Shifting Of Electrical Equipment With Associated Material From Rsu Alipur To T.E. Bldg., Rohini, Sec-3, Delhi-Dismantling Of 2 Nos. Dg Set62.5 Kva Dea Set Complete With Batteries, Exhaust Pipes, Cables, Panel ( Inside Canopy ) From Rsu Alipur I / C Dismantling Of All Cable, Earthing & Exhaust Pipe Connection Etc.Complete As Reqd. 2 Dismantling Of 3X7.5 Tr Ductable Ac Units From Rsu Alipur I / C Dismantling Ofindoor & Outdoor Units, Piping, Cable Tray, Drain Pipe And Cable, Connection Etc.Complete As Reqd. 3 Dismantling Of One Avr From Rsu Alipur I / C Dismantling Of All Type Cables, Earthing Connection Etc. Complete As Reqd. 4 Dismantling Of The Following Material From Rsu Alipur I / C Dismantling Of All Types Of Cables / Conduits, Earthing Connection Etc. Complete As Reqd.: Capacitor Panel, Avr By Pass Panel, L T Panel, Ac Panel, Fire Panel, Wall Fans, Fittings, Phase Reversal, Change Over Switches, Distribution Boards, Cable Trays, Cables, Celing / Wall Fans, Exhaust Fans, And Fire Detectors Etc Complete As Required. 5 Loading & Unloading Of Dg Sets With Associate Material I / C Transportation From Rsu Alipur To T.E. Bldg. Badli By Heavy Labour, Chain Pulley / Hydra Etc As Reqd. 6 Loading & Unloading Of3x7.5 Tr Ductable Ac Units I / C Indoor Units & Outdoor Units, Piping, Cable Tray And Cable, Etc. I / C Transportation From Rsu Alipur To T.E. Bldg. Rohini, Sec-3, By Heavy Labour, , Chain Pulley / Hydra Etc As Reqd. 7 Loading & Unloadingof One Avr With Associate Material Etc.Complete As Reqd. I / C Transportation From Rsu Alipur To T.E. Bldg. Rohini, Sec-3, By Heavy Labour, Chain Pulley / Hydra Etc As Reqd. 8 Shifting Of The Following Material From Rsu Alipur I / C Loading Of All Types Of Cables / Conduits, Earthing Connections, Capacitor Panel, Avr By Pass Panel, L T Panel, Ac Panel, Fire Panel, Wall Fans, Fittings, Phase Reversal, Change Over Switches, Distribution Boards, Cable Trays, Cables, Celing / Wall Fans, Exhaust Fans, And Fire Detectors Etc Unloading At Badli Bldg., And Location As Per The Directions Of Engineer-In-Charge.Note: 1 ) The Agency Has To Prepare A Detailed Inventory Of All Items To Be Dismantled I / C Quantity Before Dismanling And Shifting To Other Site And Submit It To The Engineer-In-Charge For Taking Gate Pass. 2 ) The Agency Is Fully Responsible For Any Misplaced / Short Material Receipt From Rsu Site And Suitable Recovery Will Be Made For Any Such Item. 3 ) The Cables Will Be Rolled Into Loops And Approximate Length Should Be Mentioned In Inventory. 4 ) The Dismantled Items Alongwith Inventory Will Be Handed Over To Engineer-In-Charge, After Shifting The Material At Site.