Tender for ccp-1&2 capital s/d takeover piping jobs 000143111 630 10 10 fab of pipe arc welding ms - ms sch 40 575 ind email : kaushal.patel1@amns.in contact : name : kaushal patel item details : ccp # 1 capital s/d takeover piping job ccp1<(>&<)>2 water tunnel is having cluster of pipelines (spray water + spray air + machine & mould cooling etc) lying from utility dept to caster through water tunnel. ageing of that pipe more than 29 years and now it needs to be changed as per requirement & based on opportunity in capital sd in month of may 24. condition of caster 1 & 2 take over point is very critical & also having leakages at few points. plan to change the same in capital sd in month of may 24. vendors scope : (1) fabrication of pipe as per requirement / based on actual measurement at water tunnel. (2) pipe & related fitting (elbow + tee) to shift from central store to water tunnel with help of crane & some extent manually up to water tunnel safely. lot off manual rigging involved. heat & dust as well as chance for water also at tunnel. need to dry first. (3) certified tools - welding set + cutting set + tools + tackles + grinding wheel etc will be in vendors scope. (4) welding rod in vendors scope. considered e-7018 electrodes for the fabrication. (5) dp test to be done as per site requirement after welding. (6) painting/ protective coating to be done if required. (7) pipe support to be fabricated & erected as per requirement. (8) inspection will be done by am/ns base on dimension & dp test reports. (9) competent supervisor all the time during job execution to monitor quality of work and safety & behaviour of associates. scope of work- am / ns india: - 1. supervision and job certification for executed jobs is in am/ns scope. 2. provision of drawing & design / sketch is in am/ns scope as per plant requirement considering critical. 3. provision of all spares including paint for fabrication job execution is in am/ns scope. 4. provision of all structural materials-angle, channel, beam, plates, pipes, elbow & fittings etc. is in am/ns scope. 5. co-ordination for shutdown and work permit is in am/ns scope. 6. drinking water, power supply, lighting facilities, working platform, etc. for workmen at plant site is in am/ns scope. 7. sand blasting in am/ns scope. (if required) 8. all welding electrodes which do not come under aws specification (special electrode) are in am/ns scope. 9. hydraulic power pack, jack are in am/ns scope (if required). 10. all required ndt items will be provided by am/ns scope. important note: use all the ppe required at smp1 (frp helmet, frp jacket, safety shoe, page 2 of 13 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat-hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109835 date 06.04.2024 submission date 14.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details safety goggles, safety hand gloves and nose mask) safety is vendor’s responsibility. amnsi will explain hazards in the job during tbt / hirac discussion. vendor has to monitor behaviour of associates periodically from hse point of view and ensure required correction. consumables will be in vendors scope except paint/ protective coating. shift the removed equipment / scrap to designated repair area / scrap area. ensure proper housekeeping near the working area after job completion. invoice will be certified after proper housekeeping only. movement of manpower / associates at our hazira site. movement of manpower / associates at our hazira site. 1. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. 2. vendor must ensure the availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. other terms: associate has to undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. specific penalty for non-performance by vendor and must be cardinally measured. a. non-conformity of work. b. penalty will be imposed in case of noncompliance to hse norms. c. penalty will be applicable due to poor workmanship, safety violation, damage to am/ns property from contractor side. d. as per management directive, transport / movement of associates to & from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. item note : 2 2000143111 640 20 10 dismantling of pipe ms sch 40 895 inm email : kaushal.patel1@amns.in contact : name : kaushal patel item details : ccp # 1 capital s/d takeover piping job. ccp1<(>&<)>2 water tunnel is having cluster of pipelines (spray water + spray air + machine & mould cooling etc) lying from utility dept to caster through water tunnel. ageing of that pipe more than 29 years and now it needs to be changed as per requirement & based on opportunity in capital sd in month of may 24. condition of caster 1 & 2 take over point is very critical & also having leakages at few points. plan to change the same in capital sd in month of may 24. vendors scope : (1) fabrication of pipe as per requirement / based on actual measurement at water tunnel. (2) pipe & related fitting (elbow + tee) to shift from central store to water tunnel with help of crane & some extent manually up to water tunnel safely. lot off manual rigging involved. heat & dust as well as chance for water also at tunnel. need to dry first. (3) certified tools - welding set + cutting set + tools + tackles + grinding wheel etc will be in vendors scope. (4) welding rod in vendors scope. considered e-7018 electrodes for the fabrication. page 3 of 13 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat-hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109835 date 06.04.2024 submission date 14.