted Rate For One Machine Shift Month Must Be Equal To Or More Than 0.50% Of Rateof Item No. 1.1 Quoted By The Bidder. , Operation Charges For 2Nd Year For 2 Nos Shift (Each Shift Of 8Hrs)For Kamrup & Kamrup Metropolitan Ga (11 Machines X 12 Months X 2 Shifts = 264 Machine Shift Months) Note: The Quoted Rate For One Machine Shift Month Must Be Equal To Or More Than 0.55% Of Rateof Item No. 1.1 Quoted By The Bidder. , Operation Charges For 3Rd Year For 2Nos Shift (Each Shift Of 8Hrs) For Kamrup & Kamrup Metropolitan Ga (11 Machines X 12 Months X 2 Shifts = 264 Machine Shift Months) Note: The Quoted Rate For One Machine Shift Month Must Be Equal To Or More Than 0.61% Of Rateof Item No. 1.1 Quoted By The Bidder. , Operation Charges For 4Thyear For 2Nos Shift (Each Shift Of 8Hrs) For Kamrup & Kamrup Metropolitan Ga (11 Machines X 12 Months Xshifts = 264 Machine Shift Months) Note: The Quoted Rate For One Machine Shift Month Must Be Equal To Or More Than 0.67% Of Rateof Item No. 1.1 Quoted By The Bidder. , Totalamount For Operations (Inclusive Of Taxes) Based On Quoted Price , Items For Comprehensive Maintenance (Item No 4 Of Mr) , Annual Comprehensive Maintenance Charges For 1St Year During Warrantee Period (5Packages X 12Months = 60Machine-Month)But Excluding Maintenance Covered Under Warranty During Warrantee Period For Cachar, Hailakandi & Karimganj Ga Note: The Quoted Rate For One Machine Month Must Be Equal To Or More Than 1% Of Rateof Item No. 1.1 Quoted By The Bidder. , Annual Comprehensive Maintenance Charges For 2Ndyear (5 Machines X 12Months = 60) For Cachar, Hailakandi & Karimganj Ga Note: The Quoted Rate For One Machine Month Must Be Equal To Or More Than 1.10% Of Rateof Item No. 1.1 Quoted By The Bidder. , Annual Comprehensive Maintenance Charges For 3Rdyear (5 Machines X 12Months = 60) For Cachar, Hailakandi & Karimganj Ga Note: The Quoted Rate For One Machine Month Must Be Equal To Or More Than 1.21% Of Rateof Item No. 1.1 Quoted By The Bidder. , Annual Comprehensive Maintenance Charges For 4Thyear (5 Machines X 12Months = 60) For Cachar, Hailakandi & Karimganj Ga Note: The Quoted Rate For One Machine Month Must Be Equal To Or More Than 1.33% Of Rateof Item No. 1.1 Quoted By The Bidder. , Annual Comprehensive Maintenance Charges For 1St Year During Warrantee Period (11 Machines X 12 Months = 132 ) But Excluding Maintenance Covered Under Warranty During Warrantee Period For Cachar, Hailakandi & Karimganj Ga Note: The Quoted Rate For One Machine Month Must Be Equal To Or More Than 1% Of Rateof Item No. 1.1 Quoted By The Bidder. , Annual Comprehensive Maintenance Charges For 2Ndyear (11 Machines X 12Months = 132) For Cachar, Hailakandi & Karimganj Ga Note: The Quoted Rate For One Machine Month Must Be Equal To Or More Than 1.10% Of Rateof Item No. 1.1 Quoted By The Bidder. , Annual Comprehensive Maintenance Charges For 3Rdyear (11 Machines X 12Months = 132) For Cachar, Hailakandi & Karimganj Ga Note: The Quoted Rate For One Machine Month Must Be Equal To Or More Than 1.21% Of Rateof Item No. 1.1 Quoted By The Bidder. , Annual Comprehensive Maintenance Charges For 4Thyear (11 Machines X 12Months = 132) For Cachar, Hailakandi & Karimganj Ga Note: The Quoted Rate For One Machine Month Must Be Equal To Or More Than1.33% Of Rateof Item No. 1.1 Quoted By The Bidder. , Totalamount For Comprehensive Maintenance (Inclusive Of Taxes) Based On Quoted Price , Note: 1) Refer Notes To Mr 2) Total Price For Complete Scope Of Work Including Gst Is Given Below