| 1 | The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km) |
| 2 | 25 KVA Distribution Transformer |
| 3 | 63 KVA Distribution Transformer |
| 4 | 250 KVA Distribution Transformer |
| 5 | PCC Pole 8.5 Meter |
| 6 | LT XLPE Cable 3.5x150 Sqmm |
| 7 | ACSR Weasel Conductor |
| 8 | LT ABC 3x95+1x70+1x16 Sqmm |
| 9 | LT XLPE CABLE AL. 1x240 Sqmm |
| 10 | HT XLPE CABLE 3x70 Sqmm |
| 11 | 11 KV FUSE SET |
| 12 | 3Ph Distribution Box |
| 13 | LINE MATERIAL (Insulator, Disc, X-Arm, ANGLE, CHANNEL ETC.) |
| 14 | Complete work of installing the electrical material received from the store center at the site. |
| 15 | Complete work of Laying/Installing ACSR WEASEL CONDUCTOR on the Established electric poles installed as per RESPO norms. |
| 16 | Complete work of LT ABC 3x95+1x70+1x16 Sqmm on the Established electric poles installed as per RESPO norms. |
| 17 | Work of Fixing/Installing Single Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of length of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disc insulator, angle channel etc. and decentralized material will be payable by the Contractor/Firm. |
| 18 | Work of Fixing/Installing Double Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of length of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disc insulator, angle channel etc. and decentralized material will be payable by the Contractor/Firm. |
| 19 | Complete work of Installing and Commissioning 25 KVA Distribution Transformer on Established Double pole as per RESPO standards. |
| 20 | Complete work of Installing and Commissioning 63 KVA Distribution Transformer on Established Double pole as per RESPO standards. |
| 21 | Painting work of MOBILE TROLLY (250 KVA DT TF) , 1 Coat RED OXIDE Paint & 2 Coat Enamel Paint and decentralized material (Paint/Colour) will be payable by the Contractor/Firm. |
| 22 | Complete work of installing 250 KVA distribution transformer on the trolley, completing the connections and other necessary work, after Installing DT TF on the trolly and taking the mobile trolley to 33/11 KV sub-station was completed and decentralized material will be payable by the Contractor/Firm. |
| 23 | Complete work of Installing and Commissioning LT 3P Distribution Boxas per RESPO standards. |
| 24 | Complete work of Installing and Commissioning 11 KV Fuse Set as per RESPO standards. |
| 25 | Complete work of installation of Stay Set Complete on Established Double pole & Single Pole of Line As per the RESPO standards. |
| 26 | Complete work of Pole concreting on Established Double Pole / Single Pole as per RESPO standards. In which cement, sand and other necessary decentralized material will be payable by the Contractor/Firm. |
| 27 | Complete work of Earthing completing with earthing road of Established Pole as per RESPO standards. In which decentralized material will be payable by the Contractor/Firm. |
| 28 | Supply of NUT & BOLT as per RESPO standards |
| 29 | Supply of DEAD & CLAMP as per RESPO standards |
| 30 | Supply of SUSPENSION CLAMP as per RESPO standards |
| 31 | Supply of AL. CRIMPING LUGS as per RESPO standards |
| 32 | Supply of MOBILE TROLLY for 250 KVA Distribution Transformer |
| 33 | SUNDRIES ITEMS |