Ash Handling System Package For Lara Stpp Stage-Ii 2X800 Mw Ash Handling System Package For Lara Stpp Stage-Ii 2X800 Mw Chhattisgarh , Design, Engineering ( Including 3D Modelling Of Complete Ahp ) , Selection Of Equipment, Manufacturing, Supply, Inspection & Testing, Shop Floor Testing, Shop Floor Painting, Packing & Forwarding, Touch Up Paints, Consumables Etc Of The Following Including Customs Clearance / Port Clearance. , Complete Ash Handling System ( Mechanical, Civil & Structural, Electrical And C&I Equipment / Items ) As Per The Scope Of Specification ( Except Item Sl. No. 1.2 To 1.6 Below ) . , Complete Wet Bottom Ash Handling System ( Mechanical, Civil & Structural, Electrical And C&I Equipment / Items ) From Boiler Seal Plate Assembly, Bottom Flange Of Eco, Eco Outlet, Aph And Duct Hoppers To The Bottom Ash Slurry Sumps For Unit #1 & 2 As Per The Scope Of Specification. , Complete Dewatering Bin System ( Mechanical, Civil & Structural, Electrical And C&I Equipment / Items ) From Slurry Dury Knife Gate Valves At Dewatering Bin Top To The Discharge Of Ash To The Mixing Tanks For Unit 1&2 Along With All Associated Equipment At Dewatering Bins As Per The Scope Of Specification. , Fly Ash Classification System ( Mechanical, Civil & Structural, Electrical And C&I Equipment / Items ) At Classifier Silo, Fine Ash & Coarse Ash Hoppers For Unit #1 & 2 As Per The Scope Of Specification. , Fly Ash Bagging System ( Mechanical, Civil & Structural, Electrical And C&I Equipment / Items ) At Fine Fly Ash Silo To Storing At Bagging Shed, Retrieval And Truck Loading For Unit #1 & 2 As Per The Scope Of Specification. , Hcsd Pumps For Unit #1 & 2 As Per The Scope Of Specification. , Spares-Manufacturing, Supply, Inspection & Testing, Shop Floor Testing, Shop Floor Painting, Packing & Forwarding, Unloading, Receipt, Storage, Intra Site Handling And Handing Over To End Customer. , Commisssioning Spares For Complete Ahp As Per The Scope Of Specification , Mandatory Spares For Complete Ahp As Per As Per The Scope Of Specification. , Services-Erection & Commissioining, Unloading, Receipt, Storage Including Intra Site Handling, Painting At Site, Trial Run, Pg Test, Handing Over To End Customer , Erection And Commissioning For ( Sl. No. 1.1 Above ) Complete Ash Handling System ( Mechanical, Civil & Structural, Electrical And C&I Equipment / Items ) As Per The Scope Of Specification ( Except Sl. No. 1.2 To 1.6 Above ) . , Erection And Commissioning For ( Sl. No. 1.2 Above ) Complete Wet Bottom Ash Handling System ( Mechanical, Civil & Structural, Electrical And C&I Equipment / Items ) From Boiler Seal Plate Assembly, Bottom Flange Of Eco, Eco Outlet, Aph And Duct Hoppers To The Bottom Ash Slurry Sumps For Unit #1 & 2 As Per The Scope Of Specification. , Erection And Commissioning For ( Sl. No. 1.3 Above ) Complete Dewatering Bin System ( Mechanical, Civil & Structural, Electrical And C&I Equipment / Items ) From Slurry Dury Knife Gate Valves At Dewatering Bin Top To The Discharge Of Ash To The Mixing Tanks For Unit 1&2 Along With All Asociated Equipments At Dewatering Bins As Per The Scope Of Specification. , Erection And Commissioning For ( Sl. No. 1.4 Above ) Fly Ash Classificatication System ( Mechanical, Civil & Structural, Electrical And C&I Equipment / Items ) At Classifier Silo, Fine Ash & Coarse Ash Hoppers For Unit #1 & 2 As Per The Scope Of Specification. , Erection And Commissioning For ( Sl. No. 1.5 Above ) Fly Ash Bagging System ( Mechanical, Civil & Structural, Electrical And C&I Equipment / Items ) At Fine Fly Ash Silo To Storing At Bagging Shed, Retrieval And Truck Loading For Unit #1 & 2 As Per The Scope Of Specification. , Erection And Commissioning For ( Sl. No. 1.6 Above ) Hcsd Pumps For Unit #1 & 2 As Per The Scope Of Specification. , Erection, Commissioning & Operation Services For Ht Motors, Ht / Lt Swgr , Dcs Operations, As Per Scope Matrix And Detailed Technical Specification. , Erection And Commissioning Of Bhel Free Supplied Items For Unit #1 & 2 As Per The Scope Of Specification. , Operation & Maintenance , Operation And Maintenace Of Complete Ash Handling Plantas Per The Scope Of Specification. Each Shift Will Be Of Of 8 Hrs Duty. , Training , Training Of Employers Perssonel ( End User ) On Complete Ash Handling System As Defined In The Nit Specification , Freight / Transportation Charges , Total Freight / Transportation Charges For Supply Of All Plant & Equipment Including Spares