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details (5) dp test to be done as per site requirement after welding. (6) painting/ protective coating to be done if required. (7) pipe support to be fabricated & erected as per requirement. (8) inspection will be done by am/ns base on dimension & dp test reports. (9) competent supervisor all the time during job execution to monitor quality of work and safety & behaviour of associates. scope of work- am / ns india: - 1. supervision and job certification for executed jobs is in am/ns scope. 2. provision of drawing & design / sketch is in am/ns scope as per plant requirement considering critical. 3. provision of all spares including paint for fabrication job execution is in am/ns scope. 4. provision of all structural materials-angle, channel, beam, plates, pipes, elbow & fittings etc. is in am/ns scope. 5. co-ordination for shutdown and work permit is in am/ns scope. 6. drinking water, power supply, lighting facilities, working platform, etc. for workmen at plant site is in am/ns scope. 7. sand blasting in am/ns scope. (if required) 8. all welding electrodes which do not come under aws specification (special electrode) are in am/ns scope. 9. hydraulic power pack, jack are in am/ns scope (if required). 10. all required ndt items will be provided by am/ns scope. important note: use all the ppe required at smp1 (frp helmet, frp jacket, safety shoe, safety goggles, safety hand gloves and nose mask) safety is vendor’s responsibility. amnsi will explain hazards in the job during tbt / hirac discussion. vendor has to monitor behaviour of associates periodically from hse point of view and ensure required correction. consumables will be in vendors scope except paint/ protective coating. shift the removed equipment / scrap to designated repair area / scrap area. ensure proper housekeeping near the working area after job completion. invoice will be certified after proper housekeeping only. movement of manpower / associates at our hazira site. movement of manpower / associates at our hazira site. 1. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. 2. vendor must ensure the availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. other terms: associate has to undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. specific penalty for non-performance by vendor and must be cardinally measured. a. non-conformity of work. page 4 of 13 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat-hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109835 date 06.04.2024 submission date 14.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details b. penalty will be imposed in case of noncompliance to hse norms. c. penalty will be applicable due to poor workmanship, safety violation, damage to am/ns property from contractor side. d. as per management directive, transport / movement of associates to & from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. item note : 3 2000143111 650 30 10 erection of pipe ms sch 40 895 inm email : kaushal.patel1@amns.in contact : name : kaushal patel item details : ccp # 1 capital s/d takeover piping job ccp1<(>&<)>2 water tunnel is having cluster of pipelines (spray water + spray air + machine & mould cooling etc) lying from utility dept to caster through water tunnel. ageing of that pipe more than 29 years and now it needs to be changed as per requirement & based on opportunity in capital sd in month of may 24. condition of caster 1 & 2 take over point is very critical & also having leakages at few points. plan to change the same in capital sd in month of may 24. vendors scope : (1) fabrication of pipe as per requirement / based on actual measurement at water tunnel. (2) pipe & related fitting (elbow + tee) to shift from central store to water tunnel with help of crane & some extent manually up to water tunnel safely. lot off manual rigging involved. heat & dust as well as chance for water also at tunnel. need to dry first. (3) certified tools - welding set + cutting set + tools + tackles + grinding wheel etc will be in vendors scope. (4) welding rod in vendors scope. considered e-7018 electrodes for the fabrication. (5) dp test to be done as per site requirement after welding. (6) painting/ protective coating to be done if required. (7) pipe support to be fabricated & erected as per requirement. (8) inspection will be done by am/ns base on dimension & dp test reports. (9) competent supervisor all the time during job execution to monitor quality of work and safety & behaviour of associates. scope of work- am / ns india: - 1. supervision and job certification for executed jobs is in am/ns scope. 