Tender For Old Hrwctl Filling & Rcc 27019479 10 10 60 RCC-M30 -FLOORING INCLUDING SHUTTERING 119 M3 80 GROOVE FILLING WITH POLYSULPHIDE SEALANT 341 M 90 EXPANSION JOINTS IN CONCRETE WITH POLYME 116 NO 30 Breaking of RCC & shifting of debris 42 M3 10 PROVIDING & LAYING MURRAM 548 M3 70 PROVIDING & FIXING OF REINFORCEMENT 11.5 TO 20 FILLING GSB STONE DUST MIX WD C/AGGREGAT 75 M3 40 RCC CUTTING BY DIAMOND CUTTER 167 M 50 PROVIDING & LAYING PCC M15 GRADE 48 M3 Email : GURUVEER.SINGH@AMNS.IN Contact : Name : Guruveer Singh Item Details : 1 3013228 Providing and filling Murum brought from outside for Subgrade and proper compaction and laying good quality hard murum including soil sample approve by NABL lab, placing, spreading, watering, hard barrication,hammering and even compaction by plate compactor, fill area compaction by use vibro of 10 Ton / 12 Ton roller compaction or any other mean plate compactor instructed by Engineer-in-charge to achieve CBR Value 4 (compaction should be at least 95% of standard proctor density), thickness of backfilled layers should not exceeding 300 mm in depth, complete bye works as per specification or instruction by Engineer-in-charge. (The measurement for payment shall be for the theoretical net volume only as per site joint measurement before start the work i.e. for the volume of the block of the Backfilling having the depth and maximum bottom dimensions of the foundation/structures as per site. ) cum 548 2 3016875 Construction of granularsub-base by providing close graded Material,mixing in a mechanical mix plant at OMC, Filling as a subgrade including Transportation, grading <(>&<)> compaction (rolling, <(>&<)> watering) to achieve CBR Value (95% Standard Proctor Density) <(>&<)> 200 MM in depth complete. Cost should include all the expenditure for material, permits, excavation, loading, unloading, transportation, placing,NABL approved Lab tests, compaction with 12 MT vibratory roller to achieve the desired density etc. and Clause 401-Plant Mix Method and Grading -II Materials complete by works as per instruction of Engineer-in-charge. cum 75 3 3008803 Breaking and chipping the top concrete of machine wall <(>&<)> floor area to the correct level including removing of debride, reinforcement, embedded inserts, plate, angle, channel, any structure materials etc, <(>&<)> cleaning the concrete surface and to complete as per drawings, specifications and directions of the Engineer-in-charge, all including materials, tools, machinery,hard barrication and labour complete. Before breaking any area measurement to be record with the Engineer-in-charge for payment. Including stacking steel materials properly with all leads <(>&<)> lifts within boundary and carting away unserviceable material as directed by Engineer-in-charge. cum 42 4 3012225 DIAMOND SAW CUTTING IN RCC Diamond saw cutting in RCC floor 300mm depth as per specifications and directions of the Engineer-in-charge, all including materials, tools, machinery, labour and with safety complete. Before cutting any area measurement to be record with the Engineer-in-charge for payment. Rmt 167 5 3015469 Providing and laying 100 mm thick flooring M-15 grade (1:2:4) with Coarse aggregate nominal size of 20 mm with RMC including cement (Fly ash content shall not be more than 10%. Design mix and test certificate needs to be approved by Engineer in Charge.) mixed in a batching plant/ Weigh batch mixer, transported to site with all leads and lifts as approved by Engineer-incharge, compacting with vibrator, finishing, curing, mix design,shuttering and including preparation of sub-grade surface if required etc. (Mode of measurement shall be as per IS code) Concrete mix design approved by Engineer-in-charge. Cement :- Ultratech , JK cement , Shree cement , ACC , Ambuja . Cum 48 6 3016078 Vacuum dewatered TREMIX Flooring 250mm thick RCC work : Supplying <(>&<)> providing vacuum dewatered flooring by TREMIX or approved equivalent system with reinforced cement concrete of grade M30 as defined by IS:456 with 20 mm down graded stone aggregates in panels of approved sizes including providing side-shuttering for panels with M.S. channels, vibrating the concrete with immersion and surface vibrators and dewatering by filter mat and suction pump of approved make, finishing the top surface by floating and trowelling to required level and grade using skim floater fitted with a floating disc and/or trowelling blades of approved make, covering the finished concrete surface with approved polythene