|
| 1 | Detail of Work |
| 2 | Safely carrage of ST Pole 13 Mtr Long from ESC SRE to site of work including loading and unloading at both ends. |
| 3 | Safely carrage of ST Pole 11 Mtr Long from ESC SRE to site of work including loading and unloading at both ends. |
| 4 | Safely carrage of PCC Pole 8.5 Mtr Long from ESC SRE to site of work including loading and unloading at both ends. |
| 5 | Safely carriage of Line Material (Except PCC/ST Pole/ conductor)ESC SRE to site of works through privet vehicle including loading and unloading at both ends. (Distance 0 to 25 K.M.) |
| 6 | Erection of single support on PCC/ST poles up to 8.5/11/13 MtrLong with complete fitting of all accessories of11 KV/LT Line as per RESPO specification |
| 7 | Safely cartage ofAB Cable (3x120+x1x95+1x16) /3x95 from ESC, SRE to the site of work including loading unloading at both ends. (Dist. up to 25 KM.) |
| 8 | Laying Lifting stringing & Sagging of ABC Cable size (3x120+x1x95+1x16)/3x95 sq.mm. including fixing of all type clamps and connector of all accessories. |
| 9 | Safely carriage of ACSR Rabbit conductor from ESC SRE to site of work including loading and unloading at both ends. |
| 10 | Earthing of pole by Earthing rod. |
| 11 | Laying, lifting, stringing, sagging jump ring & binding of ACSR weasel conductor for HT/LT Line. |
| 12 | Safe cartage of 250 KVA T/F from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 25 km.) |
| 13 | Constriction of plinth for installation of 250 kv T/F of size 1.5x1.5x1.5 mtr made of 9”inch thick wall in all four sides with 6”inch thick RCC top duly filled with sand and plastered 12mm thick in ratio 1:4 with cement and sand on outer surface of brick wall. |
| 14 | Safe installation of 250 KVA T/F on the Plinth with complete fittings including making connections and commissioning. |
| 15 | Wire mesh fencing of 250 KVA T/F size 2.5x2.5x2.5 mt. grouting making frame of MS angle 45x45x6 mm and fixing four no. MS strip size 25x6 mm at equal distance in between the frame and fixing squre mesh 50 mm square in each frame the fencing should cover all side of T/F with providing 1 No. door size 6\"x3\" with sitakni & Dandala. |
| 16 | Pipe/Water Level Earthing of 250 KVA T/F (1 No body & 1 No. neutral earthing) by boring of 60 Ft deep & fixing of 60 ft. G.I pipe 11/2\" Dia (Jindal Class B) and connecting with G.I. Strip of size 40x5 mm and G.I wire at bottom of G.I pipe to the T/F providing of required charcoal & salt in the pipe |
| 17 | Grouting of ST Pole |
| 18 | Grouting of stay rods by digging of pits in block 600x600x300 MM & cementconcreting in ratio 1:4:8 with cement, sand and brick ballast and nozzling of stay wire 7/10 SWG and fitting the same on the pole including fixing of stay insulator in stay wire. |
| 19 | Grouting of Stay |
| 20 | Safely Removal of iron scrap and carriage from Site of work to ESC SRE including loading and unloading at both ends. |
| 21 | Safely dismanteling and carriage of old & damage 11 KV Polymeric Disc insulator from site of wor to ESC Sreincluding loading and unloading at both ends. |
| 22 | Safely Carriage of XLPE Cable form ESC SRE to site of work including loading and unloading at both ends. |
| 23 | Laying of XLPE Cable 3x185 sq.mm. |
| 24 | Making and fixing of 11 KV Jointing Kit 3x185 sq.mmO/D Side |
| 25 | Providing of F-Clamp |
| 26 | Providing of Nut & Bolts |
| 27 | Providing of I-Hook |
| 28 | Providing of Suspension Clamp |
| 29 | Providing of PRC Clamp |
| 30 | Providing of Lug |
| 31 | Providing of all type clamp with nut & bolt . |
| 32 | Laying of LT/XLPE cable 1*240 sq.mm/3.5*70 sq.mm as per respo specification. |