2. provision of drawing & design / sketch is in am/ns scope as per plant requirement considering critical. 3. provision of all spares including paint for fabrication job execution is in am/ns scope. 4. provision of all structural materials-angle, channel, beam, plates, pipes, elbow & fittings etc. is in am/ns scope. 5. co-ordination for shutdown and work permit is in am/ns scope. 6. drinking water, power supply, lighting facilities, working platform, etc. for workmen at plant site is in am/ns scope. 7. sand blasting in am/ns scope. (if required) 8. all welding electrodes which do not come under aws specification (special electrode) are in am/ns scope. 9. hydraulic power pack, jack are in am/ns scope (if required). 10. all required ndt items will be provided by am/ns scope. important note: use all the ppe required at smp1 (frp helmet, frp jacket, safety shoe, page 5 of 13 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat-hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109835 date 06.04.2024 submission date 14.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details safety goggles, safety hand gloves and nose mask) safety is vendor’s responsibility. amnsi will explain hazards in the job during tbt / hirac discussion. vendor has to monitor behaviour of associates periodically from hse point of view and ensure required correction. consumables will be in vendors scope except paint/ protective coating. shift the removed equipment / scrap to designated repair area / scrap area. ensure proper housekeeping near the working area after job completion. invoice will be certified after proper housekeeping only. movement of manpower / associates at our hazira site. movement of manpower / associates at our hazira site. 1. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. 2. vendor must ensure the availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. other terms: associate has to undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. specific penalty for non-performance by vendor and must be cardinally measured. a. non-conformity of work. b. penalty will be imposed in case of noncompliance to hse norms. c. penalty will be applicable due to poor workmanship, safety violation, damage to am/ns property from contractor side. d. as per management directive, transport / movement of associates to & from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. item note : 4 2000143111 660 40 10 fabrication & erection of ms steel 10 to email : kaushal.patel1@amns.in contact : name : kaushal patel item details : ccp#1 cap sd-support fab-erec of structu ccp1<(>&<)>2 water tunnel is having cluster of pipelines (spray water + spray air + machine & mould cooling etc) lying from utility dept to caster through water tunnel. ageing of that pipe more than 29 years and now it needs to be changed as per requirement & based on opportunity in capital sd in month of may 24. condition of caster 1 & 2 take over point is very critical & also having leakages at few points. plan to change the same in capital sd in month of may 24. vendors scope : (1) fabrication of pipe as per requirement / based on actual measurement at water tunnel. (2) pipe & related fitting (elbow + tee) to shift from central store to water tunnel with help of crane & some extent manually up to water tunnel safely. (3) certified tools - welding set + cutting set + tools + tackles + grinding wheel etc will be in vendors scope. (4) welding rod in vendors scope. considered e-7018 electrodes for the fabrication. (5) dp test to be done as per site requirement after welding. page 6 of 13 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat-hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109835 date 06.04.2024 submission date 14.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details (6) painting/ protective coating to be done if required. (7) pipe support to be fabricated & erected as per requirement. (8) inspection will be done by am/ns base on dimension & dp test reports. (9) competent supervisor all the time during job execution to monitor quality of work and safety & behaviour of associates. scope of work- am / ns india: - 1. supervision and job certification for executed jobs is in am/ns scope. 2. provision of drawing & design / sketch is in am/ns scope as per plant requirement considering critical. 3. provision of all spares including paint for fabrication job execution is in am/ns scope. 4. provision of all structural materials-angle, channel, beam, plates, pipes, elbow & fittings etc. is in am/ns scope. 5. co-ordination for shutdown and work permit is in am/ns scope. 6. drinking water, power supply, lighting facilities, working platform, etc. for workmen at plant site is in am/ns scope. 7. sand blasting in am/ns scope. (if required) 8. all welding electrodes which do not come under aws specification (special electrode) are in am/ns scope. 