Tender For Contract For Mitigation As Per Ac And Dc Interference Survey Report Of Dbpl Pipeline- 1 3170 - Mitigation Works Ac & Dc Interference-Karnataka 2 Supply, Installation, Testing And Commissioning Of New Bigger Size Cp Test Station With Terminal Board Including Liasoning With The Land Owner, Transportation, Excavation, Concreting As Per The As Per Sow, Scc & Drawings And As Per The Directions Of Eic 3 Supply, Installation, Testing And Commissioning Of New Bigger Size Test Stations On Available Foundation With Terminal Boardby Replacing The Existing Tlp Boxincluding Liaisoning With The Land Owner, Cuttingfrom The Existing Post And Welding The New Tlp Boxat Site Complete The Job In All Respects Includingmaterials For Cutting , Welding , Arrangement Of Portable Generator, Tools And Tackles Like, As Per Sow, Scc & Drawings And As Per The Directions Of Eic 4 Supply, Installation, Testing And Commissioning Of Copper Awg6 ( Ac Mitigator ) Cable Termination, End Sealing, Including Liasoning With The Land Owner, Transportation, Excavation, Laying , Spreading Of Backfill Material All Around 100 Mm, Watering , Back Filling Of Trench And Restoration , Labour, Consumables, Tools And Tackles As Per Specifications And As Per Sow, Scc & Drawings And As Per The Directions Of Eic. 5 Supply, Installation, Testing And Commissioning Of Solid State Decoupler ( Ssd ) - Kristonmake In Test Station, Termination Of Cable Ends, Testing And Commissioning Of Solid State Decoupler Including Required Terminal Lugs, Clamps And Hard Wares As Per The Specifications And Sow, Scc & Drawings And As Per The Directions Of Eic 6 Design, Fabrication, Supply & Installation Of Corrosion Coupon 1 Cm2 With Magnetic Read Switch, Shunt Etc. As Per Nace Sp 0104-2014, In The Existing Test Station, For Measurment Of Ac / Dc Voltage, Polarised Psp, Ac Corrosion Etc: Supply & Installation Of Polarization Coupons & Measurement Of Ac / Dc Current Density. The Job Shall Be Carried Out As Per The Scope Of Work Mentioned In The Tender Document. Installation Including All Associated Electrical, Civil ( Excavation ) & Mechanical Works And Any Compensation For The Crop Loss During Work Execution Will Be In The Scope Of Contractor And As Per Sow, Scc & Drawings And As Per The Directions Of Eic 7 Supply, Installation, Testing And Commissioning Of Gradient Earthing Mat At Sv Station / Customer Terminal As Per Sow, Scc & Drawings And As Per The Directions Of Eic 8 Supply & Spreading Of Stone / Gravelat Sv Station / Customer Terminal As Per Sow, Scc & Drawings And As Per The Directions Of Eic 9 Pin Brazing On Pipeline For Making Pipe To Cable Connection On Pipe Line Up To The Size Of 25 Sqmm As Per The Approved Procedure Including Liasoning With The Land Owner, Required Size Of Pin, Excavation, Cleaning Of Surface, Brazing, Sealing Of Connection Point And Backfilling As Per Scope Of Work As Per Specifications And As Per Sow, Scc & Drawings And As Per The Directions Of Eic 10 Supply And Laying Of 1Core X 6Sq.Mm Copper Armoured Cable As Per Specifications And Sow, Scc & Drawings And As Per The Directions Of Eic 11 Supply And Laying Of 1Core X 10 Sq.Mm Copper Armoured Cable As Per Specifications And Sow, Scc & Drawings And As Per The Directions Of Eic 12 Supply And Laying Of 1Core X 25 Sq.Mm Copper Armoured Cable As Per Specifications And Sow, Scc & Drawings And As Per The Directions Of Eic 13 Dc Interference Monitoring Recommended Works : Supply, Installation, Testing And Commissioning Of New Test Big Station Andreference Electrodes In The Soil Access Tube , Transportation, Excavation, Concreting As Per The As Per Sow, Scc & Drawings And As Per The Directions Of Eic 14 3165-Mitigation Works Ac & Dc Interference-Maharastra 15 Supply, Installation, Testing And Commissioning Of New Bigger Size Cp Test Station With Terminal Board Including Liasoning With The Land Owner, Transportation, Excavation, Concreting As Per The As Per Sow, Scc & Drawings And As Per The Directions Of Eic 16 Supply, Installation, Testing And Commissioning Of New Bigger Size Test Stations On Available Foundation With Terminal Boardby Replacing The Existing Tlp Boxincluding Liaisoning With The Land Owner, Cuttingfrom The Existing Post And Welding The New Tlp Boxat Site Complete The Job In All Respects Includingmaterials For Cutting , Welding , Arrangement Of Portable Generator, Tools And Tackles Like, As Per Sow, Scc & Drawings And As Per The Directions Of Eic 17 Supply, Installation, Testing And Commissioning Of Copper Awg6 ( Ac Mitigator ) Cable Termination, End Sealing, Including Liasoning With The Land Owner, Transportation, Excavation, Laying , Spreading Of Backfill Material All Around 100 Mm, Watering , Back Filling Of Trench And Restoration , Labour, Consumables, Tools And Tackles As Per Specifications And As Per Sow, Scc & Drawings And As Per The Directions Of Eic. 18 Supply, Installation, Testing And Commissioning Of Solid State Decoupler ( Ssd ) - Kristonmake In Test Station, Termination Of Cable Ends, Testing And Commissioning Of Solid State Decoupler Including Required Terminal Lugs, Clamps And Hard Wares As Per The Specifications And Sow, Scc & Drawings And As Per The Directions Of Eic 19 Design, Fabrication, Supply & Installation Of Corrosion Coupon 1 Cm2 With Magnetic Read Switch, Shunt Etc. As Per Nace Sp 0104-2014, In The Existing Test Station, For Measurment Of Ac / Dc Voltage, Polarised Psp, Ac Corrosion Etc: Supply & Installation Of Polarization Coupons & Measurement Of Ac / Dc Current Density. The Job Shall Be Carried Out As Per The Scope Of Work Mentioned In The Tender Document. Installation Including All Associated Electrical, Civil ( Excavation ) & Mechanical Works And Any Compensation For The Crop Loss During Work Execution Will Be In The Scope Of Contractor And As Per Sow, Scc & Drawings And As Per The Directions Of Eic 20 Supply & Spreading Of Stone / Gravelat Sv Station / Customer Terminal As Per Sow, Scc & Drawings And As Per The Directions Of Eic 21 Pin Brazing On Pipeline For Making Pipe To Cable Connection On Pipe Line Up To The Size Of 25 Sqmm As Per The Approved Procedure Including Liasoning With The Land Owner, Required Size Of Pin, Excavation, Cleaning Of Surface, Brazing, Sealing Of Connection Point And Backfilling As Per Scope Of Work As Per Specifications And As Per Sow, Scc & Drawings And As Per The Directions Of Eic 22 Supply And Laying Of 1Core X 6Sq.Mm Copper Armoured Cable As Per Specifications And Sow, Scc & Drawings And As Per The Directions Of Eic 23 Supply And Laying Of 1Core X 10 Sq.Mm Copper Armoured Cable As Per Specifications And Sow, Scc & Drawings And As Per The Directions Of Eic 24 Supply And Laying Of 1Core X 25 Sq.Mm Copper Armoured Cable As Per Specifications And Sow, Scc & Drawings And As Per The Directions Of Eic