sheets, groove cutting, Polysulphide sealant filling, including non-metallic surface floor hardener FOSROC/BASF make of approved colour floor hardner 5kg/sqm, including curing ponding, Separation Membrane of impermeable plastic sheeting thick as per drawings specification, mix design,all as per drawings, manufacturers specifications and directions of the Engineer, all materials, tools, plant and labour complete.and curing by curing compound/ by providing commentate in cement Mortar 1:8 @ 0.6mX0.6m Centre to Centre, admeasuring 80 mm at bottom and 40 mm at top with depth of 75 mm and maintaining the same throughout curing period by any other method approved by Engineer-in-charge. If quality issue are found after concreting, vendor shall be attend all tests <(>&<)> rectify free of cost. The surface tolerance shall not exceed 3mm in 3m length measured by straight edge in any direction. Note : Appling surface Fosroc Nitobond EP Bonding Agent on floor to bond old concrete with new concrete. The rate for reinforcement to be paid separately. Cum 119 7 3015471 Providing TMT 12mm/Double Jalli 150mm Reinforcement : Supplying, cleaning, straightening ,cutting, bending fabricating and placing in position Thermo-mechanically Treated (TMT) bars of Fe 550 D (IS 1786-66, reinfroement to be considered) of different diameters, cutting, bending to required sizes and shapes including fabricating, chair, handling from any lead within plot and transport complete for all RCC works with GI binding wire of 18 gauge with double stranded for reinforcement work as per approved designs and drawings, including PVC / readymade concrete cover blocks of same concrete grade. (Make - TISCO, SAIL, VIZAC, ET, JSW, TATA). Quantity shall be paid only after work completion. Reinforcement supplied by vendor scope with MTC test certificate. MT 11.50 8 3016077 CONSTRUCTION AND CONTROL JOINT WITH SEALANT :- Cutting grooves using floor saw at construction joints 4mm wide <(>&<)> depth 12mm <(>&<)> Control join with panels of size 4.5m x 4.5m for following width and depth. Saw cut shall be performed within 24 hrs from the time of mixing of the concrete. Cost shall include all the material, machine and labour complete for the job etc., complete as directed by Engineer in charge... Filling the joint by Polysulphide sealant with COLPOR200 PS of FOSROC or equallent approved make sealant applied over primer laid as per manufactures specifications etc., all complete as directed by Engineer-in-Charge. Rmt 341 9 3016867 Expansion joint FILLER BOARD :- Providing and placing of Hydrocel-XL Board in position in horizontal and vertical planes 20 mm thick x 200 mm deep Dura board of Cross Linked Polyethylene Foam in HD-100 Grade, white Colour, Supreme Industries Limited at expansion / isolation joint locations etc.., including top 20 x 50 mm to be cut in proper line and refixing in position using double sided adhesive tape, for filling the sealant with COLPOR200 PS of FOSROC or equallent approve brand sealant applied over primer laid as per manufactures specifications etc as directed by Engineer-in-Charge. (Unit No = Rmt) Rmt 116 Item Note : VENDOR SCOPE :- CIVIL JOB OF HRWCTL filling <(>&<)> Rcc Flooring Work (CD Bay), EXISTING FLOOR AT CD BAY DISMANTLING <(>&<)> RECONSTUCTION, Peripheral Road Extension, Drain Crossing Culverts AT CHENNAI SC 1. All the Material <(>&<)> machine and tools for the above jobs will be in Vendors Scope. Construction <(>&<)> drinking water, HR <(>&<)> legal compliance in Vendor scope. AMNS shall provide a single point for electrical, and vendor shall take the supply from that point to workplace with all necessary safety arrangement in vendor scope. Power for area lighting and working light shall be arranges by the vendor scope. 2. All the tools and tackles for the above job will be vendors scope and it must be approved by AM/NS Safety In charge prior to work. 3. Provided dump site/yard maximize utilization with Necessary resources in the vendor scope. Proper leveling of the dump site to be done by vendor. 4. Cutting set <(>&<)> consumables required for rebar cutting <(>&<)> fixing will be in vendor scope. 5. Welding machines and consumables will be in vendor’s scope. 6. If ready mixed concrete to be brought from outside, RMC mix design should be approved by Engineer. 