9. hydraulic power pack, jack are in am/ns scope (if required). 10. all required ndt items will be provided by am/ns scope. important note: use all the ppe required at smp1 (frp helmet, frp jacket, safety shoe, safety goggles, safety hand gloves and nose mask) safety is vendor’s responsibility. amnsi will explain hazards in the job during tbt / hirac discussion. vendor has to monitor behaviour of associates periodically from hse point of view and ensure required correction. consumables will be in vendors scope except paint/ protective coating. shift the removed equipment / scrap to designated repair area / scrap area. ensure proper housekeeping near the working area after job completion. invoice will be certified after proper housekeeping only. movement of manpower / associates at our hazira site. movement of manpower / associates at our hazira site. 1. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. 2. vendor must ensure the availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. other terms: associate has to undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. specific penalty for non-performance by vendor and must be cardinally measured. a. non-conformity of work. b. penalty will be imposed in case of noncompliance to hse norms. page 7 of 13 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat-hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109835 date 06.04.2024 submission date 14.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details c. penalty will be applicable due to poor workmanship, safety violation, damage to am/ns property from contractor side. d. as per management directive, transport / movement of associates to & from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. item note : 5 2000143111 670 50 10 fab of pipe arc welding ms - ms sch 40 960 ind email : kaushal.patel1@amns.in contact : name : kaushal patel item details : ccp # 2 capital s/d takeover piping job ccp1<(>&<)>2 water tunnel is having cluster of pipelines (spray water + spray air + machine & mould cooling etc) lying from utility dept to caster through water tunnel. ageing of that pipe more than 29 years and now it needs to be changed as per requirement & based on opportunity in capital sd in month of may 24. condition of caster 1 & 2 take over point is very critical & also having leakages at few points. plan to change the same in capital sd in month of may 24. vendors scope : (1) fabrication of pipe as per requirement / based on actual measurement at water tunnel. (2) pipe & related fitting (elbow + tee) to shift from central store to water tunnel with help of crane & some extent manually up to water tunnel safely. lot off manual rigging involved. heat & dust as well as chance for water also at tunnel. need to dry first. (3) certified tools - welding set + cutting set + tools + tackles + grinding wheel etc will be in vendors scope. (4) welding rod in vendors scope. considered e-7018 electrodes for the fabrication. (5) dp test to be done as per site requirement after welding. (6) painting/ protective coating to be done if required. (7) pipe support to be fabricated & erected as per requirement. (8) inspection will be done by am/ns base on dimension & dp test reports. (9) competent supervisor all the time during job execution to monitor quality of work and safety & behaviour of associates. scope of work- am / ns india: - 1. supervision and job certification for executed jobs is in am/ns scope. 2. provision of drawing & design / sketch is in am/ns scope as per plant requirement considering critical. 3. provision of all spares including paint for fabrication job execution is in am/ns scope. 4. provision of all structural materials-angle, channel, beam, plates, pipes, elbow & fittings etc. is in am/ns scope. 5. co-ordination for shutdown and work permit is in am/ns scope. 6. drinking water, power supply, lighting facilities, working platform, etc. for workmen at plant site is in am/ns scope. 7. sand blasting in am/ns scope. (if required) 8. all welding electrodes which do not come under aws specification (special electrode) are in am/ns scope. 9. hydraulic power pack, jack are in am/ns scope (if required). 10. all required ndt items will be provided by am/ns scope. important note: use all the ppe required at smp1 (frp helmet, frp jacket, safety shoe, safety goggles, safety hand gloves and nose mask) safety is vendor’s responsibility. amnsi will explain hazards in the job during tbt / hirac discussion. vendor has to monitor behaviour of associates periodically page 8 of 13 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat-hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109835 date 06.04.2024 submission date 14.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details from hse point of view and ensure required correction. consumables will be in vendors scope except paint/ protective coating. shift the removed equipment / scrap to designated repair area / scrap area. ensure proper housekeeping near the working area after job completion. invoice will be certified after proper housekeeping only. movement of manpower / associates at our hazira site. movement of manpower / associates at our hazira site. 1. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. 2. vendor must ensure the availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. other terms: associate has to undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. specific penalty for non-performance by vendor and must be cardinally measured. a. non-conformity of work. b. penalty will be imposed in case of noncompliance to hse norms. c. penalty will be applicable due to poor workmanship, safety violation, damage to am/ns property from contractor side. d. as per management directive, transport / movement of associates to & from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. item note : 6 2000143111 680 60 10 dismantling of pipe ms sch 40 1,400 inm email : kaushal.patel1@amns.in contact : name : kaushal patel item details : ccp # 2 capital s/d takeover piping job ccp1<(>&<)>2 water tunnel is having cluster of pipelines (spray water + spray air + machine & mould cooling etc) lying from utility dept to caster through water tunnel. ageing of that pipe more than 29 years and now it needs to be changed as per requirement & based on opportunity in capital sd in month of may 24. condition of caster 1 & 2 take over point is very critical & also having leakages at few points. plan to change the same in capital sd in month of may 24. vendors scope : (1) fabrication of pipe as per requirement / based on actual measurement at water tunnel. (2) pipe & related fitting (elbow + tee) to shift from central store to water tunnel with help of crane & some extent manually up to water tunnel safely. lot off manual rigging involved. heat & dust as well as chance for water also at tunnel. need to dry first. (3) certified tools - welding set + cutting set + tools + tackles + grinding wheel etc will be in vendors scope. (4) welding rod in vendors scope. considered e-7018 electrodes for the fabrication. (5) dp test to be done as per site requirement after welding. (6) painting/ protective coating to be done if required. page 9 of 13 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat-hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109835 date 06.04.2024 submission date 14.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details (7) pipe support to be fabricated & erected as per requirement. (8) inspection will be done by am/ns base on dimension & dp test reports. (9) competent supervisor all the time during job execution to monitor quality of work and safety & behaviour of associates. scope of work- am / ns india: - 1. supervision and job certification for executed jobs is in am/ns scope. 2. provision of drawing & design / sketch is in am/ns scope as per plant requirement considering critical. 3. provision of all spares including paint for fabrication job execution is in am/ns scope. 4. provision of all structural materials-angle, channel, beam, plates, pipes, elbow & fittings etc. is in am/ns scope. 5. co-ordination for shutdown and work permit is in am/ns scope. 6. drinking water, power supply, lighting facilities, working platform, etc. for workmen at plant site is in am/ns scope. 7. sand blasting in am/ns scope. (if required) 8. all welding electrodes which do not come under aws specification (special electrode) are in am/ns scope. 9. hydraulic power pack, jack are in am/ns scope (if required). 10. all required ndt items will be provided by am/ns scope. important note: use all the ppe required at smp1 (frp helmet, frp jacket, safety shoe, safety goggles, safety hand gloves and nose mask) safety is vendor’s responsibility. amnsi will explain hazards in the job during tbt / hirac discussion. vendor has to monitor behaviour of associates periodically from hse point of view and ensure required correction. consumables will be in vendors scope except paint/ protective coating. shift the removed equipment / scrap to designated repair area / scrap area. ensure proper housekeeping near the working area after job completion. invoice will be certified after proper housekeeping only. movement of manpower / associates at our hazira site. movement of manpower / associates at our hazira site. 1. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. 2. vendor must ensure the availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. other terms: associate has to undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. specific penalty for non-performance by vendor and must be cardinally measured. a. non-conformity of work. b. penalty will be imposed in case of noncompliance to hse norms. c. penalty will be applicable due to poor workmanship, safety violation, page 10 of 13 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat-hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109835 date 06.04.2024 submission date 14.