7. Collection of material if any shall be uniform throughout the length of road. 8. Curing of Works must be maintained in accordance to the BOQ etc. 9. All earth inert and subgrade or subbase materials, all RCC work and their necessary external lab reports (NABL approved- Lab), MTC and quality checks on regular frequency should be conducted and get report approvals from AMNS authority is in contractor scope. No payment shall be made on the basis of material delivery, all bills will only be processed for service work done. 10. If the quality and strength as per acceptance criterion is not achieved, then the work will not be accepted, and payment of such substandard work will not be made to the contractor. No extra amount on account of providing core cutter testing facility would be admissible to contractor. 11. Contractor need to submit daily progress, weekly, monthly PPT report with site photographs report to AMNS project team. 12. All manpower should be entered in work premise after necessary documentation followed by contractor as per AMNS rules, administration, and security department documentation, OHC fitness certificate documentation and safety induction training. 13. After receiving PO contractor should be ready to mobilize required Poclain, JCB, tractor, JCB braker, Dimond cut machine, dumper, vibro roller, dewatering pump, sub grade all approved materials, reinforcement, RMC, material test <(>&<)> all plant <(>&<)> machinery supply withing timeline schedule. 14. Safety officer <(>&<)> team to be assigned by vendor for these jobs. 15. Experience Project head, Civil Engineer team, QC engineer, supervisor <(>&<)> surveyor must be deployed at site during job work execution. 16. Work permit to be taken before starting work. Hard barricading while working at site and use safety precautions tape (night reflector tape) and use safety signage to prevent safety failures at site. Use cone or metal stand while work near to the roadside because heavy movement of trolleys, truck on roadside. Ensure proper hard barricading before starting any of the job activity on site with housekeeping otherwise penalties will be applicable. 17. Safety PPEs Helmet, Safety shoes, hand gloves, goggles, safety jackets <(>&<)> required for this job all PPEs are mandatory for work. 20. All work to be executed as per AMNS India quality and Safety norms. 20. Valid Govt. ID Proof is mandatory while entering the premises. 21. ESIC No. is mandatory for entering the premises. 22. All the workmen should be 18 Years and above. 23. Works shall be completed withing 4 months from the date of issuance of work. 24. Security Deposit shall be refunded two years from the date of actual completion of the work provided the final bill has been paid. During this period, the contractor shall carry out repair, replace and rectifications of defects (if any) of the job at his own cost, failing which it shall be carried out at risk <(>&<)> cost of the contractor and expenditure so incurred shall be recoverable from the contractor. After the completion of D.L.P. Period, contractor should obtained the certificate from the Engineer in charge regarding the completion of routine maintenance, only after that he is free from the liability. 25. LD will be applicable @ 5% per week delay to Max 10% on basic Purchase Order Value. 26. If the work is not performed well as per the scope explained will be penalized including termination of the contract. 27. Vendor should be visiting the plant <(>&<)> site location and study <(>&<)> understood all job work before RFQ and aware of the nature of work. checklist, handover paper, materials MTC, as built drawings, all war ranty paper, etc. all in vendor scope. 29. Vendor is responsible to get all loyalty / statutory permission for transportation materials for borrow areas. 30. Local issue and any legalizing issue in Vendor scope. 31. Safety and security of the contractor’s all site materials <(>&<)> machinery in vendor scope. YOU SHALL SUBMIT FOLLOWING DOCUMENTS WITH BILLS IN PRESCRIBED FORMATS: - MEASUREMENT BOOK - (IF ANY -DULY CERTIFIED BY AM/NS <(>&<)> YOURSELF). GATE ENTRY (IF ANY). MATERIAL RECONCILIATION (IF ANY). BILLS CERTIFIED BY AM/NS OFFICER-IN-CHARGE. All civil items materials and their necessary external lab reports (NABL approved- Lab), MTC and quality checks on regular frequency should be conducted and get report approvals from AMNS authority is in contractor scope. No payment shall be made based on material delivery; all bills will only be processed of service work done. NOTE: ALL OTHER TERMS <(>&<)> CONDITIONS AS PER OUR GENERAL CONDITIONS FOR CONTRACT. KINDLY RETURN THE DUPLICATE COPY OF THIS ORDER DULY SIGNED BY YOU AS A TOKEN OF YOUR ACCEPTANCE.