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details damage to am/ns property from contractor side. d. as per management directive, transport / movement of associates to & from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. item note : 7 2000143111 690 70 10 erection of pipe ms sch 40 1,400 inm email : kaushal.patel1@amns.in contact : name : kaushal patel item details : ccp # 2 capital s/d takeover piping job ccp1<(>&<)>2 water tunnel is having cluster of pipelines (spray water + spray air + machine & mould cooling etc) lying from utility dept to caster through water tunnel. ageing of that pipe more than 29 years and now it needs to be changed as per requirement & based on opportunity in capital sd in month of may 24. condition of caster 1 & 2 take over point is very critical & also having leakages at few points. plan to change the same in capital sd in month of may 24. vendors scope : (1) fabrication of pipe as per requirement / based on actual measurement at water tunnel. (2) pipe & related fitting (elbow + tee) to shift from central store to water tunnel with help of crane & some extent manually up to water tunnel safely.- lot off manual rigging involved. heat & dust as well as chance for water also at tunnel. need to dry first. (3) certified tools - welding set + cutting set + tools + tackles + grinding wheel etc will be in vendors scope. (4) welding rod in vendors scope. considered e-7018 electrodes for the fabrication. (5) dp test to be done as per site requirement after welding. (6) painting/ protective coating to be done if required. (7) pipe support to be fabricated & erected as per requirement. (8) inspection will be done by am/ns base on dimension & dp test reports. (9) competent supervisor all the time during job execution to monitor quality of work and safety & behaviour of associates. scope of work- am / ns india: - 1. supervision and job certification for executed jobs is in am/ns scope. 2. provision of drawing & design / sketch is in am/ns scope as per plant requirement considering critical. 3. provision of all spares including paint for fabrication job execution is in am/ns scope. 4. provision of all structural materials-angle, channel, beam, plates, pipes, elbow & fittings etc. is in am/ns scope. 5. co-ordination for shutdown and work permit is in am/ns scope. 6. drinking water, power supply, lighting facilities, working platform, etc. for workmen at plant site is in am/ns scope. 7. sand blasting in am/ns scope. (if required) 8. all welding electrodes which do not come under aws specification (special electrode) are in am/ns scope. 9. hydraulic power pack, jack are in am/ns scope (if required). 10. all required ndt items will be provided by am/ns scope. important note: use all the ppe required at smp1 (frp helmet, frp jacket, safety shoe, safety goggles, safety hand gloves and nose mask) safety is vendor’s responsibility. amnsi will explain hazards in the job during tbt / hirac discussion. vendor has to monitor behaviour of associates periodically from hse point of view and ensure required correction. page 11 of 13 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat-hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109835 date 06.04.2024 submission date 14.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details consumables will be in vendors scope except paint/ protective coating. shift the removed equipment / scrap to designated repair area / scrap area. ensure proper housekeeping near the working area after job completion. invoice will be certified after proper housekeeping only. movement of manpower / associates at our hazira site. movement of manpower / associates at our hazira site. 1. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. 2. vendor must ensure the availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. other terms: associate has to undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. specific penalty for non-performance by vendor and must be cardinally measured. a. non-conformity of work. b. penalty will be imposed in case of noncompliance to hse norms. c. penalty will be applicable due to poor workmanship, safety violation, damage to am/ns property from contractor side. d. as per management directive, transport / movement of associates to & from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. item note : 8 2000143111 700 80 10 fabrication & erection of ms steel 10 to email : kaushal.patel1@amns.in contact : name : kaushal patel item details : ccp#2 cap sd-support fab-erec of structu methodology of the job execution,,,,,,,,,,,,,,,, ccp1<(>&<)>2 has a technological structure which is called as cooling chamber. cooling chamber comprises of fabricated beams, columns, gratings, doors & guide rails along with rolled sections & plates etc. various fabricated beams, columns & brackets (as per annexure) are in very bad condition due to exposure to hot steamy environment inside the cooling chamber. this will require the removal / fixing of new fabricated beams & columns for execution of the job. ,,,,,,,,,,,,,,,, following jobs to be carried out:-,,,,,,,,,,,,,, preparatory jobs : ,,,,,,,, *lifting/shifting of all the fabricated beams, columns, brackets and other required supporting materials.,, *ready to fix components such as brackets, box, lifting hooks & plates to be prepared in advance,,,,,,,,,,,, 1. removal of existing beam & column.,,,,,,,,,,,,,,,, 1.1get the work permit and all necessary approvals.,,,,,,,,,,,,,,,, 1.2additional supports/locking of nearby structures to be done to prevent them falling down.,,,,,,,,,,,, 1.3existing damaged beam, column & brackets to be removed. activity require chipping , gas cutting & precise lifting / shifting by chain pulley block as well as eot crane.,,,,,,,,,,,,,,,, 2. placing new beams/columns in position,,,,,,,,,,,,,,,, 2.1 new structure (beam/column) to be shifted to the position. this activity requires precise lifting / shifting by chain pulley block & eot page 12 of 13 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat-hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109835 date 06.04.2024 submission date 14.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details crane.,,,,,,,, ,,,,,,,, 2.2 adjust the beam/column as per the required length. this activity requires taking accurate measurements, marking & cutting. ,,,,,,,, 2.3 place the beam / column in position and adjust it.,,,,,,,,,,,,,,,, 2.4 fabricate of base plate (at column support), new brackets and fixing in their position along with erection of beam,,,,,,,,,,,,,, 2.5 proper welding to be done at the position. some locations have difficult positions for welding.,,,, ,,,,,, 3. inspection & boxing up ,,,,,,,,,,,,,,,, 3.1 inspection of the installed structures.,,,,,,,,,,,,,,,, 3.2 inspection for any abnormality and rectifying the same before handover.,,,,,,,,,,,,,,,, 4. normalizing,,,,,,,,,,,,,,,, 4.1 return the permits and handover to operations for production.,,,,,, ,, ,,,,,,,, 5. other,,,,,,,,,,,,,,,, 5.1 house keeping of area. shifting of scrap material (old beams / columns) to designated area.,, 5.2 certified tool & tackles like welding machine, gas cutting set & grinding machine, consumables, component shifting, etc. are in contractor scope.,,,,,,,,,,,,,, 9. all kind of safety and precautionary majors are to be taken while working in this area. a few are:,,,,,,,,,,,, a. make safety part of your job & strictly adhere to work at height guidelines.,,,,,,,,,,,,,,,, b. always use suitable ppes and ensure tight clothing while inspection job.,,,,,,,,,,,,,, c. safe distance must be maintained in case of running / online equipment inspection job.,,,,,,,,,,,,,, d. all loose objects / components should be removed or brought to the notice of the respective in-charge.,,,,,, e. proper communication is required when more than one agency is working.,,,,,,,, ,,,,,,,, special precautions ,,,,,,,,,,,,,, extreme care with dedicated supervision is required during total execution of the job. job required extensive working at height on multiple levels, so proper care must be taken such as height pass, use of safety belts, proper platform etc. ,,,,,,,, a.,,use all the ppe required at smp1 (frp helmet, frp jacket, safety shoe, safety goggles, safety hand gloves and nose mask). safety is vendor’s responsibility. amnsi will explain hazards in the job during tbt / hirac discussion. vendor has to monitor behaviour of associates periodically from hse point of view and ensure required correction.,,,,,, b. consumable + welding m/c + cutting set + tools + tackles will be in vendors scope.,,,,,,,,,,,,,, c. use e-7018 welding electrodes for all the welding jobs.,,,,,,,,,,,, ,, d. shift the removed equipment / scrap to designated repair area / scrap area. ensure proper housekeeping near working area after job completion. ,,,,,,,,,,,,,,,, e. movement of manpower / associates at our hazira site. 1. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. 2. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. page 13 of 13 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat-hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000109835 date 06.04.2024 submission date 14.04.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details other terms: associate has to undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass.,,,,,,,,,,,, f. penalty for non-compliance: penalty will be recovered from the monthly payment if vendor is not able to achieve required service levels as mentioned below: - if vendor will delay in job execution / equipment refurbishment as per plant requirement. job to be carried out anytime (24x7, 365days). - if vendor does not deploy the required specified quantity & quality of manpower as per rfq or a person deployed is not reporting to the duty. - while normal duty hours are 8 per day, more than 16 hours continuous duty is not allowed on any day. - if safety violation during job execution. minimum 3% penalty will be applicable on a monthly bill value. penalty in two consecutive months will make contractor eligible for either termination of contract or penalty more than 10%.